Loading…
Loading…
6,759 results • Best match
Please Refer ANNEXURE B in Tender Document
1. Bill of Arm making it in original shape and size after taken out of ball from arm by gas cutter and developing of outer surface by welding and the making outer shape smooth by grinding and cracked portion welding by steel electrode.
1. Dismantling of complete hyd. lift cylinder assly. after cleaning out side. 2. Gland portion of cylinder threading. 3. Eye cutting welding and machining. 4. Piston welding, machining, polishing.
Please Refer ANNEXURE B in Tender Document
1. Track roller mounting worn out portion developing grinding and rethreading up to required aize. 2. Broken bolt of track frame roller taken out track frame and rethreading. 3. Track frame trunnion worn out portion developing and making it
1.Damage blade arm broken plate cutting inside lower upper size 12X4. 2.New plate cutting setting and welding inside lower and upper plate. 3.Pin hole oval worn out portion welding buildup as per size. 4.Arm end collar gousing and welding by st
1. Stay cylinder broken portion gousing. 2. Stay cylinder alignment and welding by steel electrode. 3. Ribs cutting and welding.
Please Refer ANNEXURE B in Tender Document
1.Front damage plate cutting size-4ft x12inch. 2. New plate welding in place of damage plate by steel and low Hyd, Electrode. 3. Front ribs now plate bending, shaping and welding size -6 inch x 5inch.
1- Both of Water tank opening, cleaning repairing of Radiator 2- All Tubes of Radiator cleaning by gagging with Hcl Acid, K. Oil 3- New Steam joint changing.
1.Dismantling of 01 no hydraulic tilt cylinder assembly after cleaning from outside. 2.Piston rod straightening and polishing. 3.Piston welding, machining and polishing. 4.Piston rod original shape threading. 5.Tilt cylinder fitting and hydrauli
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
1. Front damage Plate Cutting Size 4 feet x 12 inch. 2. New Plate Welding in place of damage Plate by steel AND Low Hyd. 3. Electrode. Front ribs now plate bending shaping and Welding size 6 inch x 5 feet.
1. Broken mounting bolt of track roller assly. taken out. 2. Rethreading of female of roller mounting. 3. Guide holder of idler assly developing upto required shape and size. 4. Trunion of track frame developing and making it required
1. Dismantling of complete hyd. lift cylinder assly, after cleaning out side. 2. Gland portion of cylinder threading. 3. Eye cutting welding and machining.
1. Broken mounting bolt of track roller assly taken out. 2. Rethreading of female of roller mounting it. 3. Guide holder of idler assly developing up to required shape and size.
1. Track frame cracked portion gousing. 2. Track frame welding by steel electrode. 3. Ribs cutting and welding by steel electrode. 4. Track frame diagonal broken portion gousing. 5. Track frame diagonal welding by steel electrode.
Please Refer ANNEXURE B in Tender Document
1.-Old sprocket bolts cutting. 2. Sprocket holes 54 nos oval portion rebuilding.
1. Cracked portion of chasis gousing. 2. Cracked portion chassis welding by steel electrode. 3. New plate cutting from grounded machine. 4. Plate welding by steel electrode. 5. Radiator mounting welding. 6. Cracked portion welding of K arm.
1. Front damage plate cutting size- 4x 12 2. New plate welding in place of damaged plate by steel and low Hyd. Electrode. 3. Front ribs now plate bending, shaping and welding size- 6 x 5
1. Stay cylinder broken portion gouging. 2. Stay cylinder alignment and welding by steel electrode. 3. Ribs cutting and welding.
1. Old sprocket bolts cutting. 2. Sprocket holes 54 nos oval portion rebuilding. 3. Holes 54 nos rebuilding portion grinding as per bolt size.
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
1.Damage blade arm broken plate cutting inside lower and upper size 12X4. 2.New plate cutting setting and welding inside lower and upper plate. 3.Pin hole oval worn out portion welding buildup as per size. 4.Arm end collar gousing and welding by
1.Ball of arm making it in original shape and size after taken out the ball from arm by gas cutter and developing of outer surface by welding. 2.Making outer surface smooth by grinding. 3.Cracked portion welding by steel electrode. 4.Other end
1. Stay cylinder broken portion gouging. 2. Stay cylinder alignment and welding by steel electrode. 3. Ribs cutting and welding. 4. Eye frame worn out portion straightening by hyd. jack.
Please Refer ANNEXURE B in Tender Document
1. Ball of arm making it in original shape and size after taken out of ball from arm by gas cutter and developing of outer surface by welding and the making outer shape smooth by grinding and cracked portion welding by steel electrode.
1. Dismantling of complete hyd. lift cylinder assly. after cleaning out side. 2. Gland portion of cylinder threading. 3. Eye cutting welding and machining.
Please Refer ANNEXURE B in Tender Document
1.Old sprocket bolts cutting. 2. Sprocket holes 54 nos oval portion rebuilding. 3. Holes 54 nos rebuilding portion grinding as per bolt size.
1. Old sprocket bolts cutting. 2. Sprocket holes 54 nos oval portion rebuilding. 3. Holes 54 nos rebuilding portion grinding as per bolt size. 4. Fitment of bolts and nuts.
1- Both of Water tank opening, cleaning repairing of Radiator 2- All Tubes of Radiator cleaning by gagging with Hcl Acid, K. Oil 3- New Steam joint changing.
New plate cutting setting and welding in side lower and upper plate.
Repairing of Radiator Assy, Hyd Cooler Assy and steering cylinder of the machine RT 880 Crane of ABOCP of Block-II Area
Repairing of 02 (Two) Nos of Horizontal out rigger cylinder assemblies of RT630 Crane SL.No.406769 of Kuya OCP, Bastacolla Area IX.
Repairing of of worn-out Tunion , bracket and cap assly of both side blade arm (LHS and RHS) of Dozer SL.No.11834 of Kuya OCP, Bastacolla Area IX
SELF STARTER REPAIRNG OF BEML DOZER SL NO 13256, SHOVEL BEML BE300 SL NO 16121, BEML BH35-2 DUMPER SL NO 35226 AND SHOVEL TATA EX350 SL 2518
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
1. Dismantling of complete hyd. Winch motor assly after cleaning outside agency. 2. Repairing of housing welding machining grinding honing polishing facing. 3. Hyd. Winch motor assly. testing and full fitting etc.
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Front Both Side Wheel Hub Complete Dismantling and bearing greesing, Fitting. 2 Nos.
Please Refer ANNEXURE B in Tender Document
1. Damage blade arm broken plate cutting inside lower and upper size 2. New plate cutting setting and welding inside lower and upper plate. 3. Pin hole oval worn out portion welding built up as per size. 4. Arm end collar gousing and
1. Broken mounting bolt of track roller assly. taken out. 2. Rethreading of female of roller mounting it. 3. Guide holder of idler assly. developing up to required shape and size.