Loading…
Loading…
2,921 results • Best match
4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I
Construction/upgradation of two lanes with paved shoulders of NH-911 from Sriganganagar to Raisinghnagar (Design Chainage -0.500 km to Design Chainage 101.000 km) (length 102.076 km) under NH (O) on HAM in Rajasthan (Pkg-1)
Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode
4laning of Aligarh Palwal Sec from Km.0.00 (Starting from junction of NH-34 Aligarh)to Km.46.390 PKG I from (Khereshwar Junction Kurana)of NH-334D Inclu Khair n Jattari Bypass in UP on HAM
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
4 laning of NH 167 from Gudebellur at Design Km 182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on Hybrid Annuity Mode (HAM) in the state of Telangana
Operation and Maintenance work of Two Laning with paved shoulder of Bihar Sharif Barbigha Mokama section of NH 33 (old NH 82) from Km 94.478 to Km 149.053 in the state of Bihar on PBMC mode
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
Construction work of 4-laning of Sandalpur to Nasrullaganj bypass end PkgI of NH-146B from design km 0.000 to design km 43.250 (DL 43.250 km) under NH(O) in Madhya Pradesh on Hybrid Annuity Mode
Engagement of user fee agency through E-Tender at Azizpur fee plaza at km 9.120 of Zirakpur Patiala section from Km 0.000 to km 50.000 of NH-64 (new NH-07) in the state of Punjab
Development, Operation and Maintenance of Wayside Amenities on different sections of National Highway on lease basis in Tamil Nadu (DBOT-2 Sites)NH38_214-310 to 214-510_RHS_ Koondalur_Tamil Nadu
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
SH- Transplantation of trees at Nangloi NH-10
Remodelling of PWD office at Ramesh Park, Pusta Road, due to widening by NHAI
4 lane with paved shoulder configuration of Pathrapali-Kathghora Km. 53.300 to Km. 92.600 Pkg II of Bilaspur-Kathghora section of NH-111 New NH-130 in the State of Chhattisgarh under Bharatmala on Hybrid Annuity Mode
Engagement of user fee agency through E-Tender at Kalapathar Fee Plaza at km 14.550 on Bankura Purulia Section from km 0.000 to km 83.562 of NH 314 (Old NH-60A) in the State of West Bengal
Engagement of User fee collection agency on the basis of e-quotation through e-tender for Shahpur Kalyanpur Fee Plaza at Km. 13.400 of Poanta Saheb Ballupur Section of NH 7 (old NH-72) in Himachal Pradesh
Engagement of user fee agency through e-quotation for Dumbarwadi Fee Plaza at km 125.700 for Malshej Ghat to Ane Ghat section at NH 222 (new NH 61) of two-lane section in the state of Maharashtra
Engagement of user fee agency through E-Tender at Mejia Fee Plaza at km 267.250 on Dhaldanga - Mejia Section from km 221.000 to km 271 of NH 60 (New NH-14) in the State of West Bengal
Four laning of NH-363 from Repallewada (Design Km 42.000-Existing Km 288.510) to Telangana-Maharashtra Border (Design Km 94.602 Existing Km 342.000) (Design Length 52.602 Km) in the State of Telangana under NH (O) on HAM
Upgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km 0.000 to Km 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1)
Construction of 4 lane Realignment of Old NH 207 (New NH 648) from TN/KA Border (CH 0.000) to Hoskote (CH 20.900) under Bharatmala Pariyojana as a part of Bangalore Ring Road in Karnataka on EPC Mode
Operation and Maintenance including Engineering improvement Initial Rectification of Two laning with paved shoulders of Aligarh Moradabad section of NH-93 (New NH-509) form km.79.000-km.232.000 in the state of Uttar Pradesh on PBMC
Four laning of existing two lane road from Ghoman to Tanda (NH-503A) from Km 54.000 too Km 85.500 (Design Length 31.500 km) on Hybrid Annuity Mode in the State of Punjab under NH(O) (Package-II)
Four Laning of NH-39 (old NH-75) from design Km 97.600 (existing Km 96.470) (Udaipura village) to design km 147.540 (existing Km 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity mode (Package-II)
Construction of 4lane GF Delhi-Katra Expressway from Junction with Jalandhar-Kapurthala road NH-703A near Khojewal village-Junction with Amritsar-Tanda road NH-503A near Sri Hargobindpur Km 319.400-362.420 on EPC under BMP in Punjab
Development, Operation and Maintenance of Wayside Amenities on Seoni-Mohgaon section of National Highway 44 on lease basis in Madhya Pradesh (DBOT-2 Sites)NH44/606-500/Nandour/RHS/Madhya Pradesh
ARC 2026-2028 for Day to Day Maintenance R n R of Furnishing Items Carpentering Items CP n Sanitary Items Plumbing Sewerage Services n Miscellaneous Civil Work at NHAI Residential Building B5 Sec-17 Dwarka ND-110078 other hired buildings in Delhi
Engagement of user fee agency through e-quotation for Lahpatra Toll Plaza at Design Km 205.200 for Rehabilitation and Up-gradation of NH-111 (New NH-130) to 2-Lane with Paved Shoulder in the State of Chhattisgarh
Engagement of user fee agency through E-Tender Ramgarh at Km 40.900 , Lanela at Km 102.151 on NH-68 and Parewar at Km 19.900 on NH-968 for the use of Construction Tanot Ramgarh-Bhadasar Jaisalmer in Rajasthan
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Construction of new 6 lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH 42) to Tangi near Bandalo Toll Palza (NH 16) (Km. 70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha
Reconstruction and Rehabilitation Bituminous Pavement Works and Incidental Works of Deoli-Kota Section of NH- 12 (New NH- 52) from Km. 165.00 to Talabgaon Junction (Design Km.167.624 to Km. 205.724) in the state of Rajasthan (Package-1)
RFP for providing Manpower Services to InvitConcessionaire for collection of User Fee at Chhapar FP of Muzaffarnagar to Haridwar section from Km. 130.560 to Km. 209.120 of Old NH 58 (New NH 334) in Uttar Pradesh and Uttarakhand
Four laning with paved shoulder of Madhavpur to Porbandar section of NH-8E (Ext.) old/NH-51(new) from km 338.400 (Design Chainage km 338.400) to km 379.100 (Design Chainage km 379.100) in Gujarat through on EPC mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
Widening and Rehabilitation of existing two lane to four lane road Champa-Korba-Katghora Section of NH 149B, from Design Chainage 0.000 to 38.200, (Pkg I) under NH(O) in the state of Chhattisgarh on Hybrid Annuity Mode.
Four-Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length 67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode
Engagement of user fee agency through e-quotation for Dharauli Madhupur toll plaza on NH-330 (old NH-96) at km 61.875 from Km.51.135 to Km.82.000 of Sultanpur Pratapgarh Section in the state of Uttar Pradesh
Engagement of user fee agency through E-Tender at Zidda fee plaza at km 267.488 from existing km 221.380 to km 287.215 on Faridkot Kotkapura Bathinda section of NH-15 (New NH-54) in the state of Punjab
Development, Operation and Maintenance of Wayside Amenities on Seoni-Mohgaon section of National Highway 44 on lease basis in Madhya Pradesh (DBOT-2 Sites)NH44/606-500/Nandour/LHS/Madhya Pradesh
Engagement of user fee agency through e-quotation for Eight Lane Delhi-Vadodara Expressway from km 0.000 to km 129.017 on NH NE-4 and Kiranj Fee Plaza Section of NH-148NA in the states of Haryana and Rajasthan
Consultancy Services for AE for Supervision of Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj-Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode
Engagement of user fee agency through E-Tender at Pokhraira fee plaza at km 54.350 for the section from km 1.300 to km 74.349 (Chappra-Rewaghat Muzaffarpur Section) of NH -722 (old NH-102) in the State of Bihar
Engagement of user fee agency on the basis of Vavadikhurd Fee Plaza at km 110.436 for 4 lanning of Ahemdabad- Godhara Section of NH-47(old NH-59) from km 4.200 to km 122.420 in the State of Gujarat
Engagement of user fee agency through e-quotation for Katiyara Fee Plaza at Km77.821 of Village-Katiyara District-Rohtas for the project four laning of Pararia-Mohania section of NH-319 (old NH-30) in the State of Bihar
Engagement of user fee agency through e-quotation for Hathitala Fee Plaza at km 175.680 for Barmer-Sanchor-Gujarat Border section of NH-15 (New NH-68) to Two-Four lane with paved shoulder in the State of Rajasthan