Re-handling of spilled raw coal/slurry under and around the take-up pulley 116B and 133B and RGB entrance to tail end of 133B belt conveyor of Pre-Washery at Kedla Washery
Rubber Lagging of drum unit no. 1401 and 1402 and Cold vulcanizing joints of unit no. 1401 and 1402 conveyor belt at Loading section of Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of worn out intermediate frame and deck plates installation of idler frame with rollers fabrication and erection of same at 801 belt conveyor at Madhuban Coal Washery under Block II Area BCCL
Repairing by new change of shaft of tailend conveyor drum for 101 belt (Drum size- OD 800mm, Cell length 1600mm and Cell thickness 14mm) of vertical section of Moonidih Project. Sl.No.CD/101/01
Repairing/rewinding and rotor repairing of 90kW, 415 Volt make NGEF, Sl. No. 18431004, 3 Phase Induction Motor 1485 RPM and rotor of Feeder Breaker of Chain Conveyor of KDH OCP, NK Area
Replacement of conv. belt 1000 mm width 120mtrs. along with channels bracing angles, posts top and bottom idler frames dismantling, repairing and re-installation of unit no. 307 belt conveyor of Kedla Washery
Replacement of damaged non-drive (tail-frame arrangement, deck plate arrangement, top, bottom idler frame tail and head, snub pulley) of unit no. 415 , 247 belt conveyor of main plant of Kedla Washery
Dismantling and laying of conveyor belt and dismantling installation, erection of counter weight, idler frame of unit no. 902-1 of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing/ Modification and Replacement of Carrying Idler frame along with replacement of idler sets (including idler roller and return idlers) for unit 801-B, 402 and 504 belt conveyor at Moonidih Coal Washery
Repairing / Replacement of pathway gantry, deck plate and footway plate of different belt conveyor BC-4A, BC-4, BC-5, BC-8, BC-9 and BC-10 of Oversize Plant of Sawang Washery.
Fabrication, Erection and repairing of 79 and 80 Belt Conveyor gantry iron supporting structure column no. 1 and 3 including replacement of angle and channel etc. at Raw Coal Section of Kathara Washery
Fabrication and Installation of Truss members including tie beams, V-structure, channels, angles etc. after dismantling of damaged portion of roof and truss for conveyor gantry of unit 704 at Moonidih Coal Washery.
Repairing/ Strengthening of approaching Stair case, landing platform and its support for stairs going up to head end of unit 701 and unit 502 conveyor belt of Section-V at Moonidih Coal Washery.
Repairing/new change of M.S cell and etc. of tail end conveyor drum for rise belt and Tata belt of Tipler for Moonidih Project. Sl.No.MND/Risebelt /Tipler/01,02 and MND/Tatabelt /Tipler/01
Repairing of head drum and 1 no. of snub drum Assembly after dismantling of existing worn-out drums for unit 901 belt conveyor and refitting of all its accessories at Moonidih Coal Washery
Custom Bid for Services - RATE CONTRACT FOR VARIOUS PREVENTIVE OPTIONAL JOBS IN NEW OLD WAGON TIPPLER AND THEIR ASSOCIATED CONVEYOR SYSTEM At CTPS Chandrapura Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Rate Contract for Various Preventive & Optional Jobs in New & Old Wagon Tippler and their associated Conveyor System at CTPS Chandrapura Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200145698 Service Contract for Hiring Transportation Erection and dismantling of Scaffolding for Boiler Unit 2 Overhauling at NKSTPP Similar Category Operation and Maintenance Power House/Power Plant
Procurement of LED based light in place of existing 70 watt well glass conventional type light fittings for installation in different area of Boiler of 2x500MW Unit #1 of DVC, KTPS.
Upkeeping and removal of technological waste from Ball and Bowl Mills and various floors and platforms of TPP, CPP, Unit 9 Boiler areas and Grass and Jungle cutting around the plant
Custom Bid for Services - Supervision work by Ex BHEL expert and safety valve seat cutting during Overhauling of Boiler and Auxiliaries of BTPS 1x500 MW Unit DVC Similar Category Support Services
Complete repairing and rewinding of stator of 220 HP, 550 V, 1470 rpm make Kirloskar Electric, Sl No. 01/KE/220 for compressor machine of PB Project Colliery
Complete Repairing /Re-winding of 2 H.P. Compressor Motor with Piston at Old Magazine NT-ST and Devi Sthan Golden Pahari under Lodna Area ( Two no. of Pump)
Repairing of the crank shaft U.G Locomotive compressor machine, Qnty. 02 Nos. for LB-13, Sl.no. 03 and LB-13 sl.no.5 for Loco section of W.J.Area, Moonidih
Development of park by providing water fountain and I Love BTPS Signage in front of compressor house building and providing boundary wall in back side of sangam park.
Providing 440 V power (phase to phase) to Compressor installed at Excavation work shop from Tapin feeder by bypassing Charhi feeder at Tapin North OCP , under Hazaribagh Area.
Repairing of AC compressor, condensor and cooling coil and cleaning of AC connection line and refrigerant for dumper Sl. No. 10303, 10304 and 60391 dumpers of Bokaro OCP
Repairing of fresh water pump house shed along repairing/ Changing 6 inch dia delivery pipe of the same from thickener area to compressor house of Moonidih Coal Washery.
Supply and fitting of AC Compressor including refrigerant refilling for 11Ton Central Air Conditioner System, installed at Subhash Bhawan(Officers Club) at Harina Township under Block-II Area
Repairing of AC compressor condensor and cooling coil and cleaning of AC connection line and refrigerant for dumper Sl No 60431 10304 and 60615 dumpers of Bokaro OCP
Repairing or rewinding of one no compressor motor and one no filter fan motor, 5.5 Kw,7.5 HP of Marion Rope Shovel,M3214 of KDH OCP NK AREA
Complete repairing Star Delta Starter for 4 nos. of 180KW motors and 1 no. of 135KW motor, 550Volts Compressor House at Moonidih Project, WJ Area. Sl.No. Panel- 01,10,12,15,18
Making of adjustable slide plate of steady for gun metals 03 Pc of NH26 lathe M/c and fabrication of tool post of lathe machine (10 inch bed size) at RRWS
Complete rewinding and repairing of welding machine and repairing, rewinding and fitting of 20 HP, 440 Volt Compressor motor and Starter installed at JOCP work shop at ABOCP mine of Block-II Area.
Supply of Pillow Block
M5507326217 BELT, CONVEYOR, NN, FR, 1600MM, 500KN/M/4, 5MM, M5507326230 BELT, CONVEYOR, NN, FR, 1600MM, 1250KN/M/4, M5507326202 BELT, CONVEYOR, NN, FR, 1600MM, 630KN/M/4, 5MM
Engine Overhaul, Clutch Plate, Pressure Plate release bearing, Tail light Assy, Wiper blate arm, Gear box noise overhaual, All suspension kit and Road Spring
Spring Brake Actuator, Clutch Release bearing, Cover Assembly, Repair Kit OH of Rotary Pump, Assembly Clutch Disc, Major Seal Kit for Steering gear Box
1- Complete Dismantling, Fitting Engine Assly with Engine Mounting. 2- Gear Box Assy Complete Dismantling and Removing Fitting. 3- PTO Pump Complete Dismantling Fitting.
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Repairing of Air Conditioner System, Damaged Compressor and Blower motor repair for Dozer Model No. BD-155 M/c. Sl. No.- T-13610, BD-155 M/c. Sl. No.- T-13722, BD-155 M/c. Sl. No.- T-13602 and Tata Hitachi Model ZX650H BE Sl. No.- 182 of AADOC proje
Transportation of picked ShaleStone from Sawang Washery Hopper, Picking Belt Conveyor, loading by contractors Payloader, weighment at weighbridge of Sawang Washery and unloading mechanically near raw coal site heap no 10. Quantity 75000 Te 0.786 Km
Schedule-1 - 10 - M4837900251, Schedule-2 - 20 - M4837900252, Schedule-3 - 30 - M4837900253, Schedule- 4 - 40 - M4837900254, Schedule-5 - 50 - M4837900255, Schedule-6 - 60 - M4837900256, Schedule-7 - 70 - M4840903062, Schedule-8 - 80 - M4840903063, Schedule- 9 - 90 - M4840903064, Schedule-10 - 100 - M4840903065, Schedule-11 - 110 - M4840903066, Schedule-12 - 120 - M4837900218, Schedule-13 - 130 - M4837900249, Schedule-14 - 140 - M4837900215
ROLL MS: 152.4: L-2000: 25B. FLAT RETURN IDLER ROLL FOR 1800 MM CONVEYOR BELT WIDTH WITH OUT FRAME (Q3), ROLL MS: 152.4: L-670: 35C (Q3), IDLER ROLL MS: 152.4: L-1000: 25A BELT WIDTH - 1800MM. SPECIFICATION AND DIMENSION OF IDLER ROLL (Q3), DEFLECTOR ROLLER ASSEMBLY WITH BEARING AND PLUMMER BLOCK FOR BELT WIDTH 1800 MM. DIMENSION AND TECHN (Q3)
Collection of samples from different points of Washery such as raw coal, washed coal and washed power coal from running conveyor belts and carrying and preparation of the same at Laboratory for further testing
Replacement of Take-up Pulley Drum Assembly and Bend pulley drum Assembly after dismantling of existing worn-out drum for Unit-701 belt conveyor and refitting of all its accessories at Moonidih Coal Washery.
Transporting of belt structure(1200mm belt) from D-18 BG to D-16 B/G and Cleaning along belt structure of level conveyor belt in XVI(T) seam of Moonidih colliery, W J Area
Complete repairing and overhauling with spares for chain conveyor tail end shaft assembly as stand by for IR and Drive shaft assembly for Atlas Copco make Feeder Breakers installed at Tarmi siding of SDOCM
Replacement of wornout intermediate frame and deck plates, carrying rollers, return rollers fabrication and erection of same at 1201 belt conveyor of PS-9 section of Madhuban Coal Washery under Block-II Area, BCCL.