Loading…
Loading…
1,260 results • Best match
NH-31 Bardaha to Mirka Tola
NH-2 To Awariya Harijan Tola
NH-106 Arar to Depura tak
NH 30 To Bhelain West Tola
NH-77 Ramnagra To Lalit Tola
MOTIHARI CHHPWA NH 28A ROAD - SAPAHI
MRL01-Babhangama NH-106 To Pakri
NH 104 to Dhata Tol Sanpatha
Hardia Sector AC To NH 31
NH-106 Sirsia to Maujaha Tola
T01-NH-28 Rajepurmathiya to maglapur
MRL01-NH-105 To Paraul Road
Rahimpur NH 31 To Akniya (Track6)
Engagement of user fee agency through E-Tender at Dalsagar Fee Plaza at Design Km 115.500 for the use of four and more lane of Bhojpur-Buxar section from design km 77.100 to km125.000 of NH 922 in the State of Bihar
Engagement of user fee agency through E-Tender at Toll Plaza-1 at km 52.662 Village-Devkuli of Jehanabad District and Toll Plaza-2 i.e. at km 111.145 Village-Jindapur of Gaya District on Patna- Gaya-Dobhi Section of NH-83 in Bihar
Engagement of user fee agency through E-Tender at Routara fee plaza at Design Km 42.180 for the use of four and more lane of Narenpur Purnia section from design kilometer 6.000 to kilometer 55.000 of NH 131A in the State of Bihar
Engagement of user fee collection agency on the basis of competitive bidding through e-tender at Kakan Fee Plaza at Km. 80.883 of Bahadurganj-Araria section from design chainage Km 49.000 to Km 93.983 on NH-327E in the state of Bihar
Construction upgradation of NH 131A from 34.600 design Ch 6.000 Narenpur 79.970 design Ch53.000 Purnea to 4 lane standard and from Km 79.970 design 53.000 to Km 82.000 design Ch 55.000 near Purnea to 2 lane with PS standard in Bihar on HAM
Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH-19 and Varanasi Ring Road near Rewasa village to junction with Chandauli-Cainpur road near Khainti village (Km.0.000-Km.27.000) under BMP in UP and Bihar on HAM
IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch.0.000 to Garhani (at SH-12) at Ch74.432 package-1 of Patna Arrah sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call)
NH-103 Se Home (NH-103 Guru Chowk Se Visunpur Silobhan Nagina Singh Ke Ghar Ke Aage Tak)
Piprahi Panchayat Me Dharm Patti NH 57 Se Via Barhamn Tola Via Sharma Tola To NH 57 Tak
Maintenance and Repair Work NH 527B old NH 105 from chainage km 14 950 to km 53 76
Construction of Foot Over Bridge at Eleven locations at Six laning of Varanasi -Aurangabad Section of NH -2 from Km. 786.000 to km. 978.400 in the state of UP and Bihar on EPC Mode.
Consultancy for AE for Supervision of Construction of 2 Lane Bridge across River Kosi along with approach road from Bheja to Bakaur section of NH-527 A (D Ch Km 0.000 to Km 13.300) under BRT scheme of Bharatmala Phase-I on EPC in Bihar
Consultancy services for Authority Engineer for Supervision of Construction-Widening of 2 laning to 6 laning of Patna Ring road from Kanhauli to Ramnagar (SH-78 new NH-131G) with Design Chainage from Km 0.000 to Km 39.160 in the state of Bihar on EPC
IE for supervision of (i) 4-laning of existing 2-lane Galgalia-Bahadurganj Section from Ch.0.000 to Ch.49.000 (ii) 4-laning of existing 2-lane Bahadurganj-Araria Section from Ch.49.000 to Ch.93.983 on NH-327E in Bihar under BMP on HAM
CS for AE for Construction of 4 Lane EH and improvements at Gopalganj Town Ch 384.000 to Ch386.750 on NH 28 on EPC Construction of leftover portion of addi 2lane Gandak and rehabilitation of operational 2lane Gandak in 423to Km 424 of NH28 in Bihar
AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) PKG II (FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150)) AND (II) PKG III FROM PINDARI (KM 78.150) TO RAWALGANJ BYPASS (KM 117.120) IN UP ON EPC
AE for Construction of 6lane Greenfield corridor from Ramnagar to Kacchi Dargah NH 119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Engagement of user fee collection agency on the basis of Competitive Bidding through E-Tender for Garhdevi Fee Plaza at km 203.000 of Four laning between Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH-39 in the state of Jharkhand Bihar on HAM
Balance work of new bridge on Gandak river including approaches and rehabilitation of the existing Gandak bridge at km 206.436 of Chhapra- Hajipur section of NH-19 in the state of Bihar on EPC mode
L045-NH 80 to Puraini Sarai (VR45)RCC Bridge at L045 NH 80 to Puraini Sarai over chanan dhar
L045-NH 80 to Puraini Sarai (VR45)RCC Bridge at L045 NH 80 to Puraini Sarai over chanan dhar
CS FOR AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500) (PKG-I) AND (II) BUXAR SPUR OF LENGTH 17.270 KM (PKG-IV) IN THE STATE OF UP ON EPC MODE
Consultancy Services of Authority Engineer for Supervision of Project during OandM period of Two laning with paved shoulders of Biharsharif - Barbigha -Mokama Section of NH - 82 from Desing Chainage km. 94.478 (Existing chainage Km 119.320 of
Appointment of Safety Consultants for Four Laning of Munger to Mirzachauki (NH-80) section from Munger to (Design Chainage Km 69.520) to Mirzachauki (Km 193.931) on Hybrid Annuity Mode in the state of Bihar (3rd Call).
Reconstruction of new Bridge over Distress Bridge at Ch. 436.500, approaches and Construction of PQC at Purnia more in Purnea Dalkhola Section from Km. 410.700 to Km. 447.000 of NH-31 in the State of Bihar.
T06 NH-327 E to Aambadi Sondha
NH 107 to Mahadalit Sharma tola (Gen)
T07 (NH) To Noniya Tola Mithan Saray
NH-77 Ramnagra to Ansari Tola Ramnagra
MRL13-T03 NH Kishunpur to Katesar Bujurg
NH 102 Rewa Road To Haran Bandh
NH-2 (GT ROAD) To Badhaiya Bag
T04-NH 31 Fatki Chowk to Chahat
Approach Road From NH- 31 To Ramuchak
NH 105 Basauli Chowk to Mandal Tol
MRL03-NH 106 To Maura Via Jaipura