Loading…
Loading…
2,921 results • Best match
Tolling Operation, Maintenance and Transfer of Trichy Thanjavur section of NH 83 and Madurai Tuticorin section of NH 38 in the state of Tamil Nadu (TOT Bundle 19)
Annual Rate Contract (ARC) 2021-2023 for day to day maintenance of electrical equipments (LV and HV) and supplying of electrical items at NHAI Residential Complex, Pocket B-5 Sector 17 Dwarka New Delhi
Development, Operation and Maintenance of Wayside Amenities on different sections of National Highway on lease basis in Tamil Nadu (DBOT-2 Sites)Old_NH67_110-300_LHS_ Thanjavur_Trichy_Tamil Nadu
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN ANDHRA PRADESH, RAJASTHAN AND MADHYA PRADESH (DBOT-10 SITES)
CS of AE for the following projects 2 laned with paved shoulders of Nazibabad Kotdwar Section of NH-119 from Design Chainage 122.200 to 137.760 4 laning of Najibabad Bypass of NH-119 from Km. 105.423 to Km. 118.373 (excluding 2.45 Km. of NH-74 Bypass
CS for AE for Cons. of Realignment of NH-87 (New NH109) Sec. of Rudrapur Kathgodam from Design Ch. 0.000 (54.050 of NH 87) to Design Ch. 7.875 (61.550 Of NH 87) Due to Proposed Expansion of Pantnagar Airport (DL 7.875 Km) in Uttarakhand on EPC Mode
Kota Bypass and Cable stay bridge on NH-76 in the State of Rajasthan and Gwalior-Jhansi section from km 0.000 to km 103.000 (revised section Km.16.000 to Km.98.455) of NH-75 (New NH-44) in the State of Madhya Pradesh and Uttar Pradesh
Engagement of user fee agency through E-Tender at Mohammad Ibrahimpur fee plaza for Aligarh Moradabad Section of NH-93 (New NH-509) in the state of Uttar Pradesh
Strengthening of 2 lane with paved shoulders of Thanjavur Pudukkottai Section of NH-226 (New NH 36) from Km.0.00 to Km.55.23 in Tamil Nadu on PBMC Mode
Six Laning of Thaliparambha- Muzhapilangad section from Km137.900 to Km.170.600 of NH-17 (New NH-66) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojana
Four laning of Rajauli-Bakhtiyarpur section of NH-31 New NH-20 from Km 101.630 to Km 152.520 Pkg-III on Hybrid annuity mode in the State of Bihar
Consultancy services for Independent Engineer for supervision of Six laning of Proposed Chilakaluripet Bypass on NH 16 (Old NH 05) in the State of Andhra Pradesh under Bharatmala Pariyojna
Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode
Six Laning of Thaliparambha-Muzhapilangad section from Km 137.900-Km. 170.600 of NH-17 (New NH-66) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojana
Providing and fixing of high performance integrated core covering with acoustically transparent textile in Board Room and miscellaneous work at 7th floor, 2nd office building, NHAI, Plot No. G3 Sector 10 Dwarka, New Delhi 110075
Request for Proposal issued by Raajmarg Infra Investment Managers Private Limited (RIIMPL) for Empanelment and Appointment of Book Running Lead Manager(s) for units issuance of proposed Public Infrastructure Investment Trust being created by NHAI
Design development deployment testing Integration including maintenance support of a comprehensive web based application for monitoring and administering real-time time data received on Central Server Data Centre from TP on BOT Projects of NHAI
Comprehensive Maintenance of DG Sets Electrical Equipments and Electrical Installation Fire Protection system Water Treatment Plant/Systems CCTV Landscape/Horticulture and Other Misc. Works at NHAI residential Enclave Plot No B5 Sec17 Dwarka New Delh
Six Laning of Start of Kollam Bypass Km. 486.000 Kadambattukonam (Km. 517.250) sec of New NH 66 Old NH 47 in the State of Kerala on HAM under Bharatmala Pariyojana
Construction of 6-lane Flyover at Ainthapali junction and a 2-Lane ROB (LHS) on NH-53 (Old NH-6) in Sambalpur on EPC mode in the State of Odisha
Kasepalli at km 310.200 from Hyderabad to Bangalore section from Km 295.000 to km 374.000 (length 79.000 km) of NH-7 (New NH-44) in the State of Andhra Pradesh
Balance 11.96 km. stretch between Km.66.000 to Km.77.960 on NH-12(New NH-45) in Nauradehi Wildlife Sanctuary in the State of Madhya Pradesh on EPC Mode Basis
Construction of Mitigation Measure structures on CH-MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode
Six Laning of Paravoor (Design Ch. 417.000) - Kottunkulangara (Design Ch.454.500) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana
Six Laning of Thuravoor (Design Ch.378.612)-Paravoor (Design Ch.417.000) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana
Strengthening/ Overlaying on Six lanes Gurgaon Kotputli Jaipur section of NH-48 (Old NH-8) from Km 42.700 to Km 107.100 in Haryana at the Risk and Cost of Concessionaire.
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
ARC (2024-2026) for Day to Day Maintenance Repairs and Renovation of Furnishing Items CarpenteringItems CP and Sanitary Items Plumbing Sewerage Services Miscellaneous Civil Work at NHAI Residential Building Pocket B-5 Sector17 Dwarka New Delhi110078
Structural repair and rehabilitation of NHAI residential complex (Tower A-B-C including 02 Nos.of common basements) by using Sacrificial Anode Cathodic Protection micro-concreting etc at Pocket B-5 Sec-17 Dwarka New Delhi-110078
Anchoring and Facing Stones repair including fixing Stainless Steel/Carbon Steel/Galvanized Iron anchors dry stone cladding adjustable cramps at South and West Faces of NHAI HQ New Building G3 Sector 10 Dwarka New Delhi 110075
Six laning from Kappirikkad to Thalikulam section of NH 66 old NH 17 from Design Ch.335.850 Ex.km 349.260 to Design Chainage 369.015 Ex.km 382.300 in Kerala on HAM under BMP
Construction of Underpass on NH-31 (old NH-56) for proposed Expansion of Runway of Lal Bahadur Shastri International Airport at Varanasi in the state of Uttar Pradesh on deposit basis
Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd)
Six laning from Thalikulam to Kodungallur secton of NH 66 (old NH 17)from Design Ch. 369.015 (Ex. km 382.300) to Design Chainage 397.750 (Ex.km411.850) in Kerala on HAM under BP.
Four Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka
UPGRADATION TO FOUR LANE WITH PAVED SHOULDER OF NH-341 FROM BHIMASAR JUNCTION OF NH-41 TO ANJAR- BHUJ UPTO AIRPORT JUNCTION KM 0.000 TO KM 65.478 IN GUJARAT ON HAM
Balance Work of Four laning of Panvel Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in Maharashtra under Bharatmala Pariyojana on EPC mode
Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode
Strengthening and Improvement of Bareilly Sitapur section of NH 24 ( New NH 30) from Km 262.000 to Km 419.590 in the State of Uttar Pradesh on item rate contract (Single percentage).
Six Laning of Azhiyur to Vengalam section of NH 17 New NH 66 from Des.Ch. 189.200 to Des.Ch. 232.100 in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojna.
Four Laning with paved shoulder of section from km 53.600 (Gola on NH-320) to km 81.446 (Ormanjhi on NH-320 B) in the state of Jharkhand on Hybrid Annuity Mode
Completion of Balance Works of Panikoili-Rimuli Section of NH 215 New NH 20 from Km 0.00 to Km. 163.000 in the State of Odisha on Single Percentage Item Rate Basis.
IE services for SD of Jakh (Vijaypur)-Kunjwani NH-44 to 6-lane Exp. as part of Delhi-Amritsar-Katra Exp. Km 503.200-Km 515.000 of Kunjwani-Tawi Bridge NH-144A to 4-lane Ch.0.000-7.385 of NH-144A to Jammu Airport in JK on HAM (Phase II-Package XVI)
4 laning of existing Beas Baba Bakala Dera Baba Nanak (NH-503D)starting from Beas NH-3(Km. 417.700)and terminating at Kartarpur Sahib Corridor(Km. 0 of NH-354B and Km.153.800 of NH354 under BMP PKG-2(Design Ch Km 31.300 to Km 69.100 )on EPC in Punjab