Loading…
Loading…
13,550 results • Best match
MTPS I BM Unit IV Boiler AOH 2021 Reconditioning and hard facing of used and worn out nozzles fixing of driver plates and allied works
TTPS Mech II BM Unit III Reconditioning of coal nozzle and matching with coal nozzle tips released from Unit III Boiler during 2025 2026 Overhaul
TTPS Mech II BM Unit IV Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Boiler during the year 20232024
NCTPS I ES Circle EM II Dn SD n I Rewinding of 8 Nos of various Capacities of LT motors of Boiler Auxiliaries sub division
MTPS I BM DM Plant Unit I to III AOH 2022 Overhauling of Hot well makeup pumps 6 Nos and Boiler fill pump 3 Nos
TTPS Mech II BM Unit II Reconditioning of coal nozzle and matching with coal nozzle tips released from Unit II Boiler during 2025 2026 Overhaul
MTPSI BM Unit III Boiler pressure parts AOH 2021 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I TM UNIT I Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during Boiler license renewal 2020 2021
TTPS Mech II TM I Unit III Inspection overhauling and commissioning of actuators of Boiler Feed water Deareator system valves during annual overhaul 2025 26
TTPS Mech II BM Unit IV Conducting RLA study in Unit IV Boiler Bearing Registry No T 5344 during the annual overhaul period 2021 2022
MTPS I BM Unit I Pressure parts Removal of deteriorated and peeled of Insulation and reinsulation of Boiler burner corners and SADC with new insulation
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
TTPS Mech II BM Unit II Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2024 2025
SUPPLY AND FIXING OF GALVALUME SHEETS OF THICKNESS NOT LESS THAN 0.8MM FOR ROOFING CONFORMING TO IS14246 IN UNIT I BOILER AS PER TECHNICAL SPECIFICATION
MTPS I BM AOH 2026 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
TTPS Mech II BM Unit I Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2025 2026
Replacement of damaged pipe rack structural columns, support tie and bracings etc., from Boiler#1 and 2 Chimney to CBP#2 area at Energy-Mechanical
MTPS I BM Unit I Boiler AOH 2019 Reconditioning and hard facing of used and worn out nozzles fixing of divider plates and allied works
Custom Bid for Services - NTPL BMC for cleaning in and around Boiler floor area of Unit I and II at NTPL Similar Category Support Services
Custom Bid for Services - SERVICE FOR THE OPERATION AND MAINTENANCE (O&M) OF BOILER HOUSE Similar Category Operation And Maintenance Of Other Machines And Plants
Custom Bid for Services - PREPARATION OF DDR DOCUMENTS FOR BOILER DD STRUCTURES AT VENDOR WORKS FOR TWO YEARS AS PER TENDER TERMS CONDITIONS QUANTITY 36000MT
Custom Bid for Services - SERVICE CONTRACT FOR LOCAL STRESS RELEIVING USING RESISTANCE FINGER ELEMENTS FOR BOILER PRODUCTION AREA AT BHEL TRICHY UNIT I AND II
Unit IVand V - Attending Breakdown works in HP valves, actuators, safety valves, WB, LRSB, PRDS etc in Unit IV and V boiler for the period from the date on or after 08.10.2018 and upto 31.03.2019
TTPS Operation Circle MPM II UNIT V Renewal of vertical shaft thrust bearing in Mill 5B gear box.
NCTPS I SE MI circle AMC 24 25 BM Dn Unit I II III On line arresting of steam boiler feed water leaks in HP LP valves MS and RH spray line valves and sampling line valve glands flanges and bonnet in boiler by ON LINE LEAK ARRESTING METHOD
GEAR OIL FOR HYT PIT WHEEL LATHE, Make : HPCL - HP PARTHAN - 68 / IOC - SERVO MESH SP- 68 /BPCL - MAK AMOCOM - 68 /IML GEAR OIL SP - 68 ( 210 x 2 = 420 Ltrs (2 Barrels)) Firm's offer: Make / Brand-MAK
Comprehensive Annual Maintenance Contract (CAMC) for maintenance of Surface Wheel Lathe CNC (BG) -Inv.No.2173 of Model SWL-46 of M/s. HYT make available in Shop-12 of Shell Division/ICF for a period of Two years.
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Rates for Lashing with 200 GSM Tarpaulin; for 40 FR as mentioned in NIT, Goods Transport Service – Per Trip based Service - Machinery & Equipment; Rates for Lashing with 200 ... - Machinery & ... - Machinery & ...
Inspection of rotary and traverse gear boxes, reconditioning of the head assembly and swivel tube assembly, cleaning the nozzle checking the rotary and traverse movement of the swivel tube assembly of water wall blowers in Unit V boiler durin 18-19
Facility Management of Electrical and Mechanical equipments of Elevators, Escalators, Travellators, Passenger Boarding Bridges, Conveyor Belt and Standalone Weighing Scales at Chennai International Airport (Year 2022-2024).
NCTPS I SEMII Circle ECHS Dn Renovation of existing severely corroded damaged horizontal gravity take up assembly and its structures in the conveyor BCN 46A and B
Rectification and replacement of existing severely corroded and damaged cover plates with supporting structures of counter weight platform Bottom and Top in the conveyor 11AB of ICHS.
SUPPLY AND ERECTION OF GALVALUME SHEETS OF THICKNESS NOT LESS THAN 0.8 MM FOR ROOFING CONFORMING TO IS14246 IN CONVEYOR 72 HEAD END AREA BOTH WALKWAY SIDE
NCTPS I M.II Circle ICHS Dn. Renovation of existing severely damaged corroded vertical gravity take up platform with supporting structures bottom in conveyor 12 AandB of ICHS.
ICHP- Replacement of worn out stringer channel, vertical supporting angle to a length of 25 mtrs. each from tail end towards head end of Conveyor-36A B
NCTPS I SE MII Circle ICHS Dn Strengthening of corroded column No C4 D4 E5 E6 from EDS floor to conveyor 4A bottom concrete at SCH I
MTPS I CHP II Breakdown work preventive maintenance Assistance for carrying out cold vulcanizing belt joint replacement of worn out/ damaged conveyor belt removal of weak joint
the supply of Chain Assembly Complete Set for Clean Out Conveyor of coal mill feeder(Consists of rivet, link Wing type, link and chain pin) - 8 sets
SAALE OF WASTE AND SCRAP OF FILTERS (VARIOUS TYPE) AND WASTE AND SCRAP OF CONVEYOR BELT BIT / RUBBER ON ONE TIME SALE BASIS FROM TNPL UNIT-2
TTPS - ICHP - Dismantling the existing damaged stringer channel, structural members corroded chequered plates and erection of new stringer channel, structural members and chequered plates in conveyor 57.
Erection of SS grade 304 seal plates for 26B Conveyor (Frame No.27 to 33, 42 to 47, 64 to 73, 82 to 89 95 to 123)
ICHP- Dismantling the existing damaged corroded floor chequered plates and MS channels and erection of new chequered plates and channels in Conveyor-26A B take up floor.
Supply of Self aligning return idler frame and 35 degree self aligned troughing idler frame for 1400mm belt width conveyor of 48A1 and 48B1 at SCH II
ICHP- Dismantling of worn out earth flats and providing new earth flats and earth pipes in Conveyor-49 54 track path at both east and west side.
MTPS I BM Unit IV PA fan 4A Removing the existing punctured ruptured nonmetallic expansion joint fabrication and fixing of used conveyor belt and other related works
ICHP- Erection of colour coated galvanium sheet for covering roof with support structure after dismantling worn out sheet in the slop Conveyor-26A B 185 mtr. Length
ECHP-II- Complete dismantling of Dust Extraction, impeller casing, 4 Nos. worn out wet collecting hoppers, bed frame structure of DES Dust Extraction System-4B repairing and commissioning work at Secondary Crusher House-II.
KGTPS - Operation works to be carried out for assisting shift Engineers at Main Control Room , GT, STG, Switch Yard, BOP, HRSG, GBC, Switch Gear Room, IA/PA compressors at KGTPS for the year 2019 - 20, from the date of commencement of work up to 31.
TTPS Mech II BM Unit IV V Boiler Breakdown maintenance works in Burner and H O Guns for the period from the date on or after 08 04 19 and upto 30 09 19
Unit III Boiler - Attending patch-up works in the air ingress area of the pent house and repairing the crown plates/ seal plates around the intersection of various headers in pent house during 2018-19 overhaul