Loading…
Loading…
1,026 live541 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
1,026 results • Best match
Improvement of MoRTH Identified Blackspots through construction of Grade Separators at Selected locations along NH 75 Corridor BW Km.216.91 to Km.302.42 with an effective improvement Length 25.6 Km under NH(O) on EPC mode in the State of Karnataka
CS for FS and Prep. of DPR for improvement to 2 lane with PS from Mishraulia to Bhengari of NH 727B and CS for Prep. of DPR for construction of 4 lane ROB parallel to existing old ROB over Samastipur_Darbhanga railway line at KM 67.000 of NH 322.
Renewal work by microsurfacing of four-lane road ODR-35 from National Highway Number 58 (Old) to Industrial Area in B.H.E.L. Ranipur Constituency of district Haridwar under Kumbh Mela Infrastructure Development
Engagement of user fee agency through E-Tender at Dumbarwadi Fee Plaza at km 125.700 for Malshej Ghat to Ane Ghat section (km 101.000 to km 161.212) at NH 222 (new NH 61) of two-lane section in the state of Maharashtra
Engagement of user fee agency through E-Tender at Nawabganj Fee Plaza at km 39.000 for the use of four lane of Kanpur-Lucknow section from km. 11.005 to km. 75.500 of NH-25 (new NH-27) in the state of Uttar Pradesh
IE for (PKG1) Dev of 6L access controlled greenfield highway starting from Junction with NH-60 at Adgaon (km. 138.00) to Ahilyanagar (km. 290.000) to start of Ahilyanagar bypass (km. 126.564) of NH-160 in Maharashtra on BOT (Toll) Mode 2nd call
Engagement of user fee agency through E-Tender at Hathitala Fee Plaza at km 175.680 for Barmer-Sanchor Gujarat Border section of NH-15 (New NH-68) to Two/Four lane with paved shoulder from Km 153.00 to Km 259.300 in Rajasthan
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Construction of Viaducts at 12 locations Cut and cover Tunnel at 02 locations and Pedestrian Underpass (PUP) at 01 location from Km 517.250 to Km 547.080 section of New NH-66 (Old NH-47) in the state of Kerala on EPC mode
Construction of Service Road at Chatauni Chowk, Construction of earthen shoulder at piprakothi and installation of gantry girder with Mahatma Gandhi Statue on NH-28 and NH-28A in the state of Bihar (2nd Call).
Consultancy Services for Authority Engineer during operation and maintenance period of Chhapra -Hajipur Section of NH-31 (Old NH-19) from Km.143.200 to Km.209.940 in the State of Bihar (Total length Km. 66.74).
SC services during OnM stage of 2LPS of Karauli Dholpur section of NH 23, and 2LPS of Uncha Nagla Khanuan Roopvas Dholpur section of NH-123 in the on EPC mode. (Total Length 175.908 km.)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN RAJASTHAN AND MADHYA PRADESH 2 O-M SITESNH-25/Bar-Bilara-Jodhpur/Ch-75-784/RHS/Vishnunagar/RJ
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
IE services for Four Laning Section of NH 166 from Chokak to Sangli (Ankali) Km. 145.300 to Km. 171.133 and Shiroli (Sangli Phata) to Chokak from Km. 0.00 to Km 7.719, between Kolhapur Sangli, be executed on HAM in Maharashtra on under NH (O).
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 77.102 (Chitrakoot Majhgawan Satna section) of NH 135BG (Design length 77.102 km) under NH(O) in the State of Uttar Pradesh and Madhya Pradesh on HAM
Consultancy services for Supervision Consultant during OnM of Six laning of Gurgaon kotputli Jaipur section of NH 08 (New NH 48) from km. 107.100 to km. 268.300 in the state of Rajasthan (Total Length 161.200 km)
Project Management Consultancy (PMC) Service for NHAI - Detailed Project Report (DPR); Underground Drainage Pipeline; DGPS Survey
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highway sections in Chhatrapati Sambhajinagar Division under RO- NAGPUR on 05 Year Contract Basis
Strengthing work from Ch. 240-200 to Ch. 245-400 of NH-120 Dumraon Bazar for the F.Y 2026-27 in the state of Bihar.
Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)
Tolling Operation Maintenance and Transfer of Asanpur- Forbesganj- Purnea section of NH-27 in the state of Bihar (TOT Bundle-21)
Const of 4/6L GF Ludhiana Rupnagar NH 205K from Jn with NE to Manewal (Ludhiana) to Jn with NH205 near Bheora (Rupnagar) with Ludhiana bypass under NH(O) in Punjab on HAM PKG 2 DC 37.700 to 66.440 and Ludhiana Bypass DC. 0.000 to 18.500 TL 47.240 km
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (Badwala to Lakhwar Bend) (realignment from km 12.00 to 31.122) on NH-507
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge (Approximate Span 400m) along with its approaches connecting NH-507 with NH-707A near Lakhwad Bend in the State of Uttarakhand
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highway sections in Nashik Division under Regional Office Mumbai on Five 05 Year Contract Basis
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highway sections in Pune Division under Regional Office Mumbai on Five 05 Year Contract Basis
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highway sections in Nagpur Division under Regional Office Nagpur on Five 05 Year Contract Basis
Plantation of 40,000 saplings using the Miyawaki method and their maintenance for three years, extending up to Bhauti Crossing within the New Transport Nagar Phase-2 scheme, parallel to the Lucknow-Agra National Highway.
One Time improvement of NH-9 (Rohtak Road) From Punjabi Bagh underpass till Tikri Border in the State of Delhi on EPC Mode
CS for Preparation of DPR for Six Laning of Hyderabad Yadgiri Section Length 35.65 km of NH-163 in the State of Telangana
Providing Of Garden Net With Bamboo stack and Tag for NHAI 27775, 29997 Plantation at Khanivade To Achhad
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System CCMS for Street Lighting on National Highway sections in Konkan and Goa Division under RO Mumbai on Five 05 Year Contract basis
One Time Improvement of Mozari Town from Km. 119.000 to Km. 123.000 on Existing NH-53 under EPC Mode.
Balance works of Aurangabad to Paithan project Section of NH-752E in the State of Maharashtra on EPC Mode
Development, Operation and Maintenance of Toilet and Parking Facilities at Multiple Toll Plaza Locations under NHAI Regional Office-Kolkata
Rectification of defects on Four lane Gujarat-Maharashtra Border-Surat-Hazira Port Section of NH-53 (Old NH-6) (approx. length 131.500 km) in the State of Gujarat on single percentage item rate basis at Risk and Cost of Concessionaire
Upgradation of road signages on NH 16 (Puintola to Bhadrak section) as per MoRTH circular dated 20.12.2024 and IRC 67 2022 in the State of Odisha
Consultancy Services for preparation of DPR / Feasibility Report for Jaigad Port Chiplun Satara (Junction with NH-48) Greenfield Alignment in the State of Maharashtra (98 km)
Tolling Operation Maintenance and Transfer of Purnea Dalkhola Raiganj section of NH-27 and 12 in the state of Bihar and West Bengal (TOT Bundle-22)
Construction of Island and Rotary at Aseni Tiraha, including Decorative Tree-Shaped Stainless Steel Sculpture, and installation of Street Lighting and Decorative Lighting on Aseni Road, Old National Highway No. 28 (Barabanki Urban Area) from Km 22.70
Consultancy Services for preparation of DPR-Feasibility Report Development of Port Connectivity from Dighi port-Poladpur-Surur (Junction with NH-48) greenfield alignment (Approx. Length-140 km.)
Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.
SURVEY OF EXISTING 132KV LINE FOR PROPOSED GORAKHPUR TO SILLIGURI EXPRESS (BHARAT MALA PARIYOJANA BY NHAI UNDER ETD-I GORAKHPUR.
Construction of 2 ROBs (129A and 134A) on the bypassed section of Thiruvarur Town in the Nagapattinam Thanjavur Section of NH 83 in Tamil Nadu on EPC Mode
Consultancy Services for Preparation of Detailed Project Report for 4 lane Access Controlled Development of existing 4-Lane from Solapur to Sangareddy Section of NH-65 (Length 246Km).
Construction of 6 lane Viaduct and service road from Baikampady (Km.365.200) to KIOCL junction (Km.368.275) of NH-66 in the state of Karnataka on EPC mode
Renewal by B.C. from km 1 to 6.80 of other District road from Military Chowk located on National Highway 58 to Village Saliyar (Old N.H.-73) in Roorkee Constituency of Haridwar district under Kumbh Mela Infrastructure Development 2027.
Annual maintenance & repair of National Highway-4 to Adi Jainwadi Sidnal Akkol road from km 0.00 to 6.20 and 7.00 to 13.00 in Nippani taluka of Belagavi district under the H/A 3054 MDR Maintenance FY 2026-27.
Strengthening and Overlay on damaged sections of Six lane Ahmedabad to Vadodara Section of NH 48 (Old NH-8) from Km. 6.400 to Km. 108.700 (Length 102.300 Km) in the State of Gujarat at Risk and Cost of Concessionaire on Single Percentage Item Rate Ba