Loading…
Loading…
3,686 results • Best match
Renovation of 2 no Fall of D4 SBC and Repair work of HR RM3A of Pipalkheda Canal and VRB at RD 2190 M of RM1 of SBC
Removal of Grass, shrubs bushes and other vegetations from Water bodies and slopes portions on both sides of intake canal l unit I to V SGTPS, Birsinghpur.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF BELKHEDI TAIL MINOR RD. 4.82 KM. TO RD. 13.20 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF MAJHOLI TAIL DISTRIBUTRY R.D. 0.27 KM. TO R.D. 18.00 KM. RIGHT BANK CANAL OF BARGI DIVERSION PROJECT
Repair and Reconditioning of C.R.Gate (Size 5.5 mtr. X 7 mtr. X 3 Nos) of ISP Main Canal at R.D. 680 mtr at Narmada Nagar Dist. Khandwa
In Chandrashekhar Azad Ward No. 69 construction of M-30 CC Road from the Westland Canal side to Bapu Nagar Talaiya and at Bapu Nagar. (Chairman Recommendation)
Repairing and Reconditioning work of 2 Nos. Cross Regulator Gate ( gate size 2600 x 3200) O.S.P Main Canal Phase-III RD 114.8 at Bakaner Distt-Dhar (M.P.)
FOR THE WORK OF REPAIR OF 6inch DIA G.I. PIPE LINE FOR WATER SUPPLY ARRANGEMENT OF PUMP HOUSE NO. 1 NEAR POWER HOUSE CANAL DIVISION BARGI NAGAR
REPAIR AND MAINTENANCE OF HR/CR/ESCAPE GATE OF LEFT BANK CANAL CHAIN NO 1300 TO 2600 OF RSP KUDWA DISTT BALAGHAT FOR THE YEAR 2024-25
Repair and Maintenance of canal gates of Ambah branch canal
Annual repair work of Depalpur tank canal (odhi) underground canal
Construction of civil foundation work for 1 No. 33 KV feeder bay at 132 KV S/s Batiyagarh for Water Resources substation Hatta for Irrigation project at village Sitanagar. (Consumer Contribution)
P.S. to 01 No. 05 HP New Permanent Irrigation Pump Connection to Shri Tulsiram S/o Shri Ramcharan at Village Silari under Gurra D/c. of O and M Dn. Itarsi.
On Turnkey Basis Construction of Hume Pipe culvert for Kajali to Hirdi under in submergence of Parasdoh Medium Irrigation project, as per detailed scope of work but not limited to that
Estimate for P.S to Kamlesh Kumar Yadav (Regi. No. DS20230947568) for Irrigation Purpose at Installation 25 KVA DTR at Village Kesla Khurd under Gurra D/c O and M Dn. Itarsi
Estimate for installation of 33 No. 140 Kg. Pcc Mid Span pole of 11 KV Line Various Irrigation and DLF Feeder Under Chandone D/c of O and M Dn. Pipariya.
P.S. to 01 No. 05 HP new permanent irrigation pump connection to Smt. Ratni Bai / Shri Phool Singh at Village Khatama under Pathrota D/c. of O and M Dn. Itarsi
Shifting of 11 KV and LT Line with DTR at Near Village Semra Ahir to Pipriya Illyi affected by Submergence area of Banda Irrigation Project Complete work with material and labour
Estimate for Electrification of Irrigation 05 HP Pump Connection to Shri Mavasiya S o Shri Sobharam Jatav at Village- Khadran ka pura under Alapur D c Under O M Division sabalgarh
P.S. to 01 No. 05 HP new permanent irrigation pump connection to Smt. Shrivati / Shri Jugal Kishor at Village Dobi Talpura under Pathrota D/c. of O and M Dn. Itarsi.
Shifting of Various HT Line with DTR and Road Crossing at place Lakhanpur to Bansadehi including Kheri to Bhojpur (Begumganj-Raisen) affected by the submergence of Jera Dam Medium Irrigation Project
Estimate for electrification of irrigation 05 H.P. Pump connection to Shri Badriprasad Jatav S/o Shri Jaggu Jatav at village- Ramlal ka pura under Sujarma D/c Under (OandM) Division sabalgarh.
Vaniki work/Irrigation Material
Canal Work
Canal Work
Providing and Installation of Power System Combination Work by Different size of Cables in Various Equipments Installed at Pawai Medium Irrigation Project Distt. Panna (M.P.) complete work with material and Labour charges at work site as per G Schedu
Repair work of Sub Division office Building of Sontalai distributary sub division, Harda District-Harda M.P.
Repair work of Sub Division office Building of Pachola distributary sub division, Harda District-Harda M.P.
Repair work of Sub Division office Building of Rewapur distributary sub division, Harda District-Harda M.P.
Maintenance work of Existing 33 kv line in between 132 kvass chourai kunda Sideto micro pressurized irrigation pump system jamuniya particularly between Vill Signa and Bahmanwara under kunda dc chouraiChhindwara Project Number 589818
WORK OF PAINTING OF HEAD, CROSS REGULATOR GATES AND STRUCTURE AND REPAIR OF RAILING ON HOIST STRUCTURE OF LEFT BANK MAIN CANAL RD. 120.650 KM. OF R.A.B.L.S. PROJECT
Repair of Earthwork on bund, sluice, flush bar, Resectioning and Lining of canal, colaba and other structures of Bhitarwar Tank and Kudiyala Tank Scheme under Atal Bhujal Project.
Repair and Servicing of H.R. Gates Of Branch minors- Rayapura RD 1.17 KM and 3.39 KM of ISP canal including material, labour charges and testing etc. complete work.
Repairing and Reconditioning work of 1 Nos. Escape Gate ( gate size 1500 x 3200) O.S.P Main Canal Phase-III RD 114.8 at Manawar Distt-Dhar (M.P.) (Second call)
Construction of Nagod-Satna Branch Canal from R.D. 83.00 km. to R.D. 113.00 Km, including its complete distribution system up-to 40 Ha. Chak on Turn-key basis.
FOR THE WORK OF PAINTING OF CROSS REGULATOR, ESCAPE GATE, STOPLOG GATE, CRANE, RAILLING AND STRUCTURE OF RIGHT BANK MAIN CANAL R.D. 83.525 KM. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR OF HEAD, CROSS REGULATOR AND ESCAPE GATE OF RIGHT BANK MAIN CANAL R.D. 98.33 KM. AND R.D. 99.775 KM. OF BARGI DIVERSION PROJECT.
WORK FOR REPAIR OF HEAD AND CROSS REGULATOR GATE OF BELKHEDI MINOR RD. 25.500 KM. AND PIPARIYA DISTRIBUTORY RD. 25.500 KM. OF PATAN BRANCH CANAL OF R.A.B.L.S. PROJECT
FOR THE WORK REPAIR AND MAINTENANCE OF C.R. AND H.R. GATE OF MADANA DISTRIBUTORY CANAL AND M2 MINOR AT R.D. 7.00 KM. OF R.B.C. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR OF HEAD AND CROSS REGULATOR GATE OF MACHWARA MINOR RD. 0.00 KM. TO RD. 7.90 KM. OF LEFT BANK CANAL OF R.A.B.L.S PROJECT
FOR THE WORK OF REPAIR OF HEAD, CROSS REGULATOR AND ESCAPE GATE OF RIGHT BANK MAIN CANAL RD. 20.112 KM. AND RD. 25.200 KM. OF BARGI DIVERSION PROJECT.
Repair and Reconditioning of Escape gate (Size 5.5 mtr. X 7 mtr. X 4 Nos) of ISP Main Canal at R.D. 680 mtr at Narmada Nagar Dist. Khandwa
FOR THE WORK OF REPAIR OF HEAD, CROSS REGULATOR AND ESCAPE GATE OF LEFT BANK MAIN CANAL OF R.D 63.42 KM. TO R.D. 79.870 KM. OF R.A.B.L.S. PROJECT.
Maintenance of Earth work and Lining of Ukaila High Level Canal (Beyond Lalpur Pick Up Weir) between RD 2320 m to 17520 m under Sindh Project Phase-II
Repair and Servicing of H.R. Gates of I.S.P. Canal from RD 110.04 KM to RD 137.76 KM District Khargone including material, labour charges and testing etc. complete work.
FOR THE WORK OF PAINTING OF CROSS REGULATOR, ESCAPE GATE, STOPLOG GATE, CRANE, RAILLING AND STRUCTURE OF RIGHT BANK MAIN CANAL R.D. 25.200 KM. OF BARGI DIVERSION PROJECT.
Construction of Nagod-Satna Branch Canal from R.D. 55.600 km. to R.D. 83.00 Km including its complete distribution system up-to 40 Ha. Chak on Turn-key basis.
WORK OF PAINTING OF HEAD, CROSS REGULATOR GATES AND STRUCTURE AND REPAIR OF RAILING ON HOIST STRUCTURE OF LEFT BANK MAIN CANAL RD. 102.02 KM. OF R.A.B.L.S. PROJECT.
CONS OF STRENGTHENING OF CC ROAD FROM H/O PUSHPRAJ TRIPATHI TO CANAL IN WARD 15 UNDER CM INFRA SCHEME NAGAR PARISHAD GURH IN FINANCIAL YEAR 2023-24.
Cleaning of Morena Branch Canal from 0 to 36.08 and its distributaries including 21L MBC km 0 to 17.77 and 20L 21L MBC km 0 to 16.50 km