Loading…
Loading…
132 results • Best match
Improvement of rural road from NH-04 main road to old dam for a length of 660 mtr at Kadamtala under CD-I, Rangat.
Resurfacing of Road from NH 04 to PS Graracharma to Burial Ground Murda Khadi at Garacharma CH 1100 mtrs under SDIII, CDIII, APWD, Prothrapur.
Construction of road from pahadi nallah road to NH via Shri.Deepak Ram Land at ograbraj-02 under Gram Panchayat mithakhari by Zilla Parishad, South Andaman
AR and MO Rural Road under RCD, APWD, Wimberly Gunj during 2025 26. S.W Improvement of Approach Road from NH-04 to WTC at Caddle Gunj.
AR and MO water supply under SD-V, CD-I, APWD, Rangat. SW - Extension of pipe line Panchawati filter bed to pipe line laid by NH.
Repair and Maintenance of CC Road and CC Drain from NH to Kader Tekrey road via Mohd. Ali house at Ograbraj-02 under Gram Panchayat Mithakhari.
Improvement of rural road connecting NH-4 to Civil Supply godown Birdline for a length of 360 mtr under Sub-Division No.III, CD-II, APWD, Prothrapur
Improvement of rural road from ATR - NH to Kalsi village for a length of 1.653 Km - From Ch. 3.00 Km to 4.653 Km - under CD-I, Rangat
AR and MO rural road under SD-III, CD-I, APWD, Rangat. SW-Improvement of approach road leading to Fire Station from NH-04 in Baratang under Sundergarh.
AR and MO water supply under SD-V, CD-I, APWD, Rangat. SW - Extension of pipe line Panchawati filter bed to pipe line laid by NH - Re-call.
Construction of 01 No. RCC ring well 6.00 mtr dia and 7.5 mtr depth including pump house near NH-4 Ch. 191 of Panchawati village under CD-I, Rangat.
Construction of rural road from NH-223 to Shankar Nallah via old office-cum-residence for JE APWD including construction of 01 No. RCC culvert at Adajig - Balance work
Construction of 01 No. RCC ring well 6.00 mtr dia and 7.5 mtr depth including pump house near NH-4 Ch. 190 of Morice Deara under CD-I, Rangat.
AR and MO water supply under SD-V, CD-I, APWD, Rangat. SW - Extension of pipe line Panchawati quarry to pipe line laid by NH and Connecting to Chitrakut source.
AR and MO Rural Road under Ferrargunj Sub Division during 2025-26. S.W Improvement of Rural Road from NH to Govt Senior Secondary School under Ferrargunj Sub Division, RCD, APWD, Wimberly Gunj.
Re-alignment of PPR pipe line for a length of 3.90 Km from Old APWD CC weir at Damp No. 10 to main road NH-4 near Kallu Nallah Bridge Kadamtala - Phase-I.
Construction of Galvanised Iron Foot Bridge over Nallah Swadeshnagar to connect Shantipur village with NH 207 km under NACD, APWD, Mayabunder.SW-Reconstruction of 01 No. Wing wall with slided portion of approach path
A/R M/O Rural Road under Sub Division No.III, NACD, APWD, Mayabunder.SW-Improvement of Rural Road from NH-4 to APWD Industrial Barrack at Swadeshnagar under Sub Division No.III, NACD, APWD, Swadeshnagar.
Providing and laying new PPR main supply pipe line from storage tank at Power House to Sheel Tikrey and Last Barrack along NH-4 at Sitanagar village under SD-V, CD, APWD. Diglipur
Strengthening of road side shoulders for the work NH 4 to Maccapahad, Shedhu House Maccapahad and Arogiya Swamy House at New Bimblitan for a length of 3.52 Km under SD-III, CD-II, APWD, Prothrapur.
AR and MO Rural Road under SD-III during 2023-24. SW - Construction of RCC retaining wall opposite Murugan Temple on rural road from NH-4 to Khara Nallah village for protection of road from sliding.
Providing of Drain as and when required under Gram Panchayat Calicut (both side/ one side) is required alongside the road from NH Road near Army Gate towards Kadiravan house via Gayatri Temple Road at Calicut W.No.05.
Supply and Laying of (a) 33kV UG electrical cable and (b) 400mm dia DI Water Pipeline, from Km 14.20 to Km 16.70 on NH-223 (New NH-4), affected due to widening/ upgradation of NH-223 (New NH-04) from Km 12.00 to Km 45.00 (Package-I) in the UT
Up-gradation of Rural Road from NH connection (Near Basantipur Chowk) to Basantipur Panchayat (Near Brajlal House) at Mayabunder North and Middle Andaman under PMGSY-III, Batch-I, 2024-25 Package No. AN03MB307, (Length 4.549 km) (3rd Call)
A/R M/O Rural Road under Sub-Division No.II, NACD, APWD, Mayabunder during 2025-26.SW-Strengthening of Road Side Berm with Cement Concrete from NH Road Petrol Pump to D.C Bungalow under SD-II, NACD, APWD, Mayabunder
A/R M/O Rural Road under Sub Division No.II, NACD, APWD, Mayabunder during 2025-26.SW-Repairing of pot holes and depression at various streches on road from NH main road to PHC Tugapur under Sub Division No. II, NACD, Mayabunder.
Augmentation Imp of Water Supply from Rajaplot source to Hathilevel under CD, DP in lieu of shifting and Re laying of existing pipeline adjacent to NH 4 ic P L new pipeline wherever required 298 Km to 330 Km from Kalara Junction to Lamiya Bay
A/R M/O Rural Road under Sub Division No.II, NACD, APWD, Mayabunder during 2025-26.SW-Repairing of Pot Holes and depression at various stretches on road from NH main road to ANIIDCO Petrol Pump via Webi School under Sub Division No.II, NACD, Mayabun
Slope Protection work at km 71.720, in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020- 21- 2nd Call
Improvement of Rural Road from NH 4 Single Pahad to Badmashpahad for length of 1.40 Km.
Slope Protection work at 02 Locations (km 72.00 and km 72.80), in Jarwa area from km 59.40 to km 107.00 of NH-223 (New NH-4) in the Union Territory of Andaman and Nicobar Islands in the year 2020-21- 2nd Call
URGENT RISK AND COST ROAD REHABILITATION AND UP-GRADATION WORK FROM KM 206.000 TO KM 239.425 ON NH-04 (OLD NH-223) IN THE UNION TERRITORY OF ANDAMAN and NICOBAR ISLANDS, AT THE RISK AND COST OF EXISTING EPC CONTRACTOR FOR PACKAGE IV, ON PERCENTAGE
Urgent maintenance of existing NH 04 portion from Kalara Junction Ch. 298.000 Km to Lamiya bay Ch. 330.662 Km - Retender
Improvement of rural road from ATR NH to Kalsi village for a length of 03 Km 0.00 to 3.00 KM - Balance work
Construction of Black top Road and drain near CIARI NH-4 to D Toppo house at Chouldari 03 under Zilla Parishad South Andaman
Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman and Nicobar Islands.
AR and MO District Road under RCD, APWD, Wimberly Gunj during 2022-23. S.W Improvement of Road from NH-04 to Community Hall at Tusnabad (0.50 Km).
Construction of lane minor bridge at Km 26.700 (Dhanikhadi) in CRZ area on NH-4 in the Union Territory of Andaman and Nicobar Islands on EPC basis
Ordinary Repairs of NH-4 from Ch 59.40 km to Ch 107.00 km (Jarawa-I) in the UT of Andaman and Nicobar Islands in FY 2022-23
Ordinary Repair of NH-04 from km 0.000 to 45.000 (excluding km 21.000 to 28.000) in the Union Territory of Andaman and Nicobar in the FY 2026-27
Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 in UT of Andaman Nicobar Islands 3rd call
Ordinary Repairs of NH-4 from Ch 21.000 km to Ch 28.000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call
Ordinary Repairs of NH-4 from Ch 21.000 km to Ch 28.000 km in the Union Territory of Andaman and Nicobar Islands in the year 2021-22-2nd Call
Ordinary Repairs of Nh-4 from Ch 138.30 km to Ch 155.00 km (Jarawa-II) in the UT of Andaman and Nicobar Islands in FY 2022-23-3rd Call
Restoration and Rehabilitation of road from km 21.0 to km 28.0 on NH-4 in the UT of Andaman and Nicobar Islands in FY 2022-23 on EPC Basis.
Periodic Renewals of NH-4 from Km 59.400 to Km 107.000 (Jarawa-I) in the Union Territory of Andaman and Nicobar Island on Item Rate Basis in the FY 2023-24.
Resurfacing of Road from NH to Chota Balu 1.658Km under AEIII, CD III, APWD Prothrpaur . Sub work Cutting of tree standing road side at NH4, Kodiyaghat opposite to Shri. Aboobakkar House
in lieu of shifting and Re-laying of existing pipeline adjacent to NH-4 i/c Providing and Laying new pipeline wherever required 298.00 Km to 330.00 Km from Kalara Junction to Lamiya Bay
Rehabilitation and completion of balance work of section from Km 107.760 to Km 129.445, Km 129.445 (After Middle strait to Humphrey), Km 130.600 to Km 138.300 of NH-04 in UT of Andaman Nicobar Islands
SLOPE STABILIZATION WORKS FROM KM CH. 106.400 TO KM CH. 106.460 WITHIN JARWA I RESERVE FOREST OF NH 04 IN THE UT OF ANDAMAN AND NICOBAR ISLANDS ON ITEMS RATE BASIS IN THE FY 2025 26.