Loading…
Loading…
2,923 results • Best match
Construction of Four Lane Access Controlled Construction of Four lane access controlled Greenfield NH from Shivrampur (Ch. 55.002 Km) to Ramnagar (Ch. 109.324 km), at NH-119D under BMP in Bihar- (Amas Darbhanga PKG-II of 54.322Km) on HAM.
IE services for Construction/upgradation of two lanes with paved shoulders of NH-911 from Sriganganagar to Raisinghnagar Design Chainage -0.500 km to Design Chainage 101.000 km length 102.076 km) under NH (O) on HAM in Rajasthan (PKG-1)
Const. of 4L highway from Barabanki ch. Km 0.000 to Mustafabad ch. Km 43.030 Existing Ch. Km 0.000 to Ch. Km 43.700 on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme PKGI
Four laning with paved shoulder from Meerut to after bridge over river Yamuna Haryana via Shamli from km 0.000 to 88.476 of NH 709A 0 at Meerut on ch. 67.550 of NH 58 in the State of Uttar Pradesh
Improvement and Rectification Works at 5 Nos. of MoRTH-identified Black Spot Locations through long term measures on Lucknow Kanpur Section of Old NH-25 (New NH-27) (Km 27.700 to Km 75.500) in the State of Uttar Pradesh.
Engagement of user fee agency through E-Tender at Pokhraira fee plaza at km 54.350 for the section from km 1.300 to km 74.349 (Chappra Rewaghat Muzaffarpur Section) of NH -722 (old NH-102) in the State of Bihar
Four laning of existing 2-lane stretch from Bamni (Design km 19.000) to MH/TG Border (Design km 51.985) Design Length 32.985 km section of NH-930D in the State of Maharashtra on Hybrid Annuity Mode under NH(O)
Request for proposal (RFP) for Selection of Agency for setting up and operationalizing 24x7 NH Helpline 1033
Limited RFP Selection of System Integrator to Implement and Provide O and M Services of ETC and Refurbishment O and M services of Weigh in-Motion and Static Weigh Bridge System at Toll Plazas on National Highways 2nd Call
Independent Eng Services for Four Laning of Kamalapuram to Oddanchatram section of NH-209 New NH-8from Design Km 0.000to Km. 35.822 TL36.505 Bharatmala Pariyojana Phase-I under the category of Residual WorksofNHDP on HAM in the State of TamilNadu
Engagement of user fee agency through E-Tender at Kot-Karor Kalan fee plaza at km 205.000 from existing km 166.925 to km 221.380 on Harike Zira-Faridkot Section of NH-15 (New NH-54) in the state of Punjab
Engagement of user fee collection agency on the basis of EQ through E-Tender for Shahpur Kalyanpur FP at Km. 13.400 of Poanta Saheb Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand
Engagement of user fee collection agency on the basis of CB through E-Tender for Shahpur Kalyanpur Fee Plaza at Km.13.400 of Poanta Saheb-Ballupur Section of NH-7 (old NH-72) in the State of Himachal Pradesh and Uttarakhand
4 laning with paved shoulder from Meerut to after bridge over river Yamuna Haryana via Shamli from km 0.000 to 88.476 of NH 709A 0 at Meerut on ch. 67.550 of NH 58 in the State of Uttar Pradesh re-invitation
4-Laning of Existing 2-Laning Stretch from Dive ghat at Km 220.900 to Hadapsar at Km 234.150 (Pkg-6) on Mohol-Alandi section (Design Length 13.25 Km) of NH-965 in the State of Maharashtra on HAM under NH (O)
Const of Realignment of NH87 New NH109 Sec of Rudrapur Kathgodam Ch.0.000 (Exist Km 54.050 of NH 87 to Ch.7.875 Exis Km61.550 Of NH 87 due to proposed Expansion of Pantnagar Airport L7.875 Km in Uttarakhand in EPC Mode
4 Laning of Raghogarh (Design Ch. 29.300/Existing Ch. 29.555) to Nanasa (Design Ch. 92.971/Existing Ch. 95.000) Section of NH-47 (Old NH-59A) (Design Length 63.67 km) under BMP Phase I (Economic Corridor) in Madhya Pradesh on HAM basis
Construction of 4 Lanning of Badnawar-Petlawad Thandla-Timarwani section of (NH-752D) from Badnawar Bypass Ch.70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE-4) Ch.150.850 in the state of Madhya Pradesh on HAM under NH(O)
Construction of 8 Lane Carriageway start at interchange on NH-116 at village Mui and end at Hardevganj village near Indergarh(Ch.292.950- 319.400)section of Delhi-Vadodara Access Controlled Green field Alignment (NH-148N) under BM in Rajasthan on EPC
Four laning of existing 2-lane stretch from Govindpur (MH/TG Border) (Design km 32.910) to Rajura (Design km 89.090) Design Length 56.180 km section of NH-353B in the State of Maharashtra on Hybrid Annuity Mode under NH (O)
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km. 0.000 to Km. 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1)
Operation and Maintenance of Four laning of Mahulia-Bharagora-JH-WB Border Section of NH-33 (from Km.277.500-Km.333.500) and NH-49 (from Km.199.200-Km.183.587) (Total length 71.61 km.) on PBMC in the State of Jharkhand
IE services for Construction of 4 L of Badnawar Petlawad Thandla Timarwani section of (NH 752D) from Badnawar Bypass Ch. 70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE 4) Ch. 150.850 in Madhya Pradesh on HAM under NH(O)
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
Four Laning of NH 530B from Gaju Village (Design km 32.982 Mathura-Aligarh District Boundary) to Devinagar Bypass(Existing Km.208.000 of SH 33(NH-530B)-(Design Km.66.000)(Design length 33.018 km) in Uttar Pradesh on HAM mode (Package-1C)
Improvement and Routine maintenance of Lakhanpur-Jammu section including Jammu Bypass from Km 16.350 to Km 97.20 and Km 0.00 to 15.00 of Jammu Bypass of NH-44 (old NH-1A) in the UT of Jammu and Kashmir (4th Call)
Lehrabega fee plaza at existing km 191.929 (design chainage km 199.097) form existing km 168.000 to km 209.405 on Tapa to Bathinda section of NH-64 (new NH-07) under NHDP-IV on EPC basis in the State of Punjab
Collection of user fee through the agency selected on competitive bidding basis at Dhoki Fee Plaza at km 178.100 for End of Ane Ghat to Start of Ahmednagar Section of NH-222 (New NH-61) of two Lane section in Maharashtra
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
Construction of New Six Lane Major Bridge including Approaches from Km.172.895 to Km.173.670 of NH-215 (New NH -520) in Rimuli- Koida Section in the State of Odisha under NHDP Phase III on Engineering, Procurement and Construction (EPC) Mode
Rehabilitation and Upgradation from 2 lane to 4 lane of NH stretch under Bharatmala Pariyojana for Unnao-Lalganj section of NH-232A on Hybrid Annuity Mode in the State of Uttar Pradesh and Design chainage Km 0-000 to 70.000
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Gobindpur (NH 55) to Tangi from Km. 70.995 to Km. 111.325 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 3)
Construction of balance work of Widening and strengthening for improvement and up-Gradation of NH-709A Garhmukteshwar chainage- 83.200 of NH24 to Meerut (chainage 9.860 of NH235) including connector to Nh-119 Package XII in Uttar Pradesh on EPC Mode.
Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Rajpur) at Km 52.000 (design) to Gojariya at Km 128.940 (design), a length of 76.940 km (PKG II) of NH-68 in Gujarat under NH(O) on EPC Mode
Improvement and Upgradation of Existing 2-Lane Bypass to 6-Laning from Km. 403.100 (Design Ch. 402.600)-Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in Karnataka to be executed on EPC Mode
Construction of 6 L ACH from Junction with Sec-62/65 dividing road on Faridabad-Ballabhgarh Bypass to Junction near KMP Expressway with NH-148N Delhi-Vadodara Exp Section of NH-148NA Des Ch 33.00 to 59.063 in state of Haryana
Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode
Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode
Construction of Balance Work of Two laning with paved shoulders of Sitarganj Bareilly section of NH-74 New NH 30 from Km. 254.820 to Km. 329.280 in the State of UP Uttarakhand on PERCENTAGE RATE Mode under NHDP Phase-IV
Four laning of Nanasa to Pidgaon section of NH-47 Old NH-59A Indore Harda Pkg III L 47.445 km Design Ch. 95.00 Km to 142.445 km under BMP Ph-I Economic Corridor in the State of Madhya Pradesh on HAM.
CS for IE Services for Construction of 6lane access-controlled Spur connectivity starting from Ch. 15.100 of Ambala Chandigarh section of NH-205A and terminating at Ch. 2.500 of Zirakpur Bypass (TL 10.300 Km) under NH(O) in Punjab on HAM)
Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch.17.200 (existing km 17.200) to Ch.56.200 (existing Km 57.200) (Total length 39.00km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna
Engagement of user fee agency through e-quotation for Kharpada FP at Km.15.000 of NH-66 of Village Karnala/Tara, District- Raigad for the project of Balance work of Four Laning of Panvel-Indapur Section of NH 66 in Maharashtra
OnM of DG Sets Electric Equipment and Electrical Installation UPS system Extra LV System Heating Ventilation and AC (HVAC) Fire Protection Works RO Plant WTP/Systems STP etc at NHAI HQ Office Buildings at G 3 5n6 Sec10 Dwarka Camp office at Patel Cho
O and CM of DG Sets Electrical Equipments Electrical Installation UPS system ELVS HV and AC(HVAC)FPW RO Plant WTP/STP Cleaning of Glass Curtain MLCPS and Maintenance of Landscape/Horticulture Works at NHAI HQ G3 G5 and 6 Sector10 Dwarka 2nd Call
AR and MO various roads under division South West Road-I during 2026-27. (SH Improvement and maintenance of NH-8 (From Dhaula Kuan to NHAI Wall) in view of Indo African Summit under Sub Division-II New Delhi).
Engagement of user fee agency through E-Tender at Bajheri FP at Km. 19.425 for the project Greenfield alignment IT City Chowk to Kurali from kilometer 0.000 to km 22.080 of NH 205A and part of NH-205 from km 22.080 in Punjab
CS for IE for (i) Construction of 6laning from Naidupeta-Turpu Kanupur KM57.046-KM91.930. and (ii) 4Laning of Chillakuru Cross Road to Turpu Kanupur Km0.0-Km23.770 on NH-16 and 6Laning of Km23.770-Km35.015 on New NH-516W in AP on HAM