Loading…
Loading…
13,550 results • Best match
TTPS Mech II BM Unit IV Overhauling of load hangers of critical pipe lines and headers of Boiler during the annual overhaul in 2020 2021
TTPS Mech II AHP Unit V BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2025 26
TTPS Mech II BM Unit IV Reconditioning of coal nozzle and matching with coal nozzle tips released from Unit IV Boiler during 2025 2026 Overhaul
TTPS Mech II AHP Unit IV BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2025 26
MTPS I BM Unit I Boiler pressure parts AOH 202021 Over hauling of secondary air dampers Scanner Air Fans and its damper flap gate etc
Supply of galvalume sheets of thickness not less than 0.8mm conforming to IS14246 for coverage in 52 Mtr elevation four sides of Unit I Boiler
TTPS Mech II TM I Unit II Inspection overhauling and commissioning of actuators of Boiler Feed water Deareator system valves during annual Overhaul 2024 2025
TTPS Mech II AHP Unit V BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2024 2025
TTPS Mech II BM Unit V Inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2024 2025
TTPS Mech II BM Unit II Conducting RLA study in Unit II Boiler bearing registry No T 4607 during overhaul for the year 2023 2024
MTPS I BM Unit IV Boiler Pressure parts AOH 2020 21 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during Boiler license renewal 2020 2021
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS MechII BM Unit IVOverhauling of Coaloil burner and its tilting mechanism of corner 3 4 in Unit IV Boiler during the year 2025 2026
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House Unit 4 and 5
TTPS Mech II BM Unit II Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2023 2024
TTPS Mech II BM Unit IV Inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2025 2026
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Over hauling of secondary air dampers Scanner Air Fans and its damper flap gate etc
TTPS Mech II BM Unit II Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2021 2022
Replacement of SS Liner Plate in Main Drag Chain Coal Feeder and Metering Coal Feeders in Boiler # 7 at Energy Mechanical in TNPL Unit - 1
TTPS Mech II BM Unit II Renewal and repairing of damaged insulation arresting of buck stay in Unit II Boiler during the overhaul 2022 2023
TTPS Mech II AHP Unit IV BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2020 21
Custom Bid for Services - TI 008 22 Refractory Inspection agency for Inspection and refractory repair supervision in Boiler 12 3 Stack during Cogen shutdown 2023
Procurement of Radial, Axial and Bypass Seals for Air preheater 2A and 2B of Model 32.5 VIMT 2000 72 PA for Unit II 600MW Boiler
TTPS Operation Circle MPM-I Unit-I Clearing of coal powder choke up in PF pipes from mill 1F to boiler corner 3 and 4
TTPS Mech II BM Unit IV Repairing of worn-out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2020 2021
Renovation works in SRP and workshop and Providing floor coating system in second floor at Recovery Boiler No.3 Phase I at TNPL Unit I
SUPPLY OF CASSETTE BAFFLES FOR LTSH COIL LOWER ASSEMBLIES OF SIZE 1900 X 385 X 2MM THICK MATERIAL SS 304 GR FOR UNIT III BOILER
TTPS MechII BM Unit I Strengthening of attachment welding joint in Hot reheater assembly of Unit I Boiler during overhaul for the year 2023 2024
TTPS Mech II BM Unit III Conducting RLA study in Unit III Boiler bearing registry No T 4728 during overhaul for the year 2021 2022
procurement of Hot End, Hot Intermediate and Cold End heating element basket assembly suitable for Air preheater 2A and 2B for 600MW unit-II Boiler
procurement of High pressure Super Heater Divisional panel bend, Water wall Nipple bend, Access door assembly and Water wall soot blower bend for 600MW Boiler
RCC cast in situ construction work at 97m elevation of Cogen Boiler Chimney Stack for ongoing M and I Shutdown in Manali Refinery of CPCL
TTPS MechII BM Unit IV Replacement of eroded Economizer upper and lower banks in Unit IV boiler during the overhaul for the year 2024 2025
TTPS Mech II AHP Unit IV BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2024 2025
TTPS Mech II BM Unit IV Cleaning and Painting of Safety valve silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul 2020 2021
TTPS Mech II BM Unit III Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2020 2021
MTPS I BM AOH 2024 Unit I Boiler pressure parts-Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
TTPS Mech II AHP Unit V BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2021 22
TTPS Mech II AHP Unit IV BAH Repairing reconditioning replacing of BA hopper Feed gates tip plate boiler seal plate during annual overhaul 2021 22
TTPS Mech II BM Unit I Conducting RLA study in Unit I Boiler bearing registry No T 4606 during overhaul for the year 2023 2024
SP.16 NCTPSII ES circle CI Division BOP SD UnitII Carrying out Annual overhaul maintenance activities of CI equipments of Boiler Turbine and system areas
TTPS ES EM III Replacement of wornout essential spare parts by new ones of Freight cum passenger lift Sl.NoLM 2681 in unit V boiler area
TTPS Mech II BM Unit IV Cleaning and Painting of Safety valve silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul 2021 2022
TTPS Mech II BM Unit V Inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2025 2026
MTPS I BM DM Plant Unit II and III AOH 2020 Overhauling of Hot well makeup pumps 4 Nos and Boiler fill pumps 2 Nos
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House Unit 4 and 5
TTPS Mech II BM Unit V Full reconditioning of worn out coal nozzle tips to be used in Unit V Boiler during 2022 2023 overhaul
TTPS MechII BM Unit V Overhauling of wind box SADC AC DC scanner fans of Unit V Boiler during overhaul for the year 2024 2025
TTPS Mech II BM Unit I III Boiler Painting of the safety valve exhaust pipes, its silencers and CST tank during the overhaul 2021 2022