Loading…
Loading…
3,572 results • Best match
Construction of RTWHS, Recharge Shaft, Pakka Check Dam, Anicut at P.S. Mandal
PAKKA CHECK DAM KHANPURIYA PIV KOT LAD KH DLT WHS PCD 000556944
Construction of Anicut, Pakka Check Dam, WHS, Anicut Renovation at P.S. Bijoliya
Construction of Earthen Check Dam in Dhamana Jalgrahan Upsamaiti of IWMP -28
Construction of Pasture development, Anicut, Pakka Check Dam work at P.S. Kareda
Construction of Earthen Check Dam and Field Bund PS Deeg MJSA 2.3
Construction of Pakka Check Dam and Talab Waste Weir in P.S. Chhabra
PAKKA CHECK DAM GIRDHARPURA PIV KOT ITA GI DLT WHS PCD 000569778
Parwan Lift Irrigation Scheme ki LMC ki Minor ki LMC Minor No. 6 ki RD 0 to 2000 tak service road par quarry rubbish ka karay
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part-II sub-project, District Hanumangarh
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part-I sub-project, District Hanumangarh
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part-II sub project, District Hanumangarh
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part I sub-project, District Hanumangarh
4_Providing and Installation Solar Water Pump System, Drip Irrigation System and Borwell mining in Pasture Development Work Shiv Mandir Bhagwanpura, G.P. Sanita under Chittorgarh PMKSY 2.O WDC-3 Project Block Bhainsrodgarh District Chittorgarh
Development of garden area attached to ZSI office building at Jodhpur Raj during 2024 25 SH Landscape & Plantation Maintenance work SH Pruning of trees Clearing of grass Display of potted plants Drip irrigation etc
Hire an Agency as Service Provider for Online Data Entry and Validation work of 6th Minor Irrigation Census and 1st Water Bodies Census 2017-18
CLEANING OF SADUL MINOR CANAL VARIOUS OHT, UG SUMPS, RAW WATER TANKS AND REPAIR / REPLACEMENT OF DISTRIBUTION PIPE LINE AT LGJ MIL STN
Pakka Work - Pakka Check Dam, Recharge Shaft, Check Dam repair or Anicut Renovation, Field Outlet and Anicut Cum Causeway, GP- Bordiya, Badi Sakthali, unthel, Ninor, Bansai, Dalot Block - Dalot WDC-4
Construction of Pucca Water Course in Command Area of Arthuna Distributary RD 2.5 to 20 km GKG Distributary and its Systems of Mahi Major Irrigation Project Banswara
Repair and Renovation of RMCRD 48.00 Km to 51.16 Km canal and its other canal distribution system of Bisalpur Major Irrigation Project District Tonk
Construction of Pakka Check Dam (RGJSY Phase-l) at PS Manoharthana Distt. Jhalawar
Construction of Pakka check dam Renovation and Talab Renovation IWMP-12 P.S. Atru
construction of puckka check dam Work Under PMKSY Scheme Block Chouth ka barwara
Construction of Earthan Check Dam under RGJSY-I Scheme (state Fund) PS. Hindoli
Construction of Pakka Check Dam (RGJSY Phase-l) at PS Aklera Distt. Jhalawar
Construction of Pakka Check Dam (RGJSY Phase-l) at PS Manoharthana Distt. Jhalawar
Construction of Field Bunding (FB), Earthan Check Dam (ECD) and Periferal Bund (PB)
Construction of Pakka Check dam, Farm Pond, Sunkan Pond, CCT at P.S. Banera
CONSTRUCTION OF PAKKA CHECK DAM GP PATIYA, DADIYA PS GOGUNDA IN PMKSY 2.0
CONSTRUCTION OF ANICUT / PAKKA CHECK DAM GP MADA GOGUNDA, UDAIPUR DISTRICT MJSA 2.3
Planning, Investigation, Design, Drawing and Construction of Battisa Nallah Solar Micro Irrigation Project, Tehsil-Deldar, District-Sirohi, Rajasthan on Engineering, Procurement and Construction Basis (Single Responsibility Turn-Key Project) includin
Supply and Installation of Automated Polyhouse 1008 Square meter along with micro irrigation sustem and other required facilities for running of these facilities at Centre of Excellence Flower, Sawai Madhopur
Supply and installation of Automated Polyhouse 1008 Square meter along with micro irrigation system and other required facilities for running of these facilities at Centre of Excellence Flower Sawai Madhopur
Construction of MPT Nadi Pucca Check Dam etc under RGJSY 1 at village Babaichya hasiyawas aradka baghpura narwar bhawanikheda chachiyawas PS srinagar
1. Construction of Earthen Check dam in Gram Panchayat Badawali of (RGJSY)SEMARI Block
Repair, Restoration of Canal and Diggie System of Bhadrai Lift Distributary System, Panoriya Lift Distributary System and Manki Distributary System of Narmada Canal Project
Construction of Anicut and Pucca Check dam Gabion Structure WHS Renovation Works under MJSA Phase ll at various sites
Pakka Work - Recharge Shaft, Pakka Check Dam, Anicut Renovation, Amrit Sarovar, Earthen Check Dam, Anicut Cum Causeway, Talab Renovation, WHS and Renovation or Restoration of Talab and WHS Block - Pratapgarh, Dhamotar WDC-5
Construction of Recharge Shaft , Percolation Tank and Earthen Check Dam PS Bhusawar Under MJSA 2-2
Rehabilitation of Modia Distributary from RD 0.00 to 25.00 km of Bhakhra Canal System District Hanumangarh
Construction of Pakka Check Dam, MPT, CCT, SGT and Sunken Pond in P.S. Chhabra
Construction of ardhan band, ardhan check dam, peripheral band gp akoli-village akoli, devara
Construction of Pakka Check Dam WHS under RGJSY-I Scheme (State Fund) P.S. Hindoli
SUB SURFACE VARRIER AND PUCCKA CHECK DAM BLOCK CHOUTH KA BARWARA RGJSY- PHASE IST
Construction of MPT , Pacca Check Dam , in MJSA 2.0 Phase-II PS K. Patan
PAKKA CHECK DAM PIV KOT ITA GI DLT WHS PCD 000569778 (WORK PLACE- GIRDHARPURA)
Construction Of Pacca Check Dam, Sunkan Pond and Recharge shaft in RGJSY P.S. Mundawar.
PAKKA CHECK DAM PIV KOT LAD KH DLT WHS PCD 000556943 (WORK PLACE- KHANPURIYA)
Pakka check dam FP FB with stone pitching RGJSY 1st Phase BLOCK SAWAI MADHOPUR
Gena Ram Lohar ke Khet ke pass Jal Grahan Hetu Check Dam Nirman work