Loading…
Loading…
3,686 results • Best match
stand by arrangment of water supply to ISP and OSP colony Sanawad from OSP Canal Junction point to Morghadi colony including material, labour charges and testing etc. complete work.
stand by arrangment of water supply to ISP and OSP colony Sanawad from OSP Canal Junction point to Morghadi colony including material, labour charges and testing etc. complete work.
Survey, Investigation, Engineering, Procurement, Designing, Financing, Construction and Completing the Facilities to reach the Treated Effluent upto the end user from outlet of 245 MLD STP and sale treated effluent for Irrigation, Industry
Providing and installation of LT Line (28 K.m) at new electrification work site of rehabilitation village Panari affected by submergence of Banda Irrigation Project complete work with material and labour at work site.
Shifting of 33/11 KV substation at village Nimon with erection including 11 KV FEEDERS affected by submergence of Banda Irrigation Project District Sagar Complete work with material and labour at work site.
Shifting of 11 KV Line Including DTR at various villages (Semraata, Pitholi, Modiya, Gosai, Imaliya Khurd, Netna, Pharguwan and Motiyahaar) affected by submergence of Banda Irrigation Project Complete work with material and labour.
maintenance of Existing 33 kv line in between 132 kva s s chourai kunda Side to micro pressurized irrigation pump system jamuniya particularly between vill Kamthi and Lungsi under kunda dc chourai Chhindwara
Maintenance of Rampayli Disrty. Between ch. 0 to 172, Rengajhari minor ch. 0 to 24 Rampayli minor ch. 0 to 91 and Mehandiwada minor no 02 ch. 0 to 70 before Kharif irrigation
Requirement of unskilled and semi-skilled workers at the work site for one year period for monitoring the dam and measuring gauge of tank in Pawai medium irrigation project constructed in Panna district
PS to 4 No. New permanent irrigation pump connections to Smt. Meera/kamlesh ahirwar and 3 No. other under Kapil Dhara pump connection yojna at village Panwasa under Babai D/c Dn. Itarsi
Repair work of distributory D3A of Harsi Main Canal and its minors damaged due to heavy rain fall such as earth work,c.c.lining and structures including management operation and maintainance(MOM)for 2 years.
Annual repair and maintenance work of Khasi minor, Neemgaon minor, Dini minor no. 01 AND 02 Lingmara minor, Nawegaon minor Bhanpur minor of Mendaki branch canal of W.M.C. system.
Annual Repair and Maintenance Work of 14 Nos. Radial Gates (Size 11.940 x 6.785Ms) of Pancham Nagar Bairrage Medium Irrigation Project Under Bina PMU, WRD Sagar (M.P.) complete work with material and Labour charges at work site as per G Schedule and
Annual Repair and Maintenance Work of 11 Nos. Radial Gates (Size 12.750M x 5.60 M) of Pagra Medium Irrigation Dam Under Bina PMU, WRD Sagar (M.P.) complete work with material and Labour charges at work site as per G Schedule and direction of Engineer
Work of Line Loss Reduction 11 KV Irrigation Feeder Tajpur, Irrigation Feeder Badkumed, Irrigation Feeder Byawar, Tajpur DL Feeder, Bhaisoda DL Feeder of Tajpur DC under OnM Division Ujjain.
Oiling,Greasing and Maintenance work of canal gates of Harsi main canal gwalior
Repair and Maintanance of canal gates of harsi main canal Dabara distt Gwalior
Repairing and maintenance work of canal gates of ABC (Ambah branch canal) Morena
Repair and Maintenance work of canal gates of ABC (Ambah Branch Canal) Morena
Oiling, Greasing Maintenance work of canal gates of BMC (Bhind main Canal) Gwalior
Earthwork on bund, sluice, flush bar, Resectioning of canal, Colaba AND other structures of Kotra Tank and Chanderi Tank, Futer Tank And Ratansagar Tank Scheme at Block Baldeogarh in Distt Tikamgarh
Repairing work of Bhander Main Canal K.m. 0 to 48.8 and Daboh Distributory km. 0 to 23 with its Minors and Sub Minors including Earth work, C.C. Lining and Structures.
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF JAROND AND JUAAB MINOR AND ITS SUB MINOR OFF TAKE RD. 4.78 KM. PATAN SUB BRANCH CANAL OF R.A.B.L.S. PROJECT.
Fabrication ,supply and installation of various hoist assembly parts under repair and maintenance work of CR and escape gate at RD 5.37 km of sihawal main canal distt. sidhi (M.P.)
FOR THE WORK OF PAINTING OF HEAD AND CROSS REGULATOR, ESCAPE GATE, STOPLOG GATE, CRANE, RAILLING AND STRUCTURE OF RIGHT BANK MAIN CANAL R.D. 99.775 KM. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF PROVIDING AND FIXING OF M.S. SHEET COVER ON ROPE DRUM OF CROSS REGULATOR GATE OF RIGHT BANK MAIN CANAL RD. 42.92 KM. OF BARGI DIVERSION PROJECT.
Annual operation and maintenance of gates of Beehar Barrage, Head regulator and tail and cross regulator gates of link canal of THP for the year 2021-22 at THP, Sirmour.
FOR THE WORK OF REPAIR OF HEAD AND CROSS REGULATOR GATE OF BELKHEDI MINOR RD.10.30 KM. AND KUWARPUR MINOR RD. 10.30 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
Cleaning of Morena Branch Canal from km 0 to 36.08 and its distributaries i/c 21L/MBC km 0 to 17.77 km and 20L/MBC km 0 to 16.50 km
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF BASHA MINOR, BANDARKOLA SUB MINOR, PIPARIYA MINOR, CHHATRAPUR MINOR AND SUB MINOR OF RIGHT BANK CANAL OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR AND MAINTENANCE (PRE MONSOON) OF 02 NOS OF LEFT BANK CANAL SLUICE GATE (4.00X3.00 Mtr.) AND 01 NO. EMERGENCY GATE OF R.A.B.L.S. PROJECT BARGI NAGAR
Repair and Servicing of Escape Gate (Size 3.2m x 3.2m x 3 Nos) of I.S.P. Canal RD 77 KM District Khargone including material, labour charges and testing etc. complete work.
FOR THE WORK OF PROVIDING AND FIXING OF RAILING AND LADDER OF 3 NOS CROSS REGULATOR GATE STRUCTURE OF LEFT BANK MAIN CANAL OF R.D 130.170 KM. OF R.A.B.L.S. PROJECT.
FOR THE WORK OF PROVIDING AND FIXING OF BOX COVER OF HYDRAULIC OIL PUMP OF AUTOMATIC TILT GATE AT RD. 49.100 KM. OF RIGHT BANK CANAL OF BARGI DIVERSION PROJECT
FOR THE WORK OF PROVIDING AND FITTING OF SALITING COVER BOX OF HYDRAULIC OIL PUMP OF TILTING GATES OF RIGHT BANK MAIN CANAL RD. 49.100 KM. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR OF HEAD AND CROSSREGULATORGATE OF KANDELI DISTRIBUTORYCANALRD. 0.00 KM.AND LEFT BANK MAIN CANAL RD. 115.225 KM., RD. 120.605 KM. AND RD. 130.170 KM.OF R.A.B.L.S. PROJECT
FOR THE WORK OF REPAIR OF HEAD REGULATOR GATE OF ANDIYA MINOR R.D 3.28 KM. TO R.D 14.00 KM. AND SEMRA SUB MINOR OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT
Repair of 5 nos aqueducts, structures (HR, CR, 2 nos causeway), C.C. lining, bank raising and construction of under ground Hume pipe canal of Sagad medium project under S/R.
PRE MONSOON REPAIR AND MAINTENANCE OF SLUICE/HR GATES OF MINOR TANKS OF BILGAON H/W SUB DIVISION AND BILGAON CANAL SUB DIVISION SHAHPURA DINDORI FOR THE YEAR 2025-26
REPAIR AND MAINTENANCE OF AT RD 48830 M OF HANDIYA BRANCH CANAL AND AQUADUCT AT RD 1470 M OF RELWA MINOR OF PACHOLA DISTRIBUTORY OF TAWA PROJECT IN DISTT HARDA
On Turn Key Basis Construction of Tulsipar tank scheme (without canal) including sluice, waste weir, spill bridge and road, as per detailed scope of work but not limited to that.
Construction of Rewa Branch Canal from R.D. 33.00 km. to R.D. 39.325 Km including its complete distribution system up-to 40 Hact. Chak of Bargi Diversion Project On TURNKEY Basis
Providing, Fixing and Commissioning of DG Set and Providing of Operating Staff for DG Set and Gate Operation at RD 12.393 km at OSP Main Canal Omkareshwar Distt. Khandwa M.P.
Repair and Servicing of C.R. Gate (Size 5m x 5.5m x 3 Nos) of I.S.P. Canal RD 58.4 KM District Khargone including material, labour charges and testing etc. complete work.
Construction of Covered Drain from Chandelal Gouraiya House to ahead of Tarachand Paade House and Mehtar Lal Hanote to Branch Canal in Ward No. 14, Nagar Parishad Lanji - 3rd Call
REPAIR WORKS OF CANAL SLUICE HR CR GATE OF FROM CHAIN NO 1800 TO 2110 OF DHOOTY LBC OF SUB DIVISION NO 06 DHOOTY LBC BALAGHAT FOR YEAR 2023 24
Special repair work of Gawlan Tank of main canal lining work at R D 3250 to 3350 M and earthwork of tail minor at R D 350 to 500 M
Servicing, Repair and Reconditioning of 2 x Head Regulator gate located at RD 27790 m village Padiyal and RD 28775 m village Dugawa of LBC Main Canal under Jobat Project.
Repair and Reconditioning work of Head Regulator gate (500 mm x 500 mm) at RD 10270 m located at village Haldi of LBC Main Canal Jobat project Alirajpur District (M.P)
Earth work on dam and canal repairing work of Piliyakhal tank tehsil Nalkheda Distt. Agar under jurisdiction of W.R. Sub Division, Susner Distt. Agar Malwa of Water Resources Division, Shajapur.