Loading…
Loading…
1,574 results • Best match
Construction of link road from NH-205 to village Kattal Bagheri Km. 0/0 to 2/015 (SH- Construction of 900mm dia hume pipe culverts at RD 0/120, 0/285, 0/525, 0/810, 0/870, 1/319, 1/750 and 1/795 and C/o of 6.00 meter span RCC Slab culvert at RD 0/69
C/o link road from NH-205 to village Mehrog in GP Kothipura Distt Bilaspur Km 0/0 to 1/180 (SH-F/C i/c R/ wall, CD, GSB, M/T Tarring,Road side drain,parapets and Km stone etc in Km 0/0 to 1/180 including five year maintenance plan)under NABARD-XXVIII
Restoration of rain damages on NH 503 Extn Km. 0/0 to 44/700 (SH Construction of R/wall at RD 19/130 to19/150(RHS),35/270 to 35/280 (LHS),35/400 to 35/422 (RHS) and C/O U shape drain at RD 35/270 to 35/300 (LHS) in the state of HP
Construction of link road from (NH-205) Gara to Mauru km 0/00 to 2/00 ( SH-C/O ROFD in km 0/00 to 1/075 and C/O R/wall at RDs 0/102 to 0/132 and C/o 900 mm dia Hume pipe culverts at RDs 0/480, 0/585, 0/650 and 1/075)
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH- Construction of wire crate B/wall at RD 301/060 to 301/125 and C/o B/wall in wire crate over PCC existing B/wall at RD 301/125 to 301/135, 301/140 to 301/155 and 301/170 to 301/210).
C/o of Exist road from HRTC Bus Stand Ghumarwin approach road from Bus stand to Seer Khad Bridge on NH-103 km 0/00 to 0/300 SH C/o 600 mm dia Hume pipe culvert at Rd 0/210, C/o U-shape Drain,Steel work for Railing work, Providing and laying paver blo
Special Repair of left out portion from NH 03 near Volvo station to Bhotnath Junction via bus stand Manali
SH CO RCC culvert from new NH road to river Beas and toe wall under and above culvert SDMF
C/O side walk along the kuhal and raising of kuhal side slope at village Bhattun near NH Crossing
Construction of rain shelter at RD 0/090)
Construction of Flush/solid causeway at RD 0/0 to 0/035 OTMNP
P/L Cement concrete pavement from RD 0/0 to 0/200) OTNP
Construction of 3.00 mtr span RCC slab culvert with approach wall at RD 0/305 ) ( UNDER MMGSY )
Providing and fixing 100X100X60 MM cobble stone block
SH Construction of B.wall and Wire crate at RD 28.965 to 28.985
C/O R/wall at Rd 0/890 to 0/920 and Down Drain Bed at RD 0/050 to 0/110 and 0/480 to 0/510
Providing fire alarm and fire fighting system there of
Providing laying G III and repair to Pot Holes in front of Army Gate
Jeepable Ambulance road SH Construction of Retaining wall and RCC WMM and Premix carpet at various RDs
C/O Protection work, P/L Metalling and Tarring, C/O Hume Pipe culvert with channelization,C/O V-shape drain,P/erecting W-metal beam crash barrier and road furniture etc.at RDs 124 plus 650).
Repair of 2 Nos culverts and 1 No bridge in Km 0/00 to 7/165 and C/O R/wall at Rd 1/910 to 1/925) (under PDNA Head)
Providing 1 No 8 Passenger elevator therein
C/o RCC Box Cell culvert at RD 186/660 to 186/670.
Providing and Laying interlocking paver block RDs 0/172 to 0/466, side drain protection wall and edging at Different RDs) DMFT
Formation cutting Rwall Bwall and CD work
Periodical renewal with 50 mm DGBM and 40 mm BC road furniture and road marking etc
( SH PL Tarring from NH 505 to ADC office Kaza, and petrol Pump to Jangchuk Guest House Kaza )( Under MMGSY).
AR and MO on left out portion NH 03 near Bolvo station to Bhoot Nath Junction via bus stand Manali
Monthly Basis Cab & Taxi Hiring Services - SUV; 3500; Outstation 24*7
SH Providing and layhing GSB RCCP and Side edging at various RDs
C/O Interlocking concrete paver at KM. 150/190 to 450 and V-Shape drain km. 150/300 to 355
SH C/O C.C. Retaining wall at RD. 0/010 to 0/110 approach road and parking ).
C/O PCC R/Wall at Rd 0/092 to 0/105 0/140 to 0/160 and B/Wall at Rd 0/720 to 0/735
SH Providing and laying GSB WMM BC Retaining wall and drains at RD 0/0 to 0/750
SH Providing and laying BC in various stretches between km 38.360 to 38.790
P/L Kharanja stone soling at various Rds in Km 0/00 to 4/600
Reconstruction of B/Wall and wire crate
Construction of R/wall at RDs 0/135 to 0/155, 0/485 to 0/505 ,0/735 to 0/750 , 2/975 to 2/990 and C/O B/wall at Rds 0/315 to 0/345, 4/395 to 4/415
(SH- C/o F/C in Km. 0/630 to 1/045, C/o R/wall at RDs 0/630 t0 0/640, 0/660 to 0/670, 0/675 to 0/690 and 0/720 to 0/735, C/o 900mm dia hume pipe culvert in Km. 0/630 to 1/045, C/o V-shape drain in Km. 0/630 to 1/045, C/o Paraepts in Km. 0/630 to 1/0
Providing and Laying Interlocking Paver Block at RDs 0/00 to 0/172) DMFT Deposit.
SH F.C in Km. 0.000 to 0.292
SH C.o PCC R.wall at RD 151.225 to 151.255
C/O PCC R/Wall at Rd.0/220to 0/280 and P/L Kharanja Stone Soling at RD 0/030 to 0/075 0/120 to 0/210 and 0/300 to 0/735
Repair of Pot holes and Patch work in damage portion at km. 18 to 20 in various RD s. Using with paver
P/L CC pavement at RD 0/400 to 0/600)OTMNP
SH Providing and laying BC in various stretches between km 36.620 to 37.950
Construction of Hume pipe culvert in place of damaged slab culvert at RD 64.800
SH F.C work in 5.7 mtr. wide road at Km. 0.292 to 0.411
SH C.O CC pavement road, C.O R.wall, B.wall, V and U shape drain RCC slab culvert, Barbed wire fancying and M.T works
SH- P/L of Interlocking Concrete Block Pavements at RD. 174/435 to 174 /900 ( L.H.S) , And 174/430 to 174/615 and 178/020 to 178/080)R.H.S .