Loading…
Loading…
2,121 results • Best match
Engagement of user fee agency through e-tender at Amipur Baleni Fee Plaza at km 19.355 on Merrut to Haryana Border via Baghpat Section of NH334(B) in the State of Uttar Pradesh
Engagement of user fee agency on the basis of CB through etender for Makrauli Kalan at Km 9.80 Rohtak Panipat Section km.0.00(km.63.300 of NH10) to Km.80.858(km.83.500 of NH1)NH71A in Haryana
Engagement of user fee agency on the basis of EQ through etender for Shahjahanpur fee plaza in the State of Haryana and Rajasthan and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through EQ at TP-01 at 16MKS/3NGR at Km. 219.167, TP-02 at 14SSW at Km. 237.797 and TP03 at 29NDR/31NDR at Km. 256.084 Amritsar Jamnagar Economic corridor in Haryana and Rajasthan
Engagement of user fee agency through e-quotation for six Lanning of Mandi Dabwali (Punjab/Haryana Border) - Chautala Road Section from Proposed Mandi Dabwali Bypass in Haryana and Punjab
Engagement of user fee agency through E-Tender at Milk Majra Fee Plaza at Km 98.750 on UP/Haryana Border-Yamunanagar-Panchkula Section from Design Km 70.830 to Km 176.400 in the state of Haryana
Engagement of user fee agency on the basis of through etender for Thana FP at km 68.680 on Ambala Kaithal (Pehowa to Kaithal)Sec of NH65 in Haryana
Engagement of user fee agency through E-Tender at Paind fee plaza at km 227.500 for the section from Sangrur to DogalKalan N DogalKalan to Punjab Haryana Border in Punjab
Engagement of user fee agency through EQ on (8 Nos/11 Nos) fee plazas (07 no fee plazas in the State of Haryana and 04 no fee plaza in the State of Punjab) for project Four-Lane Greenfield Delhi-Amritsar-Katra Expressway (NE-5) on HAM
Engagement of user fee agency through EQ for Bawani Khera in the State of Haryana and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee agency on the basis of EQ through etender for TP 01 TP 02 and TP 03 as a part of Amritsar Jamnagar EC in the state of Haryana and Rajasthan and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable i
Engagement of user fee agency through e-quotation for Mundka Fee Plaza at km 22.750 for the project Development of UER-II in the State of Delhi and Haryana
Engagement of user fee agency through EQ for six Lanning of Mandi Dabwali Punjab Haryana Border Chautala Road Section in Haryana and Punjab
Engagement of user fee agency through EQ for Daulatpura FP at Km 241.00 on NH08 Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 in Haryana and Rajasthan
Engagement of user fee agency through ETender at Mohana Toll Plaza at Km 58.035 for the project Four laning of Gohana Sonepat section in the State of Haryana
Engagement of user fee agency through EQ on (8 Nos/11 Nos) fee plazas (07 no fee plazas in the State of Haryana and 04 no fee plaza in the State of Punjab) for project Four-Lane Greenfield Delhi-Amritsar-Katra Expressway (NE-5) on Hybrid Annuity mode
Engagement of user fee agency through e-quotation for six Lanning of Mandi Dabwali (Punjab/Haryana Border) Chautala Road Section from Proposed Mandi Dabwali Bypass (Design CH. 27.00) to Chautala in the state of Haryana and Punjab
Engagement of user fee agency through EQ for Bijwasan FP at Km 9.045 of NH248BB Dwarka Expressway and Kherki Daula Plaza of NH48 at Delhi Gurgaon section NH08 Delhi n Haryana
Const. of a Load Bearing precast box drain measuring 2x2 meters in length of 4350 km along the Badarpur Elevated Highway in Delhi and Haryana on item rate basis
IE services for Supervision of Construction of greenfield connectivity to Jewar International Airport from DND Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under BMP in UP and Haryana
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON TRANS HARYANA CORRIDOR FOR BUNDLE AK1 TO AK3 IN AMBALA-KOTPUTLI SECTION ON LEASE BASIS
Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.
Engagement of user fee collection agency on the basis of CB through etender for Tamsabad Fee Plaza in the State of Haryana and Uttar Pradesh
Rehab and strength. along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.212.000 near Ghaggar User FP to Km. 272.000 near Khanna in Punjab on Item Rate Percentage basis
Development Operation and Maintenance of Ropeway to Dhosi Hill in District Mahendragarh in the State of Haryana on Hybrid Annuity Mode
CS of AE for Upgrad of existing 4lane Ismailabad-Ambala sec of NH152(Km.0.000 to Km42.500)(Part of Ambala Kotputli Corridor)to 4lane access controlled stretch by providing grade separated structures and service/Slip roads under BMPI in Haryana on EPC
Engagement of Safety CS during OandM NarnaulBypass Crossing to Paniyala MorNH148Band NarnaulBypass Crossing toPacheriKalan NH11Pkg1 Narnaul Bypass and AteliMandi to Narnaul Pkg2 RewariAteliMandi PKG3 RewariBypass NH11as Feeder Route in Rewari PKG4
Authority Engineer for Supervision of balance Work for Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH71 and connecting link from Km 347.800 of NH71 to Km 9.400 of NH71A on EPC Mode under Bharatmala(left out in NHDP)in Haryana
Engagement of Safety CS during O and M of 6L Access Controlled GFH NH152D starting from Ismailabad(Gangheri) on NH152D to Narnual(0.000 to 227.20 L-227.20Km) for Pkg1 to Pkg8 on EPC mode under BMP in Haryana.
CS for AE for Supervision of Development of Memmadpur Ambala Banur IT City Chowk Kharar Chandigarh Corridor under BMP Pkg-II 6 laning of IT City Chowk to Kurali Chandigarh Road Design length 31.23 Km in Punjab on EPC mode
IE for supervise of OnM of 6L AC Highway from Jn with Jaitpur Pushta Rd to Jn KMP Expway with NH148 N Delhi Vadodara Expway Sec of NH148NA 9.000 to 59.000 spur from 13.200 to Jn of Faridabad Ballabgarh Bypass with NH19 Badarpur Border in HR BMP
Engagement of user fee collection agency on the basis of CB through for Bhavdeen FP At Km 241.920(existing chainage at km 240.00) of Hisar Dabwali Sec(PkgII)on NH9 (Old NH10) in Haryana
6Laning of Mandi Dabwali (Punjab/Haryana border) Chautala road section from Proposed Mandi Dabwali Bypass (Design Ch. 27.400) to Chautala (Design Ch. 62.200) of NH54 under BP (designed length 34.800) in Haryana under Hybrid Annuity Mode
Engagement of user fee collection agency on the basis of CB through for Ramayana FP at km 161.500 Four Laning of Rohtak to Hisar section of NH10 to be executed as BOT Toll Project on DBFOT Pattern under NHDP Phase III in Haryana
Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jind-Panipat road NH352A near Gangana village to Junction with Jind Karnal road NH709A near Alewa village (Km 60.800 to Km 91.400) on HAM under BP in Haryana
Engagement of user fee agency on the basis of CB through etender for Landhari Fee Plaza in the state of Haryana
Development of Memmadpur (Ambala) - Banur (IT City Chowk) - Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode
Construction of Foot Over Bridges on Km21.500(Design Ch21.500 PKGI) Km29.500(Design Ch29.500 PKGI) on NH148B and Km17.500(Design Ch3.100 PKGIII) Km58.600(Design Ch44.200 PKGII) on NH11 in Haryana on EPC mode.
Strengthening and Major Maintenance of the Rohtak Hisar Sec of NH09 From Km. 93.140 to 182.500 and Link road 09.450 Km total length 98.810 Km in Haryana on PBMC mode
IE services for Development of Memmadpur Ambala-Banur IT City Chowk-Kharar Chandigarh Corridor under BMP-Pkg1-6 laning of Ambala-Chandigarh GF with spur to Lalru 4 lane and spur to PR-7 road in Punjab on Hybrid Annuity Mode Total Length 41.985
CS of AE for Supervision of Const/Widening of Struc MJB MNB ROB LVUP etc rectification of drainage and rain cuts and other works and O and M of remaining stretch of Panipat-Jalandhar sec of NH44 Km 96.000 to Km.387.100 in Haryana and Punjab on EPC
Engagement of Safety Consultant Services for Construction of Greenfield connectivity to Jewar International Airport from DND-Faridabad-Ballabgarh Bypass KMP Link-Spur to Delhi Mumbai Expressway on HAM under BMP in the state of Haryana and UP
Rehabilitation and strengthening along with integrated routine maintenance incl. IM of 4 n 6 laning of Delhi Haryana Border to Rohtak sec of NH9 Km29.650 to Km93.140 include Bahadurgarh n Rohtak Bypasses in Haryana on Item Rate Percentage basis
IE services for Supervision of Construction of 4lane Greenfield Delhi Amritsar Katra Expressway from Junction with KMP Expressway near Jussur Kheri to Junction with Jind Panipat road NH352A near Gangana (Km 0 to Km 60.800) on HAM under BP in Haryana
SPUR of Panipat Shamli NH709AD bypassing Shamli town and connecting NH709A in the State of Uttar Pradesh.
Engagement of user fee collection agency on the basis of e-quotation through open bidding for Milk Majra Fee Plaza at Km 98.750 on UP Haryana Border Yamunanagar Panchkula Section from Design Km 70.830 to Km 176.400 in the state of Haryana.
Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Rohtak Panipat road (NH709) near Rukhi Paani village to Junction with Jind Panipat road (NH352A)near Gangana (Km 34.000 to Km 60.800) on HAM under BP in Haryana
Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode
Strengthening or Overlaying on Six lane Gurgaon Kotputli Jaipur section of NH48 Old NH8 from Km 107.100 to Km 273.000 in the State of Rajasthan at the Risk and Cost of Concessionaire on item rate percentage basis.
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode