Loading…
Loading…
2,160 results • Best match
Short Term Maintenance of NH-37 from Rongpur MB School, Silchar to Ramnagar ISBT Silchar (Ch. 0.000 to 8.400) in the State of Assam in FY- 2024-25
MMPPNA_22_23_231 Construction of road from (i) Kanaibazar (NH-44) Raghurtuk Billbari Road. Part-1, (ii) Kanaibazar (NH-44) Raghurtuk Bilbari Road (Raghurtuk Billbari) Part-2 (Ch.100.00m to 1100.00m), (iii) Moina Hafania PWD Road to Nizhafania,
Road Safety Works at accident prone stretches from Km 37/000 to Km 107/000 of NH-39 (Old)/NH-129 (New) charged under contingency provision of the work (Job No.039/AS/2018-19/186).
MMPPNA_RIDF_XXXI_25_26_509 Improvement of Road from NH-15 to Jyotirmaya High School and NH-15 to Kakopathar Santipur Library under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
IOAOD ENGG Development of New A site Retail Outlet at Location Borgang (KM Stone 237) to Gomeri (KM Stone 246) on RHS of NH 52 (old) NH 15 (New) towards increasing chainage District Sonitpur State Assam
Strengthening of NH-127 C from Km 0.00 (Samthaibari) to Km 15.00( Bhur Tiniali) of NH-127C (total length-15.00Km) under Abhayapuri Construction Division in the state of Assam (Job No.127C/AS/2020-21/216)
MMNPPNA_23_24_177 Construction of Gaurab path NH 52 (New NH 15) at Court field tiniali to Station Feeder Road Via D.C Banglow. under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the year 2023-24, Dhemaji TC
Maintenance works through STMC for the year 2023-24 from Amingaon to Kalitakuchi section on NH-427 under PWD, Guwahati NH Division in the State of Assam. Job no. RW/GHT/STMC/AS/23-24/3
Construction of Access Roads (I) From NH-17 to Kharboja Village via Railway RUB No.364(A), (II) From NH-17 to Bar-Makri Village via Railway RUB No.369(A) under SOPD(G). Package No.SOPD_GSSRC_13
SOPD_SIG_20_21_12 Improvement of road from NH-15 at Barmile to Dolohat Tiniali (NH-15) via Dolohat Bazar Road (ch. 0.00m to 7100.00m) under Signature Project of SOPD-G (State Priority Scheme) for the year 2020-21,
Construction of 4 Lane Mangaldoi Bypass (NH-15)(Job no. 15/AS/2021-22/234) (Raising of distressed/ submerged stretch of km 30 (From Km 29.160 to Km 29.460) of NH-15 under Sanctioned Contingency Provisions
Construction of T/Dyke along right bank of river Killing from Ouguri to NH-Way.
Reconstruction of road from NH-36 Dengaon Bazar to Parakhowa Panjuri via Haza Rongpi gaon
MMUPPNA_RIDF_XXIX_23_24_42 Improvement and Upgradation of (i) NH-17 at Balajan to Daobhangi Bazar via Sahebganj (Ch. 0.00km to 6.70km), (ii) NH-17 at Targhat to Kanaimore (Ch. 0.00m to Ch. 1300.00m) including approach length of Asharikandi Terracota
Construction of ROB and its approaches in replacement of Existing Level Crossings i.e. KB-28 at Km 60.300 on NH-154 under NH Division Karimganj in the state of Assam. (Job No. ROB/AS/2024-25/267)
OR(DPP) works from ch.437.00 k to Ch.444.511(Total Length-7.511 km) of NH-15(Bogibeel Bridge approach) under Nagaon NH Division in the State of Assam, Job No TA.015/AS/2021-22-257
Road Safety/HKD/01 Traffic Calming Measures on lower Hierarchy road at junctions with higher hierarchy roads (NH-06 and NH 37) under Hailakandi Territorial Road Division for the year 2023-24 under 966-Road Safety Works.
Stage strengthening from Km.29.200 to 38.000 (Total Length 8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/2019-20/197)
MMUPPNA_RIDF_XXIX_23_24_65 Improvement of road from NH-37 (Jakhalabandha) to Hatimura, Keribakori to NKA, NKS Diversion road connecting to NH-37, NKS Silghat road via Teliagaon under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NAB
MMPPNA_22_23_202 Construction of road from (i) NH-515 at Kandulimothura to Kulajan Village Road from Ch0.00m to Ch1593.00m, (ii) NH-15 at Kopahtali Deori gaon to Sripani Kundimama Mondir road including routine maintenance for 4 (four) years
SOPD_G_24_25_22 Construction of Moinapara Athaichuk to Gumnadi Pratapgarh via Kolarichuk Rongpuria including NH 15 Boginadi to No 2 Tariyani Jengrai Garam Bazar Road (Part 3 NH 15 to Tariyani Jengrai Garam Bazar via Ratanpur Missamari, Kalaguru Tin
MMPPNA_RIDF_XXXI_25_26_14 Construction of road from (1) Sangundenga to Sarupathar Gaon, (2) NH-27 at Rengbeng Kalimandir to Sarupathar Jamunamukh Road, (3) NH-27 to Garubandha via Mikirgaon Road, (4) Pachim Tarani ati to Jhumurmur Village under Mukhy
Construction of Balance Work of the 4- laning of the Section from Jhanji to Demow of NH-37 Pkg- IV Structures and Toll Plaza under SARDP- NE, under EPC Mode.
Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode
Construction of Boundary Wall from Jyoti Batchara to End of Nursery (Parallel to NH-37), D.U.
Imp of road from NH-39 at Balipathar Bazar to RJ road via Bolai Hanse gaon
Construction of Footpath cum drain (1000m) in stretches on NH-54 at Silchar Town under CIDF.
Road Safety Measures for the roads connecting to NH-27 under Raha Territorial Road Sub Division
Restoration of damaged portion of Dikhow bund right bank from NH-37 to Dikhowmukh at Bagharchuk
Construction of 300 mtrs interlocking tiles track from NH- 127D to Charangbari Village (SQ-9984) (Q3)
Improvement and Widening of NH-15 at Bamungula to Mansiri under SOPD-G for 2019-20
Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875) Pkg-II Structures, under SARDP-NE
Widening/Improvement to 4 (Four) Lane with Paved Shoulder) of Kwaram Taro Village - Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode
Widening/Improvement to 4 (Four) Lane with Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam
Extension of existing culvert near Sanjoy Market on NH-54 at Silchar Town under CIDF for the year 2019-20
Repair and Maintenance of existing two lane of NH 37 from Nagaon to Rangagara Km 278.600 to Km 297.00 in the state of Assam
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH 37 Old Pkg IV Structures and Toll Plaza under SARDP-NE under EPC Mode
Periodical Renewal under Annual Renewal Programme (ARP) for 2019-20 from km 140/000 to 146/000 on NH-37 in the State of Assam on EPC mode under Guwahati NH Division. Job. TA/037/AS/2019-20/248
Strengthening and raising in Stretches (L 9.909 Km) including provision of road side drain and road safety measures from Jagiroad to Marigaon on NH-715A under SOPD for the year 2020-21 under PWD Nagaon NH Division, Nagaon
ASOM_MALA_3.0_25_26_09 Improvement and Upgradation of Road from NH-37 at Jirighat to Joypur Connects with NH-137G Pailapool-Joypur-Harinagar Kumarcherra Road via Bhahadurpur, Boma Punjee and Phailen Punjee under Asom Mala 3.0 for the year 2025-26
Stage strengthening from km.928/00 to 938/00 (Total length - 10.00km) of NH-17 (new)/NH-31 (old) under Abhayapuri Construction Division ,Abhayapuri for the Annual Plan 2019-20 in the State of Assam under EPC mode.
MMPPNA_22_23_301 Construction of road from (i) Abhayapukhuri Sonari Chowk to Hetou Arimari L.P School, (ii) Chapai Dalgaon to Mahaliajhar (Barjhar), (iii) Bandia to NH 52 Road (Sarkar chowk to Ondolajhar), (iv) NH 15 to Dhula Kharupetia via Ozagaon
DEVELOPMENT OF NEW A SITE RETAIL OUTLET AT NEW RO AT WITHIN 3 KMS FROM LANKA MAHAVIDYALA ON LHS TOWARDS NAGAON, ON NH 27 E.W-OLD NH 36, IN ERSTWHILE HOJAI DISTRICT, VILLAGE - PUB BHALUKUMARIKISAM, DIST.- NAGAON, ASSAM
MMPPNA_22_23_134 Construction of road from (i) Lesenka Gaon to kalabari Road, (ii) NH-37 to No.3 Chotohapjan (Chotohapjan to Chotohapjan), (iii) NH-37 to Doomdooma Bypass Via Chota Hapjan, (iv) Bebejia to Hatijan Connecting road including routine
Stage Strengthening from Km. 20/000 to Km. 48/600 (L-28.600 km) with bituminous concrete of Rangia-Daranga Road (NH-127D) under Rangia NH Division in the State of Assam under EPC mode under AP 2019-20.
Repair and rectification work including road safety works for proper upkeepment of the stretches of road from km 337 to km 357 of old NH-37(New NH-715) including approach road to Bagori Range, Kaziranga National Park
Periodic Renewal from Km 0.000 ( Rangia ) to Km 18.000 ( Borkhopa Village )of NH-127D under ARP for 2022-23 under Rangia NH Division, Rangia in the State of Assam under EPC(Job No.TA-127D/AS/2022-23/268)
MMUPPNA_RIDF_XXX_24_25_109 Improvement / Upgradation of road from (i) NH-37-A to Rangapukhuri (Ch 0.00m to Ch 1600.00m) and (ii) NH-15 Borpukhuripar (Ch 0.00m to Ch 1000.00m) Under Mukhya Mantrir Unnoto Pakipath Nirman Aachani (MMUPPNA) under RIDF-XX
Consultancy services for Authoritys Engineer for Supervision of ( CONSTRUCTION OF 4-LANE MANGALDOI BYPASS FROM KM 26.400 to km 41.500 ON NH 15 ( L- 15.10 km) UNDER RANGIA NH DIVISION IN THE STATE OF ASSAM under EPC mode)
Engagement of Manpower Service Provider for collection of User Fee on Galia User FP under Tolling Operation Maintenance and Transfer of Four Lane with paved shoulder of Kaljhar to Patacharkuchi section of NH-27 (NH-31) in Assam