Loading…
Loading…
2,940 results • Best match
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Triangular Partition, Vinyl Printing, LED Light, Focus Light, Maint of Existing Wooden Base, Backligh Print
Ward 38 Me LED light 120 Watt and Octagonal pol 9 miter lagaye jane babat.
Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3), Power Contactor 3 pole 110 Amp, Solar Street Light 18 by 20 watt Lumen LED output 120 Lumen per Watt, Solar Street Light24 by 25 watt Lumen LED output 120 Lumen per Watt, Solar Street Light 30 watt Lumen LED output 120 Lumen per Watt, Timer Switch Light Sensor Type Nature Switches Single Phase 5KW 32AMP MCB, Timer Switch Light Sensor Type Nature Switches Three Phase 12KW 32AMP, LED Tubelight 18 Watt, LED Tubelight 20 Watt
Power Saving Chowk 48W, Power Saving Rod 48W, LED Bulb 9W, Cable 10mm 3core Aluminum, Cable 16mm 3core Aluminum, Cable 16mm 3core Copper, 100w Bulb Holder, 10mm wire copper
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Experience Criteria, Certificate (Requested in ... category LED Luminaire for ...
LED Luminaire for High Bay Lighting (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6775613 Dated : 10-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Patient Bed Semi Flower, Patient Care Mattresses, Led Tube Light 40 watt, 2000 Watt Fan Heater, Blood Pressue monitor
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience ... category LED Luminaire for ...
LED STREET LIGHT 60 WATT, SODIUM BULB 250 WATT, SODIUM CHOWK 250 WATT, SODIUM LIGHT CONDENSER, T-5 CHOWK, T-5 TUBE ROD, T-5 HOLDER, LED BULB 18 WATT
MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2), Self Ballasted LED Lamps for General Lighting Service as per IS 16102 (Q2), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) ... (Q2), LED Batten (Q2), ... (Q3), LED Luminaire (for ... (Q3), LED Luminaire (for ...
MOEI & Fans, Street Light,Compound Light, Lift, Pump, DG Set and Sub Station etc. of Non-Residential Building of CGO, Income Tax Office, New CIA Building, Central Excise Manik Bagh, Malwa House, B-2 Bunglow, Inspection Bunglow, Guest House, Holiday ... miniature LED lighting for ...
E Tender for Diffrent type of work communication board chainling fencing LED light 2026 Second Call
LED Luminaire (For Road and Street Lights) LED Luminaire (For Road And Street Lights) ( 5990 ) Technical Specifications Specification Specification Name Values Allowed Values STANDARDS LED Luminaire conformity to IS:10322/Part 5/Section 3/2012 latest ... of LED Luminaire as ... each LED luminaire unit ... - LED Luminaire for ...
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2), Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3), Cable Joint Kit (V2) (Q3), LED Batten (Q2) (3 (3 ))
TCCA, LED BATTEN, LED BULKHEAD, ALGAE, MCCB, LED STREET LIGHT FITTING, CABLE, FLUSHING CISTERN, BIB COCK, GLASS SHELF, PTMT ANGLE STOP COCK, PVC WASTE PIPE, PLY WOOD, RUBBER, CONCELED SPINDLE, DOOR BOLT, SPINDLE, STOP COCK
PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Rigid Conductor (V2) ISI Marked To IS 694 (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire...
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, ... category LED Luminaire for ...
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience ... category LED Luminaire for ...
RADIUM TAPE 2 INCH, PACKING WIRE, PAPER SHREDDER MACHINE, RED FLAG 4 X 3, BULB HOLDER, ALUMINIUM SHED, FLEXIBLE WIRE 2.5 MM, LED BULB 0.5 WATT, REDIUM STICKER 9 X 9
LED Luminaire for High Bay Lighting (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7053894 Dated : 29-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO AGAR MALWA, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Chief Municipal Officer) 2/7
LED Luminaire for High Bay Lighting (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7093907 Dated : 09-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 11000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO Municipal Corporation Jeerapur, Urban Development and Environment Department, Urban Administration and Devlopment, (Chief Municipal Officer) 2/7
Indore Municipal Corporation intends to conversion of existing 25 Highmast lights with energy efficient LED Lighting fitting in different ward of indore city.
AS PER ATTACHED TENDER DOCUMENTS
as per tender documents
AS PER TENDER DOCUMENTS
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Experience Criteria, Certificate ... category LED Luminaire for ...
Ward 33 MS road se cheelghar tak prakash vyavstha hetu octogonal pol and LED light lagwane babat.
Dustbin, bamboo broom with bamboo strips, soft broom khajoor brooms, pvc tagari, seek brooms, phool brooms, cloth dustertowel, sharpex heavy duty hedge shear, led torch, led bulb 9 walt, wire roll bundle, led lamp 18 walt, 100w waterproof led flood light...
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller OEM Authorization ... category LED Luminaire for ...
LED High Bay Light -70-90 watt, LED Flood Light -70-90 watt, PVC Casing Capping 25 mm, PVC Casing Capping 20 mm, 1 point 5 Sq mm Single core Multi strand Copper Wire FRLSH, 2 point 5 Sq mm Single core Multi strand Copper Wire FRLSH
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/7057895 Dated : 31-12-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)