Loading…
Loading…
1,574 results • Best match
Ordinary repair to NH-907A on Nahan Do Sarka Banethi Sarahan Kumarhatti road on Km 0/00 to 78/00 (SH Construction of PCC B/wall between Km 68/100 to 68/180 Km 74/106 to 74/166 and R/wall between Km 77/550 to 77/560)
Special Repair on NH 05 Km 254 to 368 excluding Km 284 to 329 SH Restoration to Mettaling and Tarring work C o R Wall in PCC C o R wall and B wall in wire crate and Reconstruction of damaged W metal beam crash barrier in various reach
Improvement of Stretches Junctions and Providing Road Safety measures on NH 503 Extn at following locations i Pakka Paroh Km 2 900 to 3700 ii Baduhi near Dussara Km 13 750 to 14 150 iii Kuthiyari Km 4 908 to 6 677 iv Diara Km 14 150to 15 665
Restoration of rain damages on NH-20A Km39/00 to91/00 (SH Extension of culvert atRD 64/125 channelized at Nallah portion andU-Shape drain with cover slab at RD 64/140to 64/440 (LHS) for the year 2019-20 in the State of HP under FDR(New).
Construction of road from Kishanpura to Santoshgarh upto NH-72 Puruwala km 0/0 to 3/800 in Tehsil Paonta Sahib Distt. Sirmour H.P. (SH-C/O embankment, P/L C.C.1,3,6 in edge walls, GSB and wet mix macadam, RD 3/420 to 3/800) Under MNP.
Periodical renewal on link road to village Misserwala from NH-07 km. 0/0 to 1/0. (SH- Repair of pot holes with Penetration Macadam and 30mm bituminous concrete in km. 0/0 to 0/990 and C/O road side V-shape drain in various RDs). Under AMP.
Up-Grad of Kulani Chandpur Bharmat Colony Kamakhya Mandir NH Holta Simblu Patti Km 0/00 to 9/300 (SH- Imp. of road, P/Places, R/Walls, B/walls, C.D Work, GSB, WBM-II, WBM-III, Tarring, CC Pavement, drain, parapets and road furniture i/c 5 years r.m.)
Restoration of rain damage on NH-05 Km 236/00 to 368/00 (S.H. Improvement of curve at RD 280/580 to 280/730, PCC R/wall at RD 280/615 to 280/635 and M/T works in Km 280/580 to 280/730) under FDR 2023-24.
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/00 to 78/00 (SH Hiring of excavator cum loader and Tractor with Hydraulic system trolly for Removal of slips in Km 40/00 to 78/00 for ensuing monsoon season in 2023-24)
Restoration of rain damages on NH-70 (SH-Pot holes/ patch repair with Bitumenous course (BC) in selected reaches between Km. 148/825 to 160/450 for the year 2019-20 in the State of Himachal Pradesh under FDR (New) (Job No. RO-HP-70-2019-20-019)
Restoration of rain damages on NH-305 Km. Sainj- Luhri- Aut road Km. 0/00 to 53/00 (SH. Construction of wire crate R/wall and B/wall in between Km 47/920 to 48/060, Construction of V-shape drain at Km 47/900 to 48/240).
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/00 to 78/00 (SH Hiring of excavator cum loader and Tractor with Hydraulic system trolly for Removal of slips in Km 0/00 to 40/00 for ensuing monsoon season in 2023-24)
Restoration to Rain Damages on NH-305 Sainj-Luhri-Aut Road Km 1.00 to 49.00 and Km 67.00 to 76.00 in the State of Himachal Pradesh SH Patch work by PL GSB, WMM, DBM and BC at various reaches Between Km 1.00 to 76.00 under FDR 2025-26
Restoration of rain damages on Chakki- Banikhet Chamba Bharmour road NH 154A 39/0 to 106/0 ( SH C/o PCC R/wall at RD 78/855 TO 78/895 and C/o Wire crate B/wall at RD 47/275 TO 47/310 Under FDR 2025-26
Cement concrete path.
C/O B.Wall and RCC hume pipe culvert.
P/L 25mm mix seal surface.
P/L Metalling and Tarring, C/O V-shape drain, P/F W-metal beam crash barrer and road furniture etc.at R.D.117/298 on MDR-08
Formation cutting in km 0/00 to 0/300, C/O R/wall B/wall at various Rds and P/L 600 mm dia RCC Hume pipe culvert at Rd 0/150) UNDER OTMNP Head)
P/L 30mm thick bitumen concrete with paver.
P/L 30 mm thick bitumen concrete
(SH- R/Wall, B/Wall, WBM G-II, side drain, Cross drainage work, Tarring, C.C. pavement, crash barrier and road signs board i/c five year R/M)
Special repair to Parwanoo Kasauli Dharampur Subathu Solan MDR 06 road in Km. 000 to 57320 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km 000 to 400 Under NHAI Deposit 3rd call
One time Improvement.Balu Galoa Realignment km 193/000 to 194/155
Professional Painting Service - Walls; Exterior Walls; NA
Security Manpower Service (Version 2.0) - KENDRIYA VIDYALAYA BANIKHET; Unarmed Security Guard, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Ordinary repair to NH 22 New NH05 Kalka Shimla Wangtoo Road from km 131/00 to 145/100 and 0/0 to 13/00 on Shimla Bypass SH Repair of patches and pot holes in Km131/00 to 145/100 and 0/0 to 13/00 SBP Against deposit works
Special Repair by patch work to improve the riding quality of highway in Km. 74-00 to 94-830 on NH-305 SH- P-L DBM, BC in Stretches which will be by passed by re-alignment of widening to two lane proposal from Km. 74-00 to 94-00
Periodical renewal on km. 94/735 of NH-07 Patlion to Surajpur road. (SH- Repair of pot holes by Providing penetration for correction layer and 30mm thick bituminous concrete in km. 0/0 to 1/0 and km. 2/0 to 3/00). under AMP for the year 2022-23.
C/O Link road from NH-05 (Bridge) Shreemati Dank to Duktithol Dumting Km. 0/00 to 1/00 (SH-2.75/5.00 mtr. Wide formation cutting from Km. 0/500 to 1/00 and C/O R/wall and B/walls from Km. 0/00 to 1/00 in various RDs
Restoration of rain damages on NH-70 Km. 58/400 to 196/495 (SH-Pot holes/patch repair with Bitumenous course (BC) in selected reaches between Km. 161/400 to 164/0 and 177/600 to 196/0 for the year 2019-20 in the State of H.P. under FDR (New)
Restoration of rain damages on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 106/0 to 172/0 C/o of PCC R/walls at Km 147/158 to 147/171 and 155/240 to 155/253 ) for the year 2019-20 in the State of HP Under FDR ( New).
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A (SH Construction of U shape drain from Km 0/0 to 0/420 and 0/450 to 2/0 and 2/630 to 2/960 and 3/600 to 4/350 and Km 4/690 to 4/920)
Maintenance of Four Laining of End Pandoh by pass to Takoli Kullu Section of NH-21 (KM 222/700 to 232/500) under NHDP-IVB on Hybrid Mode in the State of Himachal Pradesh. (SH- Maintenance of existing road from T4-01-P1 km 222/700 Village Deod to Km 2
Ordinary repair to Paonta Rajban Sataun Shillai Hatkoti road on NH 72B (New No. 707) Km 0/0 to 106/120 (SH Hiring of excavator cum loader for removal of slips in Km 50/0 to 75/0 and 96/00 to 106/120 for ensuing moonsoon season in 2021-22
Special repair to Manglour Bridge at Km. 79.875 on NH.305 in the state of H.P SH. Construction Retaining wall in wire crate at RD 0.015 to 0.070 C.o R.wall in PCC at RD 0.170 to 0.180 and C.o B.wall in PCC at RD 0.170 to 0.190 on Diversion Road
Restoration of rain damages to link road from NH-707 to Chhachhetti Km. 0/0 to 14/250. (SH- Construction of RCC deck slab of existing 6.00 mtrs span RCC slab culvert at RD 3/280 alongwith toe wall and wing wall at RD 3/285 to 3/395) (R.H.S.)
Construction of Ambulance road from Nirath NH-05 to village Matena (Upper Nirath) Km 0/00 to 0/405 (SH- Formation cutting, C/o R/wall, B/wall and wire crate wall, Hume Pipe culvert, M/T works and Construction of PCC V-Shape drain Km 0/00 to 0/405)
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 97/00(SH. P/L WBM G-II and G-III at RD 28/00 to 28/150, 44/400 to 45/00, 45/850 to 45/950 and 48/00 to 48/320)
C O Ambulance road from NH 205 to Kamna Devi Kamna Nagar Ward no 8 B ganj Kamna Nagar Upper Chakkar RD 0 450 to 0 950 SH C O R wall at RD 0 550 to 0 562 0 640 to 0 652 and 0 750 to 0 762
P/L patch work in bitumen concrete
P/L P.C.C.R/wall from R.D.53/000 to 53/010)
C/O Rain Shelter.
Restoration of rain damages to NH-05 Km 236/00 to 368/00 (SH Construction of Retaining wall in PCC with steel dowels from Km 316/885 to 316/930 and C/O Retaining wall in wire crate from Km 316/930 to 316/945 at Nigulsari block point) under HPPCL depo
Survey investigation and preparation of DPR through consultancy for constr impvmt of extng rd KNC fm Cl 9 to NHDL specification fm km 0 to km 31 pt 430 inclding aprch rd to khab of 3 km length km 0 reckoned from km 433 pt 265 NH 05 of HT rd HP
Restoration Of rain damages on various roads 1 Road from Cemetery road to Amit House ward No 23 Bhatta Kuffer 2 Phase RD 0 00 to 0 085 II Road from NH 22 to Frood Village RD 0 00 to 0 900 SH C O R wall and B wall at different RD
Balance work for C/O link road from Peo Khawangi to NH-22 Km. 0/00 to 3/600 (SH- ROFD, R/wall, B/w all, X-drainage work including P/L Kharanja soling, Katcha drain, sign board, dumping structure and parapets in Km. 0/00 to 3/600) (Under NABARD) RI
Repair and maintenance of link road from NH-07 to village Balluwala km. 0/0 to 1/0 (SH P/L 80mm.thick interlocking concrete paver tiles and C/O V-shape drain at various RDs and NP-2 pipes 300mm.dia and 600mm.dia for drainage etc. From RD. 0/0 to 0/3
Improvement of road from ropar road to Radiali Shiv mandir NH 105, Balance work of road from Parkash Dhaba to Reru km 0/500 to 1/00 mtr, C/o new road from near Solid Waste Plant Dabhota to vllage Majra via SC and Rajput Vass km 0/0 to 1/0.