Loading…
Loading…
1,573 results • Best match
C,o road NH 21 Kenchi Mod to Village Khaneu Mohal Km 0,0 to 2,0 SH Removal of slips boulders muck debris etc. at various RDs and C,o created R,wall at RD 0,510 to 0,517.20) BSP,2024,343
Construction of two Lane RUB in lieu of existing railway level Crossing No 96 C 2 E at Railway Km 119 3 4 on NH 503A at Km 20 690 in the state of Himachal Pradesh on EPC Mode
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road NH 907A Km 0/00 to 78/0 (SH Clearance of land slide in hard rock/boulders between Km 61/230 to 61/930 and 62/300 to 62/315)
Improvement of Black spot on NH-205 km. 86/0 to 127/0(SH- Providingand fixing Crash barrier in km. 105/370 to 105/405,110/870 to 110/915,111/160 to 111/240 and 113/270 to 113/330)
Restoration of Rain damages on NH.05 Km 236.000 to 368.000 SH. Hiring of hydraulic execavator with breaker for removal of slips.massive rock slides as and when required at Nigulsari Slide Point from Km 316.00 to 317.250 Bhabanagar end.
Restoration of Rain Damages on NH-305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH Hiring of hydraulic excavator with breaker for removal of slips.massive rock slides and Tipper for carriage of debris between Km. 0.000 to 08.000
Construction of link road from NH-88 paisa Chowk to Harizan Basti Balugaloa in Distt Kangra (HP) Under SCSP Head (SH-Providing and laying WBM grading-III and cement concrete pavement road at RD 1/020 to 1/170).
Construction of link road from NH-303 to Lahru wala temple in Gram Panchayat Jhikali kothi in Distt Kangra (HP) MMSY Head (SH-Providing and laying Grading-III and cement concrete pavement in Km 0/125 to 0/255).
RESTORATION TO RAIN DAMAGES ON NH-305 SAINJ-LUHRI-AUT ROAD KM 80.00 TO 94.00 IN THE STATE OF HIMACHAL PRADESH SH. CONSTRUCTION OF RETAINING WALL IN PCC AT VARIOUS REACHES BETWEEN KM 80.00 TO 94.00 UNDER FDR 2025.26
Construction of 2 Nos. Box cell culvert on NH-154A (i) Box cell alongwith approaches at Rungdi Nallah at Km 131/770, Rain shelter at Km 131/783 and (ii) Box cell along with approaches at Km 138/200
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 97/000 (SH. C/o PCC R/wall at Rd 55/090 to 55/095 and 57/890 to 57/899) (Under FDR 2023-24)
Consultancy services for AE for Supervision of Construction of missing link from Birhu to Lathiani into 4-lane from km 35.550 to km 42.800 on NH-503A including Cable Stayed Bridge (0.860 km) in Himachal Pradesh on EPC Mode
A/R and M/O of link road from NH-07 to village Ballu wala km. 0/0 to 1/0(SH- P/L balance ISI marked interlocking concrete paver tiles 80mm. From RD 0/0 to 0/170).
Periodical Renewal Coat for the year 2026 27 on Link road Mehatpur Una Mubarikpur Daulatpur HP Boundary Except NH Portion SH Providing and laying 30mm thick Bituminous Concrete laying with paver finisher in Km 500 to 600 MDR 81
Restoration of Rain damages on NH503 Mubarikpur Dehra Ranital Kangra Matour Dharamshala Mcleodganj road at Km 10525 Section Matour Dharamshala Mcleodganj Culvert 5 x 5 at RD 10525 under FDR 2025 26 Job No RO HP NH 503 2025 26 001
RESTORATION TO RAIN DAMAGES ON NH-305 SAINJ-LUHRI-AUT ROAD KM 0.00 TO 25.00 IN THE STATE OF HIMACHAL PRADESH SH. CONSTRUCTION OF RETAINING WALL IN PCC AT VARIOUS REACHES BETWEEN KM 0.00 TO 25.00 UNDER FDR 2025-26
Restoration of Rain damages on NH303 Nagrota Bagwan to Ranital Km 000 to 3900 SH Repair of Patch work at Km 7200 to 17000 at various RDs under FDR 2025-26 Job No RO-HP-NH-303-2025-26-001
Periodical renewal on link road NH-07 to Majra road under Annual Maintenance Plan for the year 2026-27. (SH- Providing and laying 30 mm thick Bituminous Concrete using plastic waste in km 0/0 to 1/0 including profile correction )
Construction of link road bifurcate from Badrinagar Jamniwala Parduni road near fish farm to Taruwala NH-707 km.0/0 to 0/690(SH-Providing and laying interlocked concrete block pavement 80mm.Thick at RD 0/0 to 0/690)under MMGSY
Re surfacing of Various MC Roads in ward no 29 (i) Road from Madan Building to Mankotia House (RD 0 0 to 0 200 mtrs) (ii) Road form NH to Kali Mata Mandir (R D 0 0 to 0 300 mtrs)
Restoration of rain damages on Sainj Luhari Anni Jalori Banjar Aut road NH 305 km. 53.0 to 97.0 SH Construction of PCC Retaining wall with Toe wall at RD 83.290 to 83.302 in the State of Himachal Pradesh against NDRF Funds.
Restoration of rain damages on NH-305 Sainj- Luhri- Aut road Km 0/00 to 97/00 (SH- Construction of PCC R/wall at Km 63/832 to 63/870 and 63/870 to 63/910) under FDR 2022-23
Restoration of rain damages to NH 907 Nahan Do Sarka Sarahan Kumarhatti road Km 0/00 to 78/00 (SH P/L GSB Wet Mix Dence grade bituminous and Bituminous concrete in various RD between Km 0/00 to 5/00)
Construction of Bridge at Luna RD 150 450 on NH 154A in the State of Himachal Pradesh SH 41 5 m Span Steel composite Bridge, Bailey Bridge Dismantling of Bailey Bridge Formation Cutting and Filling Protection work Metalling and Tarring
Restoration of rain damages on Kot Kadyara Madyana Sai NH-70 road Km. 0/0 to 4/500. (SH- Construction of B/Wall at RD. 0/11.50 to 0/23.50 and edge wall at RD 0/630 to 0/650)
Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35.550 Design Chainage 0.000 to 42.800 Design Chainage 8.153 on NH 503A including Cable Stayed Bridge 0.860 Km on Back Water of Govind Sagar
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH P/L GSB,G-I, G-II Bitumen concrete in Km 134/240 to 134/315 134/940 to 134/970
Restoration of rain damages on NH-22 from Km. 236/0 to 368/0 (SH. Construction of P.C.C. Retaining wall at RD 304/017 to 304/037) for the year 2019-2020 in the state of Himachal Pradesh under FDR( New).
Restoration of rain damages on NH-305 Sainj- Luhri- Aut road Km 0/00 to 97/00 (SH. Construction of PCC R/wall with skin reinforcement in front face at Km 19/833 to Km 19/860) under FDR 2022-23
Periodical renewal on Km 95/00 of NH-07 to Santoshgarh road under Annual Maintenance Plan for the year 2026-27. (SH- Providing and laying 30 mm thick Bituminous Concrete in km 0/0 to 0/630 including profile correction)
Restoration of Rain Damages on NH-305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Hiring of hydraulic excavator with breaker for removal of slips. massive rock slides and Tipper for carriage of debris between Km. 74.00 to 94.00
Periodic Maintenance of Link road from NH-22 to Pooh Km. 0/00 to 4/320 under AMP for the year 2024-25 (STATE ROAD) VR-HP0502VR006121301302, 303, 304 and 305 (SH- Annual surfacing from 0/00 to 4/320
Restoration of Road damages on NH -503A Km 0/00 to 70/00 SH Construction of Bhadsali Bridge at km. 10/214 Preparation of Detailed Project Report, General Arrangement Drawing, soil bearing capacity, hydraulic data, structural design of sub structure
Repair and maintenance of Kenchi Mod to Rest house Pandoh km 0/0 to 2/500 to connect the NH-003 (SH- P/L GSB, WMM, 50 mm DBM and 30 mm B.C. in km 0/0 to 2/500).
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti Road on NH 907A Km 0/00 to 78/00 (SH C/o RCC U Shape side drain near Banahan ki sair to tikha mor at RD 35/740 to 35/875)
Project Management Consultancy Services for feasibility study and detailed engineering for rehabilitation and up gradation of NH 154A from km 84 00 to km 93 00 and km 130 00 to km 172 00 in the State of Himachal Pradesh
Safai of area during lavi fair-2025 from Indira Market to Divider and NH-05, Mela ground from Gaura Diversion to PWD office upto Chati Bridge, HRTC workshop, revenue colony , Housing board colony, near toilets outside Mela ground, door to door
Restoration of rain damages on Chakki Banikhet Chamba Bharmour road NH 154-A 39/0 to 106/0 SH C/o PCC R/wall at RD 92/860 TO 92/880 and 87/940 to 87/960 Under FDR2025-26
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2 lane with paved shoulder and geometric improvements of NH 907A from Km 5 00 to Km 78 00 Nahan to Kumarhatti Stretch in the State of H.P
Recarpeting of road from NH 105 to VMT, GP Sandholi RD 0/00 to 0/500., Widening of road from Kishanpura bus stand to near shiv mandir Kishanpura (RD 0/00 to 0/300) (Sh-25 mm thick BC,drain etc.)
Restoration of rain damages on NH-05 Km 236/00 to 368/00 (SH- Construction of R/wall at Km 259/390 to 259/405, 267/060 to 267/080 and 267/975 to 267/995) under FDR 2021-22
Annual Maintenance Plan for the year 2025-26 Village Road on link road from NH-103 to Jahri Cheri Kassaru Babeli road km 0/00 to 2/00 SH Providing and laying 25mm thick Bituminous Concrete including repair of road
Maintenance of Four laning of End Pandoh bypass to Takoli Kullu Section of NH 21 on Hybrid Mode in the State of Himachal Pradesh Regarding one time maintenance of existing road from T4 01 P1 KM 222.700 Deod to Km. 227.600.
Restoration of rain damages on Sainj Luhari Anni Jalori Banjar Aut road NH 305 km. 53.0 to 97.0 SH Construction of PCC Retaining wall with Toe wall at RD 58.135 to 58.145 in the State of Himachal Pradesh against NDRF Funds.
Maintenance of four laining of end by pass to Takoli Kullu section of NH-21 Km. 222/700 to 227/600 under Hybrid Mode in State of Himachal Pradesh. SH-Preparation of detail project report DPR Working Estimate and DNIT.
Slope stabilization and rock fall mitigation works at Km 273 280 to 273 600 Km 274 310 to 274 435 274 550 to 274 660 and 275 730 to 275 855 on NH 05 in the state of Himachal Pradesh
Periodical Renewal Coat for the year 2026 27 on Link road Mehatpur Una Mubarikpur Daulatpur HP Boundary Except NH Portion SH Providing and laying 30mm thick Bituminous Concrete laying with paver finisher in Km 300 to 400 400 to 500 MDR81
Annual repair and maintenance of Motipur Dudar road Km.0/0 to 2/500 AND Nerchowk Pandoh bypass (Section of NH-21) road Km 198/145 to 203/500 (Sub Head - Repair to pot holes and patch work in various reaches)
Construction of link road towards Jeor Bag from Kullaru/ NH SH Providing and laying cement concrete pavement at RD 1/300 to 1/360 , at RD1/450 to 1/510 and at RD 1/560 to 1/639.50 Under SDRF/NDRF