Loading…
Loading…
1,574 results • Best match
Maintenance of Four laning of End Pandoh bypass to Takoli Kullu Section of NH 21 on Hybrid Mode in the State of Himachal Pradesh Regarding one time maintenance of existing road from T4 01 P1 KM 227.600 to Km. 232.500 Larji Power House.
Temporary Restoration of Abandoned portion of NH 05 near Solding Bridge from Km 321/220 to 322/00 (SH. P/L Hume Pipe Culvert, R.wall in Wire crate and Filling in Embankment Between Km 0/420 to 0/530) under HPPCL Deposit
Construction of 2 Lane with paved shoulder of Hamirpur bypass of New NH103 and NH03 Design Chainage Km 121175 to Km 138295 Design length 17120 Km in the State of Himachal Pradesh under NH O One time Improvement estimate for strengthening Section I
Construction of 190 Feet TDR Bailey Bridge for IRC load class 30R on NH 05 over River Satluj at Chainage RD 347/250 in the state of HP.SH Launching of Bailey Bridge including cement concrete work for bed block as per site requirement
Construction of 2 Lane with paved shoulder of Hamirpur bypass of New NH103 and NH03 Design Chainage Km 121175 to Km 138295 Design length 17120 Km in the State of Himachal Pradesh under NH O One time Improvement estimate for strengthening Section II
Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh On EPC mode
C/O Steel footpath and Providing and fixing Interlocking Paver Block on Berms etc. ( Against Smart City)
SH Construction of breast wall at RD 67/220 to 67/242 on hill side(Deposit work)
C/O Steel footpath and Providing and fixing Interlocking Paver Block on Berms etc (Against Smart City)
SH Hiring of JCB and Tipper for removal of slips from km 49/0 to 56/0
C/O Steel footpath and Providing and fixing Interlocking Paver Block on Berms etc Against Smart City
C/O Steel footpath and Providing and fixing Interlocking Paver Block on Berms etc. ( Against Smart City)
C/O Steel footpath and Providing and fixing Interlocking Paver Block on Berms etc. (Against Smart City)
C/O Steel footpath and providing and fixing Interlocking Paver block on Berms and construction of B/wall at RD 1/670 to 700 on Shimla By Pass (Against Smart City)
Providing and laying BM for correction layer and 40mm thick bitumen concrete, road marking, cat eyes, delineator in KM 173/900 to 179/600, total length is 6.100 KM.
Hiring of 80 no Safai Karamcharis through Contractor/Firm/ Society/NGO for Cleaning, Sweeping of Streets, Roads, Drains , Cutting Bushes and any other sanitation Work of MC Baddi from Ward No 1-9 , Sabji Mandi, Sai Road, Bus Stand Baddi NH Road
AR and MO left out portion NH 03 in Patlikuhal Chowk
AR and MO left out portion NH 03 in Patlikuhal Chowk
Restoration of rain damages to various residential and non residential buildings under division no III Shimla. (SH- C/O Retaining wall on back side of set no 20 for protection work C/O R/wall on back side of NH circle at Balkwali at Chaura
ROFD, RCC H-pipe culver, R/Wall WBM.
Repairing and Painting works of CISF Barrack, CSD Canteen, CISF Mess and raising of existing perimeter wall of CISF Campus at Khairi, CPS-1 Khairi.
Re-babbitting of Oil seal segments and Upper guide bearing of Chamera Power Station-1, Khairi
Checking of rotor level and Shaft alignment after replacement of spring mattress/thrust pad and repair of upper bracket and stator frame and correction of rotor leveling and shaft alignment
Testing of Insulating Oil of GSU Transformer and Reactors installed at Switchyard of CPS-I
AMC of fire fighting system installed at Power House complex of Chamera Power Station-I.
Formation and Cutting of road Km. 0.0 to 0.200 and Construction of PCC R.Wall (Deposit work).
Periodical Renewal work from Km 254/0 to 269/0 of Kalka Shimla Wangtoo Road on NH-22(New NH-05) in the State of HP on EPC Mode.
Restoration of Rain damages on NH503 Mubarikpur Dehra Ranital Kangra Matour Dharamshala Mcleodganj road from km 18990 to km 19015 Matour Dharamshala Mcleodganj SH Co RWall in PCC M15 at RD 18990 to 19015 under FDR 202526 Job No RO HP NH 503 2025 26
Link road from NH-21 Raghunathpura to Mandi Bharari Km 0/0 to 2/750 in Tehsil Sadar District Bilaspur (SH Shifting of utility hand pump at RD 0/480 and 2/510) and laying jointing and testing of GI pipe of various diameter).
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 97/00 (SH- C/O B/wall in RR masonry at RD 22/279 to 22/334 and V-shape drain at RD 22/279 to 22/450)
Restoration of rain damages on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 106/0 to 172/0 C/o of PCC R/walls at Km 144/180 to 144/202 for the year 2019-20 in the State of HP Under FDR (New).
Maintenance of Four Laining of End Pandoh by pass to Takoli Kullu Section of NH-21 km 222/700 to 227/600 (SH- Dismantling and re-construction of existing RCC Railing at RD 226/470 to 226/505 and 227/580 to 227/601.30).
Restoration of rain damages on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 106/0 to 172/0 (C/o of PCC R/wall at Km 104/280 to 104/310 ) for the year 2019-20 in the State of HP Under FDR
estoration of Rain damages on NH503 Mubarikpur Dehra Ranital Kangra Matour Dharamshala Mcleodganj road from km 18375 to km 18405 Matour Dharamshala Mcleodganj SH Co RWall in wire crate at RD 18375 to 18405 under FDR 202526 Job No RO HP NH 503 2025 2
A/R and M/O various road under Nadaun Sub Division.(SH Repair to pot holes).(i) Rangas Jeehan road.(ii) NH-70 Kohla Kaloor road.(iii) Choru Bhou Jeehan road. (iv) Lahar Rattian road.(v) Dhanpur Pathrian road. (vi) Bara Sandhora Pattan road.
Improvement of Black spot on C.M.M. road NH-205 Km. 86/0 to 127/0 (SH- Providing and fixing thrie metal beam crash barrier at Km. 120/286 to 120/330, 120/361 to 120/480 and Edge wall 120/405 to 120/460).
RESTOATION TO RAIN DAMAGES ON NH.305 SAINJ-LUHRI-AUT ROAD KM 37.500 TO 53.00 AND 63.00 TO 72.00 IN THE STATE OF HIMACHAL PRADESH SH. CONSTRUCTION OF RETAINING WALL BREAST WALL IN PCC AND WIRE CRATE AT VARIOUS REACHES BETWEEN KM 25.300 to 37.500
Construction of road from NH to Govt. High School Tanda via Saheed Capt. Vikram Batra College to connect SC Basti road Km 0/00 to 3/500. (SW- Metalling Tarring at various RD 1/290 to 1/900 and 2/045 to 2/220 (SCSP).
Restoration of rain damages on Chakki- Banikhet Chamba Bharmour road NH 154A Km 39/0 to 106/0 ( Const of P.C.C R./wall at RD 60/077 TO 62/102 and Wire crate R/wall at RD 57/680 TO 57/705 Under FDR
C/O Ambulance road from Nirath NH-05 to Matena (Upper Nirath) Km 0/00 to 0/600 (SH. Formation cutting , C/O R/wall in PCC, C/O Hume pipe Culvert, C/O Drain and MT work between Km 0/00 to 0/600).
Const. and upgradation of Rampur Rajehar Sarsawa via Kapen Neelkanth Mandir Bhadrena NH at Sungal 0/00 to 10/165 (SH- Imp, P/Places, R/Walls, Missing C.D work, Wet Mix, WBM-II, WBM-III, Tarr work, BM, CC Pavement, S/drain,Parapets) (RIDF XXIX)
A.R and M.O NH-305 Sainj-Luhri-Aut road Km. 0.0 to 53.00 (SH. Providing and laying tarring work in Km. 0.00 to 1.700, construction of U shape drain in Km. 0.160 to 0.480 and construction of slab culvert 2.0 m span at RD 0.300.
Construction of link road NH-88 Paisa Chowk to Un-Connected Basti Balugaloa Km 0/000 to 2/000 in Distt. Kangra (H.P.). Under SCSP Head (SH-Construction of WBM Grade-I and cement concrete pavement (M-30) at RD 0/000 to 0/500)
Repair and Maintenance of link road NH-07 to village Baluwala km 0/00 to 1/00 (SH-Construction of U-shape drain at RD 0/135 to 0/340 and edge wall and drain at RD 0/345 to 0/445 Left side portion).
Construction of link road from NH-70 Saloha to village Badwal in GP Nounghi km 0/0 to 1/0. (SH P/L Wet Mix Macadam and 25mm thick BC in km 0/0 to 0/810 and Retaining wall, V-Shape drain etc.).
Restoration of road damaged caused due to laying of OFC on NH- 503 A at Km 0/0 to 70/00 (SH- Construction of edge protection wall to road and site development for construction of Rain shelter at RD 15/150 against OFC deposit work
Restoration of Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Construction of Stone Masonry Breast wall at RD 25.580 to 25.587, 27.900 to 27.915 and Stone Masonry Retaining wall at RD 27.864 to 27.870 and 27.880 to 274.886
Maintenance of Four laining of End Pandoh bypass to Takoli Kullu Section of NH 21 Km 222,700 to 227,600 SH Hiring of Excavator cum loader for removal of slip boulders, debris etc. at various RDs and Hiring of Tipper for carriage or carriage of muck
Improvement Construction of existing Class 5 Road to NHIL Spec with Hard Shoulder from existing Km 134pt940 to Km 169pt970 Design chainage from Km 133 to Km 166 Total Length 33 of NH 505 Sumdo-Kaza-Gramphoo Road on EPC mode in HP Package II
Tender for shifting of 2 Nos of 250 KVA 11/0.4 KV s/stn Bus Stand and Sabji Mandi ( Bum Chowk) Jahu a/w LT Line coming in the alignment of NH Mandi - Jahu on Partial turnkey basis under ESD HPSEBL Bhareri. (ED Barsar)