Loading…
Loading…
1,230 results • Best match
Rehabilitation of canal outlets at LS 3.044 KM, LS 3.710 KM, LS 6.600 KM, LS 18.900 KM and LS 21.900 KM and Construction of canal outlet at LS 35.900 KM of Left Bank Main Canal offtaking from Amaravathy River at LS 181.440 KM in Aravakuruchi
Z.O.XIV.C.NO.E1/4792/2025 ENGAGING OF POCLINE MACHINE FOR REMOVAL OF HYACINTH AND SILT FROM THE EXISTING CANALS AT VEERANKAL ODAI (NEAR KAIVELI BUS STOP) IN DIV - 188, U - 42, Z - 14
Z.O.XIV.C.NO.E1/4263/2026 Engaging of Poclain machine for removal of hyacinth and silt from the existing canals at Veerankal Odai (Near Kaiveli Bus Stop) in Division - 188, Unit - 42, Zone - 14
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 6 inch Polyethylene
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 4 inch Polyethylene
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 3 inch Polyethylene
Improvement works to Ambattur Sidco Canal from AIEMA to Dr.Ambedkar Nagar and Padikuppam Canal from Jeevan Beema Nagar to Padikuppam Burial Ground in Dn-89, 90,91,92,93, Zone-7
Providing Compound wall, Additional ground level seating gallery, Sthapathy works, Museum, Canal, Canal Cleaning work, Internal and Externals lightings to Jallikattu arena at Keelakarai village in Madurai District
Construction of Check dam near forest bungalow at Mathi maduvu odai SF No.146/1 in R.Pudupatti Town Panchayat
Annual Maintenance of System Tanks Under Irrigation Section ,Veerambakkam for the year 2026-2027.
LANDSCAPING HORTICULTURE WORKS INCLUDING RELATED CIVIL, ELECTRICAL, IRRIGATION AND ASSOCIATED WORKS AT POONAMALLEE DEPOT
Z.O.XIV.C.NO.E1/2199-1/2025 ENGAGING OF POCLINE MACHINE FOR REMOVAL OF HYACINTH AND SILT FROM THE EXISTING CANALS AT VEERANKAL ODAI (NEAR KAIVELI BUS STOP) IN DIV - 188, U - 42, Z - 14
Construction of storm water canal in green belt site of CPCL at Amullaivoyal Area
Comprehensive Restoration and Rejuvenation of Buckingham Canal Drains of Otteri Nullah Canal from LS 450m to 10840 m in Aminjikarai, Ayanavaram, Egmore, Perambur and Purasaivakkam Taluks of Chennai District
Lining canal 3 nos in Reddiyarchatram block of Dindigul District TN05-93
Construct of Bathing Ghat at Buckingham canal Ponnanthittu in Killai Town Panchayat
Lining canal - 2 nos in Reddiyarchatram block of Dindigul District TN05-98
Lining Canal 2 nos in Reddiyarchatram block of Dindigul District TN05-92
Improvement of North Kodungaiyur Canal in Div - 34 and 35, Zone IV
Improvement of Captain Cotton Canal in Div - 36 and 37, Zone IV
Special Repairs to Parambikulam Main Canal from L.S.118.550 Km to 118.660Km
Formation of Approach Road From Peruvala canal to temple car parking and 0 - 300 m (on Both Banks) Retaining wall in Peruvala Canal at Arulmigu Mariamman Temple, Samayapuram, Trichy District
GLYCINE IRRIGATION SOLUTION 1.5% - 3000 ML. UNIT:LIT] / GLYCERINE PURE FOR LOCAL APPLICATION-450GM BOTTLE. UNIT:GRAM]
Annual Maintanence of Tanks, Channels in Irrigation Section, Thirukalukundaram in Thirukazhukundram Taluk of Chengalpattu District
Maintaining the WRD tanks and anicuts in Irrigation Section, Sendurai for the year 2026 - 2027.
Maintaining the Non System Tanks, Channels and SG Arrangements in Irrigation section Thiruvennainallur for the year 2026-2027
Construction of regulating structure across Therkku Odai to Supply Chennampatti Right Main Canal at LS.1120m and Rehabilitation to Chennampatti Right Main Canal in Kariapatti Taluk of Virudhunagar District.
Rectification of pump house sheds (12 Nos) in Plantation Irrigation blocks at TNPL Unit-II, Trichy.
Rehabilitation of Right Bank Main Canal
Rehabilitation of Left Bank Main Canal
Construction of RCC slab culvert across PAP canal at Valayapalayam H/O Poomalur
Removal of vegetation and accumulated silt in the PWD CANAL at vallur camp
Removal of vegetation and accumulated silt in the PWD CANAL at Vallur camp.
Forming Temporary Canal from CWPH 1 to outfall near Compound Wall at TTPS
Improvement of Kodungaiyur Main Canal in Div - 35, 37 and 41, Zone IV
Removal of vegetation and accumulated silt in the PWD CANAL at vallur camp
Laying CC Road at CANAL ROAD in Div-109, Unit-24, Zone-9.
DESILTING OF TVS CANAL IN DIVISION-94 AND 95 UNIT-21, ZONE-8
DESILTING OF TVS CANAL IN DIVISION-94 and 95 UNIT-21, ZONE-8
Rehabilitation of Canal shutters in Gunderipallam Reservoir of Gobi Taluk in Erode District
Upgradation of Kandiyankovil to Muthiyanerichal (via) PAP Canal Km 0/0 - 2/120
Proposed Repair and improvement work in sidco canal in Div-168, Zone-13.
Special Repairs to Krishnagiri Dam RMC Extension Canal in Krishnagiri Taluk and District.
Hiring of 8 nos of 5-Ton Tipper Vehicles in Zone VI to X Lorry Station for removal of debris, other unwanted materials on streets, hyacinth at canals for a period of 100 days
Special Repairs to Spillway Shutters and Sluice Shutter of Right Flank Canal along with Hoisting arrangements of Left and Right Flank Canal Sluice Shutters of Uppar Dam in DharapuramTaluk of Tiruppur District
Unbranded Shade Net House Flat Shape WITHOUT, Unbranded Shade Net House Flat Shape WITHOUT FOGGING / IRRIGATION
Providing Better Irrigation facilities to Sevur and Maduravalli Village Ayacut in Tittagudi Taluk of Cuddalore District
Annual maintenance of Tanks, Channels pertainting to Irrigation Section, Thiruporur in Thiruporur Taluk of Chengalpattu District
Annual Maintenance of Tanks, Channels pertaining to Irrigation Section, Cheyyur in Cheyyur Taluk of Chengalpattu District.
Annual maintenance of Tanks, Channels pertaining to Irrigation section, Madurantakam in Madurantakam taluk of Chengalpattu District