Loading…
Loading…
1,260 results • Best match
Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode
Appointment of Safety Consultants for four lane access controlled Greenfield National Highway from Amas - Darbhanga (Pkg I - IV) section of NH-119D on Hybrid Annuity Mode in the state of Bihar
Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) under Bharatmala Pariyojana from village Kalyanpur (Design Ch. 0.000) to village Balbhadarpur (Design Ch. 47.000) (Amas-Darbhanga Package-III) in Bihar on HAM
Engagement of user fee collection agency for Babhniyawan FP at Design Km 16.030 (existing km 99.300) for the use of Arrah to Pararia of National Highway number 319(Old NH-30) in the State of Bihar
Engagement of user fee collection agency for Babhniyawan FP at Design Km 16.030 (existing km 99.300) for the use of Arrah to Pararia of NH30 to 60.800 of NH30) of National Highway number 319(Old NH-30) in the State of Bihar
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAYS ON LEASE BASIS IN THE STATE OF UTTAR PRADESH AND BIHAR (DBOT-3 SITES)NH-34/Aligarh-Kanpur/Pkg-3/295 PLUS750/LHS/Saray Maddu/UP
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAYS ON LEASE BASIS IN THE STATE OF UTTAR PRADESH AND BIHAR (DBOT-3 SITES)NH-327/Bahadurganj - Araria/85 PLUS 525/LHS/Araria Basti, Taran/BR
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAYS ON LEASE BASIS IN THE STATE OF UTTAR PRADESH AND BIHAR (DBOT-3 SITES) NH-34/Aligarh-Kanpur/Pkg-3/283 PLUS 640/RHS/Aram Sarai/UP
Construction of 4lane access controlled Greenfield National Highway from Balbhadarpur (Ch.47.000) to Bela Nawada (Ch. 89.210) at NH119D under Bharatmala Pariyojna in the state of Bihar (Amas Darbhanga Package-4 of 42.210 Km) on HAM Mode
Engagement of user fee agency through e-tender at Kulhariya Fee Plaza at Design Km 39.700 for the use of four and more lane of Koilwar-Bhojpur section of National Highway number 922 in the State of Bihar
Construction to 2 lanes with Paved Shoulder of Jandaha Bypass of NH 103 NH 322 in CH 0.000 existing km 30 of NH 103 to CH 4.800 existing Km 35 of NH 103 in the State of Bihar for the Year 2022 23. (Job No- NH-103(New NH-322)/BR/2022-23/68)
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN OANDM BASIS IN THE STATE OF BIHAR AND CHHATTISGARH(Site - Bilaspur -Korba/NH-130/30 Plus 800/LHS/ Belha/CG)
STMC Work from km. 104.20 to 110.00 of NH 727 under NH Division, Motihari for the year 2024-25 in the State of Bihar.
Development, Operation and Maintenance of Wayside Amenities on Different Sections of National Highway on Lease Basis in Bihar and Jharkhand DBOT-3Sites
Construction of flyovers at (i) Major junction between NH-77 (NH-22) SH-49 at Mahua Chowk (ii) intersection between NH-77 MDR Lalganj to Muzaffarpur at Fakuli in 4-laning of Hajipur-Muzaffarpur Section of NH-22 in the state of Bihar on EPC mode
Appointment of Road Safety Consultants on the following projects in the State of Bihar - Chappra-Rewaghat-Muzaffarpur of NH-722, Kotwa-Mehsi-Muzaffarpur section of NH-28, Gopalganj-Devaur-Kotwa of NH 28, Chhapra-Gopalganj section of NH-85.
Rehab,Upgrad and Const of 2L with PS from Hatwaria near Umagaon Junc to Kaluahi(Sec I)NH 227L,Saharghat to Rahika(Sec II)NH 227J,Rahika to Rampatti Madubani Bypass(sec III)NH 527A and Bideshwarsthan to Bheja(sec IV)NH 527A,of 88.655 KM BRT in Bihar
Construction of RCC Drain in KM 54 (P) (Milky Gaaon) of NH 33 (Old NH 110) (Total length 782 mtr.) for the year 2024_25 under FDR.
PBMC Work of NH 98(New NH 139) from Km 0.000(Anisabad, Patna) to Km 62.000(Arwal) (Total Length 62.000 Km) in the state of Bihar.
Performance Based Maintenance Contract for the Maintenance of NH 227 (Banjhoola Km 0.00 to Sheohar Km 40.00) Under NH Division Motihari For The Year 2024-25.
Construction of RCC approach Road and RCC drain from National Highway to LPG Bottling Plant and Adjacent BPCL Oil Depot at Sherpur Muzaffarpur
Construction of Four Lane Access Controlled Greenfield NH from Amas (on NH-02) (Ch.00.000) to village Shivrampur (Ch.55.002) at (NH-119D) under BMP in Bihar (Amas-Darbhanga package-I of 55.002 km) on HAM.
One time Improvement from Km 26.800 to Km 28.000 of NH-104 (New NH-227) ( Total length 1.300 Km) for the FY 2023_24 in State of Bihar.
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
IE services for Construction of four laning of Kishanganj-Bahadurganj Spur connectivity NH-27 and NH-327E Uttar Rampur(0.000) and NH-327E Satal Istmarar Bahadurganj (23.649) and interchange at start point in Bihar on HAM (2nd call)
PBMC work in km 1.521 to km 14.500 and Km 30 to Km 45 of NH 331 (Old NH 101) for the year 2025_26 in the State of Bihar.
Performance Based Maintenance Contract from Km 25.00 to Km 64.00 of NH 28B (New NH 727) (Total length 39 Km) for the FY 2023 24 in State of Bihar.
PBMC Work of NH 22 Old NH 99 Dobhi Gosaidih road from Ch 0.000 to Ch 11.400 for year 2023 24
Transportation of pond ash from ash dykes of NTPC Farakka to NHAI sitesof NH -34 for Raiganj- Dalkhola section and New 4 lane Farakka bridgeover river Ganga including approaches
CONSTRUCTION OF 4LANING OF KISHANGANJ-BAHADURGANJ SECTION AS A SPUR CONNECTIVITY NH-27 AND NH-327E UTTAR RAMPUR (0.0) AND TERMINATING AT NH-327E NEAR VILLAGE SATAL ISTMARAR BAHADURGANJ (23.649) AND INTERCHANGE AT START POINT IN BIHAR ON HAM (2nd call
Short Term Maintanance Contract (STMC) of NH 527E Km 0.00 (Hajma Chowk) TO km 27.850 (Near Kumhiya Chowk) in Existing Alignment Under NH Division Samastipur for the year 2024-25.
Development and Widening to two lane with paved shoulder work from km 0.00 (Hajma Chowk) to km 4.00 (Ramnagar) of NH 527E, under NH Division, Samastipur for the year 2024_25.
Repair work considering Road Safety and traffic regulation at Ch Km 25.00 of NH-727 including Median Extension at Station Chowk, Bettiah under NH Division, Motihari for the year 2025-26.
IE Services for Construction of 4Lane Access Controlled Greenfield NH(NH-119D) Package-I from village Amas (on NH-02) to village Shivrampur pkg-01 and Shivrampur (Ch.55.002 Km) to Ramnagar (Ch.109.324 km) Pkg-02 at NH119D under BMP in Bihar
Balance Works for Four Lanning of Koilwar to Bhojpur Section of NH-30 and 84 (New NH-922) from Design Km 33.250 to Km 77.100 and Bhojpur to Buxar section of NH-84 (New NH-922) from Design Km 77.100 to Km 125.000 in the state of Bihar under NHDP Phase
Engagement of user fee collection agency for Babhniyawan FP at Design Km 16.030 (existing km 99.300) for the use of Arrah to Pararia from design km 0.000 to km54.530 (Existing km 115.330 of NH-30 to 60.800 of NH30) of NH 319(Old NH-30) in Bihar.
Four laning of Rajauli-Bakhtiyarpur section of NH-31 New NH-20 from Km 101.630 to Km 152.520 Pkg-III on Hybrid annuity mode in the State of Bihar
Construction of VUP at Sonho (Junction Point of SH 73 and NH 722) on 2-laning with Paved shoulder of Chhapra - Rewaghat -Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC Mode.
Repair and Maintenance of Rajauli -Bakhtiyarpur section from km 47.723 to km 54.405 (Package-I) of NH-31 (New NH -20) in the state of Bihar.
Widening with 3 additional Lane abetting Existing two lane Chhapra Bypass Section of NH-19 from Km.143.200 to Km.159.255 on NH-19 (Total Length 16.055 Km) in the state of Bihar
Repair and Maintenance of Muzaffarpur - Darbhanga - Supaul section of NH - 27 (old NH - 57) from Km. 0.00 to 145.450 in the state of Bihar. (Total length 145.450).
Routine Maintenance and Incident Management of Two laning of Muzaffarpur -Barauni Section of NH - 122 (Old NH -28) from 519.600 to 627.163 in the state of Bihar.
Construction of VUPs at km 565.175, at km 574.550 and at km 593.660 of NH-122 (Old NH 28) in the State of Bihar on EPC mode.
Short Term Maintenance Work for Left out Portion of NH-219 Under Short Term Maintenance Contract (STMC)
Loading and transp. of pond ash from NTPC KhSTPP and unloading at NH333B Rail cum Road project on River Ganga for NHAI MUNGER
Overlay Maintenance of NH-31 (old NH-19) from Km. 174.300 to 179.700 and From 180.200 to km. 197.800 (Aami to Sonepur) in the State of Bihar (2nd Call).