Loading…
Loading…
1,260 results • Best match
FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 OLD NH 30 FROM KM 54.530 TO KM 115.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PH-I ON EPC MODE PACKAGE II
4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I
Operation and Maintenance work of Two Laning with paved shoulder of Bihar Sharif Barbigha Mokama section of NH 33 (old NH 82) from Km 94.478 to Km 149.053 in the state of Bihar on PBMC mode
Loading, Unloading and Transportation of Pond Ash from KBUNL Ash Dyke to NHAI 527C
Road Safety work at Two laning with paved shoulder of Muzaffarpur - Sitamarhi Sonbarsa section of NH -77 (new NH -22) from km. 2.800 to 89.000 in the state of Bihar.
A E for the Supervision of Permanent Rectification of 3nos. of black spots in NH 27 of U. P. Border Dewa-Kotwa section, 9 nos. of black spots of NH -27 of Kot Mehsi -Muz section, 4 nos. blackspots of NH -57 Muz-Dar-Purnea, 1 no. blackspot at
PBMC Work of NH 98(New NH 139) from Km 62.000(Arwal) to Km 96.000(Daudnagar), from km 96(Daudnagar) to km 127.45 (Jasoiya more) and from km 130.00(Rambandh,Aurangabad) to km 154.625(Hariharganj)( Total Length 89.975)in the state of Bihar.(2nd Call)
Balance work with Steel superstructure including approaches of new bridge over Gandak river in km. 423.00 - 424.00 of NH -28 (New NH - 27) in the state of Bihar on EPC mode.
Engagement of user fee collection agency for Babhniyawan FP at Design Km 16.030 (existing km 99.300) for the use of Arrah to Pararia from design kilometer 0.000 to kilometer 54.530 of NH 319(Old NH-30) in Bihar
Rate contract for transportation of pond ash from KBUNL ash dyke to NHAI Road construction projects
Engagement of user fee agency through E-Tender at Pokhraira fee plaza at km 54.350 for the section from km 1.300 to km 74.349 (Chappra-Rewaghat Muzaffarpur Section) of NH -722 (old NH-102) in the State of Bihar
Engagement of user fee agency through e-quotation for Katiyara Fee Plaza at Km77.821 of Village-Katiyara District-Rohtas for the project four laning of Pararia-Mohania section of NH-319 (old NH-30) in the State of Bihar
Construction of Four Lane Access Controlled Construction of Four lane access controlled Greenfield NH from Shivrampur (Ch. 55.002 Km) to Ramnagar (Ch. 109.324 km), at NH-119D under BMP in Bihar- (Amas Darbhanga PKG-II of 54.322Km) on HAM.
Consultancy Services of AE for Widening with 3-additional Lane abetting Existing two lane Chhapra Bypass Section of NH-19 from Km.143.200-Km.159.255 on NH-19 (Total Length 16.055 Km) in the state of Bihar on EPC
Engagement of user fee agency through E-Tender at Pokhraira fee plaza at km 54.350 for the section from km 1.300 to km 74.349 (Chappra Rewaghat Muzaffarpur Section) of NH -722 (old NH-102) in the State of Bihar
Construction of PQC service road, Construction of RCC Drain at several locations and Overlaying of wearing course on Patna-Bakhtiyarpur section of NH-31 (old NH -30) in the State of Bihar
Rehabilitation of Two _ Four Lane ROBS at Km 67 of Musrighararia _ Darbhanga Section of NH 322 in the state Of Bihar.
Routine Maintenance of Korha to katihar Section from Km 0.000 to 19.040 and from Km 28.400 to Km 30.250 of the section of NH 31 (Old NH 81) in the state of Bihar
Operation and Maintenance and Incident Management of of Patna Gaya Dobhi Section from 0.000 to 39.000 (Package -I) of NH -22 (Old NH- 83) in the State of Bihar.(Total length 39.00 km)
Operation and Maintenance and Incident Management of Patna Gaya Dobhi Section from 39.000 to km 83.000 (Package -II) of NH -22(old NH-83) in the State of Bihar.(Total length 44.00 km)
Operation and Maintenance and Incident Management of of Patna Gaya Dobhi Section from 83.000 to km. 127.217 (Package -III) of NH -22(old NH -83) in the State of Bihar.(Total length 44.127 km)
Maintenance of NH 30A from Km 0.00 to Km 71.774 for the year 2024_25 on PBMC Mode in the state of Bihar.
CS for IE Services for Construction of Four Lane Access Controlled GF (NH-119D) from village Kalyanpur (Ch.00.000) to Balbhadarpur (Ch.47.000) pkg-03 and Balbhadarpur (Ch.47.000 Km) to Bela Nawada (Ch.89.1.000 km) pkg-04 at NH-119D under BMP in Bihar
Cons and Upgradation to 4L from Siwan (Design Ch. 4.217) to Mashrakh (Design Ch. 50.123)of NH-227A including construction of 4L Tanrwa/Siwan Bypass (0 to Km 4.217) of NH 531 under Backward Area/Religious/Tourist Places(BRT)scheme in Bihar on HAM mode
IE Services for Construction of 4 laning of Patna-Arrah-Sasaram corridor PKG-2 1.Garhani at Ch.Km73.700 to Patar at Ch.Km84.300 2.Greenfield from Sadisopur at Patna Ring Road (NH-131G) Ch.Km0.000 to Asani Ch Km35.800 of NH-119A in Bihar on HAM Mode
Independent Engineer Services during Operation and Maintenance Period for the work of 4 laning from Km. 360.915 to 440.000 of Gorakhpur (UP-Border) -Kotwa section of NH -27 (Old NH -28) in the state of Bihar.
Construction of Service Roads at Bathanha Bazar and ICP Jogbani on four laning of Forbesganj to Jogbani section from km. 0.00 to 9.26 (ICP at Jogbani) of NH-527 (old NH-57A) in state of Bihar.
Removal of at-grade junction near Repura at Garkha Bypass on 2-laning with Paved shoulder of Chhapra-Rewaghat - Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC mode 2nd call.
Removal of at-grade junction near Repura at Garkha Bypass on 2-laning with Paved shoulder of Chhapra - Rewaghat - Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC mode 3rd call.
Short Term Maintenance work in AIIMS Golambar to Starting Point of Patli Path (Ch. 0.000 to 2.300) of NH 139W for the year 2024_25.
Independent Engineer Services during Operation and Maintenance Period for the work of 2 laning of Muzaffarpur -Barauni Section of NH -122 (Old NH -28) from Km. 519.600 to Km. 627.000 (Total Length - 107.400) in the state of Bihar.
Improvement and Upgradation of NH-727A from Km 88.670 (Rampur bujurg) UP Border to Km 92.992 (Mairwa) Siwan for the year 2024_25 on EPC Mode.
Appointment of RSC for the projects Biharsharif -Barbigha-Mokama of NH82, Mokama-Munger section of NH-80, Construction of approaches to Rail cum Road bridge across river Ganga near Munger ghat, Muzaffarpur- Barauni section of NH-28and Muz-Sonbarsa
Consultancy services for AE for Supervision of Four laning of Arrah-Pararia section of NH-319 from Km 0-Km 54.530 Phase-I (Package I) Four laning of Pararia-Mohania section of NH-319 from Km 54.530 to Km 115.330 in Bihar under BMP (Package II) on EPC
IE Services for the work of Const and Upgrad to 4 Lane from Siwan (Design Ch. Km 4.217) to Mashrakh (Design Ch. Km 50.123) of NH 227A including const of 4 Lane Tanrwa/Siwan Bypass (Km 0.000 to Km 4.217) of NH 531 in Bihar on HAM Mode
Routine Maintenance and Incident Management of Two Laning with Paved Shoulders of Bihar Sharif- Barbigha- Mokama Section of NH-82 from Design Chainage Km. 94.478 (Existing Chainage Km. 119.320 of NH-31) to Km. 149.053 (Existing chainage Km. 149.000
Appointment of RSC on the following projects in the State of Bihar - Purnia-Dalkhola section of NH-31, Muzaffarpur-Darbhanga-Purnia section of NH-57, Kosi Bridge (BR-5), Construction of 2nd flyover (LCW) in Kishanganj town, Forbesganj to Jogbani sect
Routine Maintenance of Six Laning of Aurangabad to Bihar/ Jharkhand Border (Chordaha) Section of NH-02 from km. 180.000 tokm 209.827 (Pkg - I) and Incident Management of Six Laning of Aurangabad to Bihar/ Jharkhand Border (Chordaha) Section of NH-2
Independent Engineer Services during Operation and Maintenance period for the work of 2-laning of Muzaffarpur-Barauni Section of NH 28 (from km 519.600 to 627.000 (Total Length 107.400 Km) of NH in the State of Bihar on DBFOT Toll Basis.
Removal of at-grade junction at Maker Bypass fork cross point towards Maker Bazaar on 2-laning with Paved shoulder of Chhapra-Rewaghat- Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC Mode 2nd Call.
T01-NH-30 LAHURBARI TO NH-14 CHAURASIYA
MRL11-NH 82 to NH 31 Via Gosaigaon.
Cons. of2 Lane with paved Shoulder of Selected Rd. stretches from Bakaur to Parsarma Sec-1( 13.300 to 18.875)NH-527A Parsarma to Bariyahi Sec-2(0 to 24.068)NH-327E Bangaon Bypass Sec-3(0 to 3.820)Mahishi Spur Rd. Sec-4(0 to 5.720)BMP Ph-I in Bihar
Independent Engineer Services for OandM Period for the work of 4 lane Muzaffarpur-Darbhanga -Purnea section of NH 57 (km. 0.00 to km. 148.550 and 159.357 to km. 287.860) (BOT Annuity section) of NH -57 on OMT Basis in the state of Bihar.
Construction of Diversion Causeway for damaged Bridge at km 72 Nariyana and km 80 Mangobandar of NH 333A for the year 2025_26 Job No NH333A/BHR/2025_26/140.
Repair and rehabilitaiton of Bridges of Purnea - Dalkhola section of NH -27 in the state of Bihar(2nd Call).
Repair and rehabilitaiton of Bridges of Purnea - Dalkhola section of NH -27 in the state of Bihar(3rd Call).
Road Safety work at Purnea - Dalkhola Section of NH-27 Km. 410.700 to 447.000 in the state of Bihar.
T15-NH-1 BABHANDIH TO PATANWAN NH-2VIA SUSNAR
Jamun Gachhi NH-105 To Chhapki Tola NH- 105