Loading…
Loading…
5,019 results • Best match
AMRUT-AMRUT2.0-Urban JJM Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.- Providing cement concrete and laying interlock in chundavila ward-
Providing FHTCs , Extending Pipe lines in WSS and Laying pipelines in Kuttiyadi Grama Panchayath in Kozhikode District
Clear Water Pumping main from proposed sump to Desamangalam master Tank and CWGM from Desamangalam master tank to Velur, varavoor, Kadanassery,KadangodeErumapetty,Choondal,Mullakkkara and Elavally Tanks-General Civil Work
Deposit Work-SCDO Nedumangadu Block PanchayathProviding pipe line extensions and alteration of existing water connections and Providing FHTC s for the SC households in Ambedkar Gramam Colony in Panavoor Grama Panchayath.
JJM 2021_22_Supply and errection and commissioning of centrifugal pump _Centrifugal pump for Centrifugal induction motor having Discharge_82 LPS_Head 102 mtr_Speed 1485 Rpm for pumping station A Thrithala_General Electrical Work
AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-KOVOOR ZONE-Extension and Replacement of Distribution pipeline and providing FHTC in corporation roads wards 19 - Medical college south ,Ward 20 Medical college Ward 29 - Pottammel
JalJeevan mission 2020-21 PoovarPanchayat -Phase 2 Reach 3 - Replacement of oldage 125mm AC pipe at Beach road at Poovar and relaying with 140mm PVC pipe and providing 400 nos FHTC connections
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 46 nos. Forced convection type Hot Air Oven for various Quality Control laboratories of Kerala Water Authority
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 82 nos Conductivity TDS Temperature Bench top Meter for various Quality Control laboratories of Kerala Water Authority
DEPOSIT Programme Implimentation Unit Thiruvananthapuram Jilla Panchayath Alteration of existing water connections to the newly laid pipe line under JJM project by Project divsion Thiruvananthapuram at Vasudevapuram Pallikshethram - Palliyara road
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 77 nos Hot air oven natural convection type for various Quality Control laboratories of Kerala Water Authority
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 85 nos 0.1 mg Electronic analytical weighing balance for various Quality Control laboratories of Kerala Water Authority
Providing FHTCs by retrofitting,extending existing JICA water supply scheme in Olavanna Grama Panchayath in Kozhikode District- Package II
Providing FHTCs by retrofittring, extending JICA Water supply scheme in Olavanna Grama Panchayath in Kozhikode District- Package I
Supply and erection of motor pumpset
AMRUT 2 PIRAVOM MUNCIPALITY Providing FHTC to House holds of piravom muncipality PART 2 BALANCE WORK and Laying of 250mm DI pipe from Kakkad KWA plant compound to Kakkad jn Pipeline WorkPipeline Work
JJM 2020 21 Setting up Up gradation Operation of Laboratories for WQMS Procurement of 17 nos Conductivity TDS Temperature bench top Meter for various Quality Control Laboratories of Kerala Water Authority
JJM 2022 2024 Phase 3 CWSS to Panvoor Pullampara Vembayam Pangodu and Kallara PanchayathSupply Erection Testing and Commissioning of Clear Water Pump Set and Raw water pump set out door transformer
Jeevan Mission (JJM)-Jal - CWSS to Kallikkadu - Water supply line extension Providing water connections from existing and proposed pipelines to households of Kallikadu Grama Panchayath. (Phase-2)-Replacing old Damaged 300mm
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 82 nos Micro Processor based bench top pH Meter for various Quality Control laboratories of Kerala Water Authority
Providing FHTCs by retrofitting, extending existing JICA water supply scheme in Olavanna Grama Panchayath in Kozhikode District- Package III
Providing FHTCs by retrofitting, extending existing JICA water supply scheme in Olavanna Grama Panchayath in Kozhikode District- Package IV
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward No.38,39,40,41,42,43,44
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and providing various places FHTCs in Neyyattinkara Municipality .-Pipeline Work
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward No.25,26,27,28,29.30
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward No. 7,8,9,10,11,12-
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and various places FHTCS in Neyyattinkara Munucipality Balace part II
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward no. 13,14,15,16.17,18
Granular filling of 30 cm thick GSB and WMM each 15 cm thick and DBM hard shoulder
JJM-CWSS to IDUKKI KANJIKKUZHY VAZHATHOPE MARIYAPURAM KAMAKSHI VATHIKUDY AND VANNAPPUARAM PART PANCHAYATHS IN IDUKKI DISTRICT SYPPLY AND LAYING CWGM AND CONSTRUCTION OF STEEL TANK AT VANNAPPUARAM PANCHAYATH PACKAGE 7 GENERAL CIVIL WORK
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward No. 31,32,33,34,35 ,36
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 7 nos Micro Processor based bench top touch screen pH Meter for various Quality Control laboratories of Kerala Water Authority
JJM 2021-22 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 6 nos Fume hood and erection of motor and duct pipes for various Quality Control laboratories of Kerala Water Authority
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.-Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward no.19, 20,21,22,23,24
JALJEEVAN MISSION (JJM)-COMPREHENSIVE WATER SUPPLY SCHEME TO WANDOOR,TUVVUR,KALIKAVU, KARUVARAKUNDU AND EDAPPATTA PANCHAYATHS INMALAPPURAM DISTRICT-PACKAGE II - 1) CONSTRUCTION OF 34MLD WTP AT AMBALAPPADI 2)CONSTRUCTION OF CLEAR WATER SUMP, PUMP HOUS
Suppling laying street main extension using PVC GI pipes and Providing FHTCs at Kadampazhipuram, Sreekrishnapuram, Vellinezhi and Pookottukavu Grama Panchayaths in Palakkad District
providing FHTCs supllying and laying Distribution lines and Road restoration etc
Supplying and laying Pumping mains Distribution lines construction of pump house and GLSR Supply and erection of pumpsets and Road restoration
earth work excavation, Loosening , Recompacting, GSB, WMM ,Prime coat , BM and BC with traffic safety arragements, construction of drains with covering slab, irish drain
earthwork excavation filling with GSB WMM PCC 1 3 6 M20 etc
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality - Supply ,erection, trial run, testing and commissioning of vertical turban pump set at Raw Water pump
JJM 20232024 Kottukaal Grama Panchayath Design and Construction of 6.00 LL capacity of OHSR 2.5 LL Sump pump house Design supply erection commission of CF Pump transformer Power allocationand electrification of pump house at Punnaku
Restoration work
Earth work GSB WMM BM BC
AMRUT-AMRUT2.0-Urban JJM-Neyyattinkara Municipality- Replacement of AC pipes, Pipe line extension and Providing FHTCs in Neyyattinkara Municipality.- Pipe line extension and Providing FHTCs in Neyyattinkara Municipality in ward No. 1, 2, 3, 4, 5,6
JJM 2022 24 CWSS to Peringamala Grama Panchayath in Thiruvananthapuram district Supplying Laying testing and Commissioning of 150mm DIK9 for 17.4 km Clear Water Pumping main from Sump at Ayiravallykunu WTP to proposed GLSR at Madathara
KWA has deposited the Restoration amount Rs1658197vide chalan dt 120123 240423 JJM project corresponding to ROW application 104723753788 105248169412 for Avoli bypass roadThe estimate is proposed for Old PM road ch 146500 Avoli bypass This portion
STATE PLAN-2021-2022- Mace.of RWSS to Peringammala- Laying of 90mm PVC distribution line from Arippa to Pottamavu ST colony and providing 300 Litre individual PVC water tank for providing FHTC at Pottamavu ST colony in Peringammala Grama panchayth.