Loading…
Loading…
110 live60 closing this weekmost from APGENCO and South Coast Railway
110 results • Best match
Set of spares suitable for TRC 1000MN/UG Compressor of M/s. ELGI make. Set consisting of 03 items
Supply of Guide Rollers required for conveyors
ENQUIRY FOR DESIGN, MANUFACTURING SUPPLY AND COMMISSIONING OF 12 TON SG UNDERSLUNG CRANE OF SPAN - 9.6 MTRS AND SUPPLY OF DSL BUS BAR (100A GI) ALONG WITH CURRENT COLLECTOR (1SET) FOR 36MTRS LENGTH AT AIR COMPRESSOR HOUSE/STAGE-1
Hose Coupling for Main Compressor Delivery as per ELS/LGD Drawing No.C/ELS/LGD/Pn.Eqpt./3/32. (As per UVAM ID: 2100905 ).
Different types of Mechanical Works in MM-I(Conveyors), MM-II & MM-IV Sub -Divisions /CHP-I&II/Dr.NTTPS, as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
SUPPLY OF SPARES FOR 1.1 RPM PBL GEAR BOX FOR CERM OF ESP S OF UNIT-3/SDSTPS
Replacement of boiler roof Sheeting in Unit -1 Boiler
Providing labor assistance for upkeeping of conveyors & Stackers/Reclaimers in M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the period from 01-10-2026 (or) from the date of commencement of work to 31.03.2027
Comprehensive Annual Maintenance Contract (CAMC) for BG CNC Surface Wheel Lathe Machine No. SWL-162, Model No.YSL-012 of SSE/C&W/RMUY/VSPS of Visakhapatnam division for five (05) years, (OEM: M/s HYT Engg. Co. Pvt. Ltd., PUNE).
Different types of mechanical maintenance works in Crusher house at MM-III sub division of CHP-III/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Supply of Erosion Protection Shields for Pressure Parts of Units 7 Boilers
Custom Bid for Services - HIRING OF ARBORICULTURE SERVICES INCLUDING MACHINERY AT INS SATAVAHANA FOR A PERIOD OF 02 YEARS Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
12 mm Additional safety sling for Compressor to loco body on Soft Mount side of WAP7/WAG9 locomotive as per ELS/Tata Drg. No. RS/TATA/MISC./35/18
Transportation of coal from Junction towers (JT2 to JT9) along with merged locations of JT2A, JT2B, Surroundings of new crusher house, JT5A and along the 4C,6C conveyors to Uncrushed coal yard or stacker yard in MMSD-II of CHP/RTPP for the period from date of issue of LOI to 31.03.2027
Procurement of Spares for Screens-5&6 available in crusher House
SUPPLY OF VARIOUS TYPES OF LOCTITE SEALANTS FOR HP - 1203 MILLS FOR UNIT IANDII BOILERS
Custom Bid for Services - Contract for engaging a Third- Party Inspection Agency for Inspection of Dished Ends and Boiler Components at Vendor Works for Various HPVP Projects Similar Category Hiring of Third-Party Inspection Agency
SBV HEAD ASSY AND IT'S SPARES AND DA HEAD VALVE ASSY FOR SOOT BLOWERS OF BOILERS
Charges for Unloading of Coal from BOBR wagons at BOBR track hoppers (via 6A and 6B conveyors) and Lifting & transporting of accumulated / spilled coal along the BOBR track line at CHP/ Dr.NTTPS as and when required during the period 01-10-2026 or from the date of commencement of work to 31-03-2027
SUPPLY OF MSH RINGS AND AIR RESTRICTION RINGS FOR HP-1203 BOWLS MILLS OF UNIT-IANDII BOILERS
Transportation of coal from WTs to JT2, in the galleries of 1A,1B,2A,2B, the Pent House to JT2 underneath the conveyors 3A/3B, UC-1 & RC-1 galleries and Surroundings of JT2 to Un crushed coal yard in Conveyor section of MMSD-1 of CHP/Dr.MVR RTPP for the period from the date of LOI to 31.03.2027.
PROCUREMENT OF PRESSURE RELIEF VALVES FOR LUB OIL SYSTEM OF PA FD AND ID FANS OF UNIT-IANDII BOILERS
Different types of mechanical maintenance works as and when required on Conveyor section MM-II sub division of CHP-III&IV/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Supply, Laser Alignment of Kirloskar Pneumatic KCZX4 direct drive compressor for R22 Refrigerant (equivalent to Kirloskar make AC-870 Compressor) along with accessories and Supervision during erection/commissioning of Compressor at GGPP, Jegurupadu.
SUPPLY OF V BELTS FOR THE COMPRESSORS OF MILL REJECTS SYSTEM UNIT-1AND2 FOR THE YEAR 2026-27
Break down works of Units-I & II Boilers Pressure parts as and when required for the period from 01.10.2026 to 31.03.2027.
Supply of Boiler roof skin casing sheet 3.15mm thick for stage 5
Fabrication of Boiler tube bends (OD 38.1x5.59 SA 213 T12 & OD 50.8x7.11 SA 213 T12) required for Unit-3 Boiler on supply of free straight tubes during the year of 2026-27
GALVANISED MS PLATFORM GRATINGS FOR ID FANS HOIST WALK WAY AND GI GRATINGS FOR BOILER FLOORS
Dismantling and shifting of screw conveyor inside the mill, re erection including tie rods, screw conveyor bearing housing and stuffing box, replacement of eroded feed pipe, mixing box and transition piece with new spares, replacement of screw ... screw conveyor removable ...
Main compressor assembly for electric locos, 1000 liters per minute capacity with driving motor 14 HP, 10.4 Kw rating, speed 1000 RPM, working pressure 10.5 kg/ Sq.cm, free air delivery 1000 LPM with H class Insulation as per CLW spec, No CLW/ES/C-34 Alt.O (As Per UVAM ID:2100711).
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II as and when required for the period from 01.10.2026 to 31.03.2027 including in Annual Overhauling works.
SUPPLY OF 3TON, 3PHASE SPLIT ACS FOR PLC PANELS OF CRUSHER HOUSE CONTROL ROOM AND STACKER PLCS AND COAL SAMPLING PLC ROOM IN THE CHP AREA AND
Providing labor assistance for emergency coal clearing of coal heaps, slurry coal on all floors of crusher house and jammed coal and wet and slurry coal in crushers, vibrating screens & belt feeder chutes and clearing of heavy coal heaps during rainy season in M-1(crushers), /CHP(M.M)-I&II/Dr. NTTPS. as and when required from 01-10-2026 or from the date of commencement of work to 31-03-2027.
Erection & Removal work of cup lock scaffolding inside Unit-1/Unit-2 Boiler including scaffolding material during 2026-27 Overhaul
SUPPLY OF HEAT OF COMPRESSION ROTARY DRUM ADSORPTION DRYER MDL:MD 300W FOR COMPRESSOR FOR AHP/STAGE-I
Supply Erection and Commissioning of 18 Channel Acoustic Steam Leak Detection system with manual purging for Tower Type Boiler pertaining to stg2
Supply, Installation, Testing and Commissioning of CCTV Surveillance System across the Coal Conveyor System of CHP/Stage-I&II of Dr.NTTPS/APGENCO on turnkey basis
Removal of ash and dust from pent house, Pent house Deck, F.G. Ducts, Hot PA ducts, APH and various locations of Units-I&II Boilers as and when required (including AOH) for the period from 01.10.2026 to 31.03.2027.
SUPPLY OF BIRD AND TRASH TRAP SCREEN FOR PA FAN AND FD FANS IN UNIT-1 AND 2 BOILER FOR THE YEAR 2026-27
Periodical, Preventive & break down Mechanical maintenance of Gear Boxes, Pulleys, including counter weight lifting, Decksheets, C Channels, Dewatering pumps, and other mechanical equipments of all conveyors available in MMSD-III/CHP/ DrMVR RTPP for the period 3 months from the date of issue of LOI
SUPPLY INSTALLATION TESTING COMMISSIONING AND TRAIL RUN OF MACHINERY AND EQUIPMENT FOR SOCIETY FOR ELIMINATION OF RURAL POVERTY ANDHRA PRADESH SERPAP
SUPPLY INSTALLATION TESTING COMMISSIONING AND TRIAL RUN OF MACHINERY AND EQUIPMENT FOR SOCIETY FOR ELIMINATION OF RURAL POVERTY SERP ANDHRA PRADESH SPV
Manufacturing, Supply and Installation of Mechanically Operated Escalator with Modular Belt Conveyor for Removal of Debris and Floating Matter at Drainage Station, including 6 Months Maintenance period in Guntur Municipal Corporation.
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1&2 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-1&2 as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027