Loading…
Loading…
1,028 live411 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
1,028 results • Best match
Strengthening and Overlay on damaged sections of Six lane Ahmedabad to Vadodara Section of NH 48 (Old NH-8) from Km. 6.400 to Km. 108.700 (Length 102.300 Km) in the State of Gujarat at Risk and Cost of Concessionaire on Single Percentage Item Rate Ba
Consultancy Services for Preparation of Detailed Project Report for Four Laning of Deogarh-Jharabeni section (Ch.175.545 to Ch.282.000) ( Tentative Length 106.455 Km) of NH-53 in Odisha
Six-laning of Vijayawada-Machilipatnam Section of NH-65 from design Ch.4.000 to Ch.63.695 (length 59.695 Km) in the State of Andhra Pradesh under Hybrid Annuity Mode
CS FOR PREPARATION OF DETAILED PROJECT REPORT FOR DEVELOPMENT OF 4 LANE ROAD FROM KM 62.100 (ANJILIMOODU - NEAR CHENGANUR TOWN) TO KUMILY KM 215.450 OF NH-183 IN KERALA
Engagement of user fee agency through ETender at Khuian Malkhana FP at Km 302.250 of Hisar-Dabwali Section of NH-10 from km 227.00 to km 314.600 in Haryana
Consultancy Services of SC for OM of 4L with PS from Coimbatore to Karur Section of NH 81 (Km 0.000 to Km 114.100) and 2L with PS from Neelambur (Km 144.680 to Madukkarai (Km 170.880) Section of NH-544 in the State of Tamil Nadu
Engagement of user fee agency through E-Tender at Makrauli Kalan at 9.800 Km fee plaza for 4-laning of Rohtak-Panipat section NH-71A in the State of Haryana
Six-laning of Hyderabad-Vijayawada Section of NH-65 Section Ch.39.85 to Ch.221.15 (181.30 Km) (Pkg-1) in the States of Telangana and Andhra Pradesh under BOT Mode
Consultancy Services for preparation of Detailed Project Report (DPR) for Four laning of TN/KL Border Thondi section (Tentative Length 225 Km) of NH 85 in Tamil Nadu (2nd Call)
Consultancy Services for Preparation of Detailed Project Report (DPR) for Four laning of KA/TN Border - Coimbatore section (Tentative Length 120 Km) of NH-948 in Tamil Nadu (2nd call).
Engagement of User Fee agency through E-Tender at Gandaboyanapalle Toll Plaza at km. 28.785 for construction of Four Laning of NH-71 from Madanapalle to Pileru in Andhra Pradesh
Balance work of Major Bridge on well foundation over River Gomti on NH 128A (Parallel to Shastri Bridge) in Jaunpur City in the state of Uttar Pradesh on EPC mode
Construction of Service Road along with 02 flyovers-underpasses at Ch. 85.750 to 97.250 on Guna Bypass Section of NH-46 in the State of Madhya Pradesh on EPC Mode
Engagement of user fee agency through e-quotation for Haidatpur FP at Km. 34.900 of NH-353J for the project of rehabilitation upgradation of Morshi - Chandurbazar Achalpur section in Maharashtra
CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM IN KERALA ON BOT MODE
Engagement of user fee agency through E-Tender at Darwha FP at km 41.400 km of Digras-Darwha-Karanja section from Km 0.000 to 74.351 of NH-361 C in Maharashtra
Engagement of user fee agency through ETender at Nekawala Fee Plaza at km 11.750 on Manoharpur Dausa section of Two Lane with paved shoulder of NH-11A New NH148 in Rajasthan
Maintenance of the Aurad-Sadashivgad National Highway No. 34 in Vijayapura Taluk for the year 2026- 27,from Km 337.89 to Km 342.00 and from Km 357.50 to Km 369.76. H/A 3054-03-337-0-05-200 SH Maintainance
Consultancy Services for preparation of DPR for Widening to Six lane of Dhule Palesnar (MP/MH Border) section of NH-52 in the State of Maharashtra (Approx. Length 89 km.) (2nd Call).
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
RFP for Selection of Implementation Agency for Development Deployment and Operation and Maintenance of NHAI Advanced Traffic Management System (ATMS) Monitoring Software
Rehabilitation work for damaged road sections from Km 47.800 to Km. 124.080 of Udali to Maibang section of NH-27 in State of Assam 2nd Call
Widening and Strengthening of Single and Intermediate lane to 2 Lane with paved shoulder from existing Chainage (Km 53.873 to Km 59.700) Design Chainage (Km 33.565 to Km 38.943) (Design length 5.378 km) on NH-507 in the State of Uttarakhand
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Const. of 4L from Kadur Km 256.530 to Hasnapur Potulamadugu Km 267.360 Mahabubnagar Bypass of Hyderabad Panaji sec of NH167 L 10.830km under NH O in the state of Telangana on EPC Mode.
Construction of Grade Separators at Sarona Chowk (Ch. 279.750) Udyog Bhawan (Ch. 269.000) Telibandha Chowk (Ch. 268.000) and Agrasen Chowk (265.500) in Raipur City portion of NH-53 at Raipur-Aurang section in Chhattisgarh .
Engagement of user fee agency on the basis of CB through e-tender for Balani Fee Plaza at Design Km 331.200 on Rajamunda to Barkote Section of NH-143 in the State of Odisha
Consultancy services for Independent Engineer for Construction of 4 lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH 65 in Solapur City on HAM in the State of Maharashtra.
Engagement of user fee agency through E-Tender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section of NH-352A (Pkg-II) in the State of Haryana
CS for AE for Construction of 6 no of Mangobandhar, Kendua, Tolesono, Jhajha, Narganjo and Bhairoganj Bypasses(Total length 19.450km)along with 2no. of DLP free sect. (total length 21.821km) to 2L with PS standard of NH 333A in the state of Bihar.
Engagement of user fee agency through ETender at Kharbi FP at Km 113.00 for upgradation 2 lane with paved shoulder from km 97.487 to km 137.250 of Nagbhid Armori Section of NH-353D in Maharashtra
Consultancy Services for Preparation of Detailed Project Report (DPR) for six laning of elevated corridor of Belghoria Expressway of NH-2E under North 24 Parganas district in the state of West Bengal (Length 6.013 Km)
Consultancy Services for preparation of Feasibility Report and Detailed Project Report (DPR) for upgradation to 6 Lane of Ranchi Hazaribagh section of NH 33 (from Km 41.500 to Km 114.000) in the State of Jharkhand
Development of 4/6 Lane Green Field Bypass for Etmadpur and Tundla Town on Section of Agra Etawah NH 19 from design Km. 0.000 to Km. 16.200 in the State of Uttar Pradesh on EPC Mode.
Consultancy Services for Preparation of the Detailed Project Report DPR for Six Laning of Vadodara Outer Ring Road approx. 75 km and Makarpura Borsad Section of NH 148M approx. 51 km in the State of Gujarat.
Short Term Maintenance of stretch from Km. 0.00 to Km. 30.000 (Assam West Bengal Border to Kachugaon Section) AS-12, NH-27 in the State of Assam. (2nd Call)
Engagement of user fee agency on the basis of Competitive Bidding through e-tender for Rampura Toll Plaza at Km. 23.300 2-4 lane with Paved Shoulder NH 548B Vijayapur Sankeshwar Section in the state of Karnataka
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
Obaidullaganj Km. 2.800 to Km. 8.300 and Km. 20.700 to Itarsi Km. 63.000 of NH 69 Excluding Ratapani from Km. 08.300 to Km. 20.680 in the state of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) Mode.
IE SERVICES FOR CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM ON BOT (TOLL) MODE IN THE STATE OF KERALA.
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
AE services for Development of Access Controlled Highway of 4 lane from Kadur (Km 256.160) to Hasnapur/Potulamadugu (Km 267.360) (Mahabubnagar Bypass) of Hyderabad Panaji section of NH167 (length 11.200km) under NH(O) in Telangana on EPC mode.
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Collection of User Fee at Toll Plaza through Fee Collecting Agency for NHAI Toll Plaza Name NALAVADI FEE PLAZA IN THE STATE OF KARNATAKA
Collection of User Fee at Toll Plaza through Fee Collecting Agency for NHAI Toll Plaza Name Komalla fee plaza in the state of Telangana
Construction of Temporary Toll Plaza at Thennilai (Km.91.600) in Coimbatore Karur Section of NH-81 in the State of Tamil Nadu
Deeping And Renovation of Pond Puranna NH 24 Highway ke Pass Sikheda Muradabad Block Simbhawali Distt. Hapur
IE Services for development of a Link CC connecting the NH-31 Varanasi Ring Road, along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-Km19.420 (14.720 Km including MCW Loop Ramp) in Uttar Pradesh on HAM