Loading…
Loading…
2,923 results • Best match
Engagement of user fee agency through EQ for Karanja Bahiram Fee Plaza at NH-548C for the project of rehabilitation up-gradation of Anjangaon to MP Border developed to 2 lanes with paved shoulders of NH-548C in the state of Maharashtra
Engagement of user fee agency through E-Tender at Jharoti Fee Plaza at km 30.800 design KM 118.46 of Bhiwani-mandola Section of NH 148B in the state of UP Haryana border to Rohna section NH-334B in the state of Haryana
Engagement of user fee agency through e-quotation for Aindhi Distt. Amethi Fee Plaza at km 112.850 to km 113.350 for the section of two laning of Tanda-Raebareli Section of NH-128 (old NH-232) in the state of Uttar Pradesh
Engagement of user fee collection agency on the basis of Competitive Bidding at Gangarampalayam fee plaza at Km 18.500 of Viluppuram to Puducherry Section from Km 0.000 to Km 29.000 of NH-45A (NH-332) in the State of Tamil Nadu and UT
Engagement of user fee agency through E-Tender at Bor Charnan FP at km 238.800 for Barmer Sanchor Gujarat Border section of NH-15 (New NH-68) to Two/Four lane with paved shoulder from Km 153.00 to Km 259.300 in Rajasthan
Engagement of user fee agency through e-quotation for Aindhi Distt. Amethi Fee Plaza at km 112.850 to km 113.350 for the section of two laning of Tanda-Raebareli Section of NH-128 (old NH-232) in the state of Uttar Pradesh
Engagement of user fee collection agency on the basis of EQ through e-tender at Panihaar fee plaza at km 136.000 for four laning of Gwalior Shivpuri Section from km 15.600 of NH-75 to km 236.000 of NH-3 in Madhya Pradesh
Engagement of user fee collection agency on the basis of competitive bidding through e-tender at Sukhuapada Fee Plaza (Length 32.8 km) at km 12.900 from Balasore to Baripada to Jharpokharia section0 of NH-18 (Old NH-5) in the State of Odisha
IE services for supervision Construction of New 4Lane with Paved Shoulder from Dareota Village-Kalar Bala Village of NH-205 Chainage Km.33.175-Km41.000 TL 7.825Km including twin tube tunnel PKG-IIB in Himachal Pradesh under NH(O) on HAM 2nd call
Consultancy Services for AE for SC of 8Lane access-controlled expressway starting near Junction with NH-12 Ummedpura to Major Bridge over Takli River (Ch.419.000-427.300)section of Delhi-Vadodara GFA NH-148N under BMP in the state of Rajasthan on E
Const of 4/6 Lane Highway of Southern Bareilly Bypass (L29.920km)starting at Ch.237.000 of NH 530 near Jhumka chauraha Dhantiya vill and ending at Ch267.000 of NH 30 near Invertis University inc Trumpet Interchange on HAM basis in the Uttar Pradesh
Cons. of Slip/Service road at various locations (25.140 Km (LHS-RHS) Flyover (2x25m) at Borivali Jun. (Km. 528.550) and LVUP (1x15m) at Sherekarpada (528.800)on PimpriSado-Vadape sec. of NH-848 from 460.900 to Km. 537.000 in Maharashtra on EPC NH(O)
Rehabilitation and Upgrading of Existing 2lane to 4lane from Jwalamukhi Bypass to Kangra Bypass of NH 88 up to Intersection with NH154 (Design Chainage -Km 157.000 to Km 193.407) in the State of Himachal Pradesh under NH(O) on HAM Mode Package-V
Upgradation of port connectivity NH configuration from existing 2-lane-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of AP on EPC Mode under BMP
Construction of 4 Lane highway from Mustfabad Design chainage Km 43.030 to Biswariya Design chainage Km 101.515 (Existing Chainage Km 43.700 to Chainage Km 98.475) on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme (Package-II)
Development of 6lane of access-controlled Agra-Gwalior GF highway starting from km0.000-km88.400 Deori-Susera in the state of UP-Raj.-MP including the overlay strengthening and improvement works on from 1058.00-1148.00 of NH-44 on DBFOT BOT Mode NH(O
Construction of New 4 Lane with Paved Shoulder from Dareota Village to Kalar Bala Village of NH-205 (Design Chainage Km.33.175 to Km 41.000 Design Length 7.825 Km) including twin tube tunnel PackageIIB in Himachal Pradesh under NH (O) on HAM
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
4 laning of Meerut-Nazibabad section from Km 11.500 to Km 39.240 and from Km 86.590 to Km 112.545 (Design Length 53.950 Km) of NH-119 (New NH-34) in the state of Uttar Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode
Consultancy Services for preparation of DPR for widening and upgradation of Ambedkar Nagar to Raebareli section of NH 128 from DC Km 0.00 to Km 148.980 and Ayodhya Prayagraj Section from Ch. Km 82.000 to Km 95.100 of NH 330 in Uttar Pradesh
CS for AE for Const. of EC for Gammon Junc. at Km.903.265 BS ID No.AP-05-092 and Diwancheruvu junc. at Km. 902.308 BS ID No. AP 03 299 on NH-16 in Andhra Pradesh under NH(O) on EPC mode
Construction of service road on both side of 4-lane Varanasi bypass from Km 0.00 (starting point at Km 271.300 of NH-56) to Km 15.250 (end point at Km 11.170 of NH-29) in the state of Uttar Pradesh on EPC mode
Engagement of Safety CS during OM of (i)6-laning Strengthening of NH-248A Km2.740 Rajiv Chowk-Km11.682 in Gurugram (Package-I)(ii)from km11.682-24.536 Package-II(iii)Delhi-Gurgaon of NH-48 and other works project highway km11.060-42.00 in Haryana
Rehabilitation and Up-Gradation to 4 Lane Configuration and Strengthening of Punjab/HP Border to Sihuni Section from Km 11.00 to Km 51.00 (Design Length 37.030 Km)of NH-20of Pathankot Mandi Section under NH (O) in HPon HAM basis (Package-I)
Construction of 8 Lane Carriageway start near Junction with MDR-1 to end of interchange on NH-166 near village Mui (Ch. 247.310 TO 292.950) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under BM in Rajasthan on EPC
Construction of new 4 lane Access controlled Highway from Cuttack (end point of CRRR at NH 16 near Tangi) to Kandarpur on SH 12 from Design Ch. 0.000 km to 21.225 under NH(O) on Hybrid Annuity Mode in the state of Odisha
6 laning with service road on both sides of Ayodhya Bypass section of NH 46 from design km 0.000 near Ashram Tiraha to design km 16.500 at Ratnagiri Tiraha (Design Length 16.500 km) under NH (O) in Madhya Pradesh on Hybrid Annuity Mode
Construction of New Service Road and under passes at various locations on Rewa Katni Jabalpur Km 813.257-Km 880.600 (Pkg-4) and Improvement works at Jabalpur Lakhnadon (Km880.600-Km891.780) of NH-30 and (1358.000-Km1428.557) of NH-34 in MP on EPC
BALANCE WORK OF SIX LANING OF SHAMLAJI-MOTACHILODA FROM KM. 401.200 TO KM.494.410 SECTION (DESIGN CHAINAGE KM.447.385 TO KM. 540.595 LENGTH - 93.210 KM) OF OLD NH-8 (NH-48) IN THE STATE OF GUJARAT ON SINGLE PERCENTAGE ITEM RATE CONTRACT.
Engagement of user fee agency through E-Tender at Ramnagar Gansiyari Fee Plaza at km 118.400 on Pratapgarh to Allahabad Bypass Road Junction Section of NH-96(New NH-330) from km 100.800 to km 135.200 in the State of Uttar Pradesh
Engagement of user fee agency through E-Tender at Nawabganj Fee Plaza at km 39.000 for the use of four lane of Kanpur-Lucknow section from km.11.005 to km.75.500 of NH-25 (new NH-27) in the state of Uttar Pradesh
Engagement of user fee agency through e-quotation for Sonari Fee Plaza (MoRTH Toll Plaza) at Km.22.150 of NH-161A for the project up-gradation of Nanded-Kinwat-Mahur-Arni of NH-161A to Two lane with paved shoulders in Maharashtra
SITC of 02 no of Water Cooled Screw Type Chiller of 240 TR having double compressor n 01 n 350Kw Hot Water Generator with all related accessories civil works including buyback at NHAI G 5 n 6 and G 3 sector 10 Dwarka New Delhi 110075
Major Maintenance of Chennai Bypass (NH-32) from km 0.000 to km 32.600 in the State of Tamil Nadu
Engagement of user fee collection agency for Ferozshah Fee Plaza at km 183.730 for four laning of existing two lanes with paved shoulder road from Talwandi Bhai to Ferozepur NH-5 (Old NH-95) from Km 170.380 to Km 194.040 in the state of Punjab
Engagement of user fee agency through e-quotation for Akshda Fee Plaza at km 108.025 on NH-233 for the section from Km. 65.870 to Km. 122.270 of two laning of Rudhauli to Basti side approach of Ghaghra Bridge of NH-128in Uttar Pradesh
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Akshda Fee Plaza at km 108.025 on NH-233 for the section of two laning of Rudhauli to Basti side approach of Ghaghra Bridge of NH-128 in UP
Independent Engineer Services for Construction of Four Laning of Raghogarh (Ch.29.300 Existing Ch.29.555) to Nanasa (Ch.92.811 Existing Ch.95.000) Section of NH-47 (Old NH-59A) (Design Length 63.511 km) under BMP Phase-I EC in the State of MP on HAM
Operation and Maintenance estimate of Punjab/Haryana Border Jind section of NH 52/352 (Old NH 71) from Km 238.695 to Km 292.712 and Km 0.000 to Km 16.191 (Total Length 70.178 km) in Haryana for a period of 5 years on (PBMC) mode
Improvement Augmentation of Two lane with Paved Shoulders from Km 1.600 to Km 16.690 and Km.29.850 to Km.80.133 of Nagapattinam Thanjavur Section of NH 67 Old New NH-83 Total Design Length 65.373 Km in the State of Tamil Nadu on EPC Mode
Construction of 4 by 6 lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE 5 near to Manewal Ludhiana to junction with NH 205 near Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg-1 Section
Constru. O-M of public toilets units refreshment kiosk water ATM (Mini Nest) along with maintenance and operation of FOBs with ramps Subway on DBFOT Mode on Ashram-Badarpur Elevated Delhi Agra NH-44 and DND-KMP Exprs.(NH-148NA) in Delhi and Haryana
4-laning of Bilaspur-Urga section of NH-130A from design Ch 0.00 to Ch. 70.200 From NH-49 near Dheka Village to Bhaisma Village under Bharatmala Pariyojna Lot 3 Chhattisgarh Pkg-I Raipur-Dhanbad Economic Corridor in the State of Chhattisgarh on HAM
CS for AE for Supervision of Cons.of new Slip/Service road on at various locations (TL 30.28 km (LHS.RHS) and Flyover (2x30m) at Sawadgaon Phata (310.380) on Dhule-Pimpalgaon sec. of NH-60 from 261.720 to Km. 380.000 in Maharashtra on EPC NH(O)
Operations and Maintenance of 2-lane with paved shoulders of stretch from from km. 615.000-km.668.600 for a length of 53.60 kms of Kalyan-Nirmal section of NH-222 (New NH-61) in the state of Telangana on Performance Based Maintenance Contracts (PBMC)
IE for 2L with PS from Myajlar Jaisalmer from 0.000 to 98.350 Section of NH11 Sundra Myajlar Ambasingh ki Dhani Road from 46.000 to 81.601 part of Munabao Tanot of existing connection of NH 70 NH11 in Rajasthan NH(O) on HAM (2nd Call)
Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call
Independent Engineer Services for Construction of new four-lane Access controlled Highway from Cuttack (end point of CRRR at NH-16 near Tangi) to Kandarpur on SH-12 from Design Ch. 0.000 km to 21.225 under NH(O) on HAM in the state of Odisha
Four laning of existing 2-lane road of Amritsar-Ghoman-Tanda-Una Section of NH-503A from Design Chainage Km 8.270 to Design Chainage Km 54.000 (design length 45.73 Km) in the State of Punjab on Hybrid Annuity Mode (Package-I) under NH-(O)
Six Laning of Thalapady to Chengala section of NH-17 New NH-66 from Ch. 17.200 existing km 17.200 to Ch. 56.200 existing Km 57.200 Total length 39.00km in the State of Kerala on HAM under BMP in the category of residual works under NHDP