Loading…
Loading…
1,573 results • Best match
A/R and M/O ON Chakki Baniklhet Chamba Bharmour road NH 154A Km 39/0 TO 106/0 ( SH C/o P.C.C Pusta with Dowel Bars at RD 104/300 to 104/316 ( Under OR New)
A/R and M/O on NH-305 Sainj Luhri Aut Road Km 00/00 to 97/00 (SH.- Construction of PCC R/wall at RD 11/540 to 11/550 and 11/555 to 11/572).
A/R and M/O ON Chakki Baniklhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o P.C.C Pusta with Dowel Bars at RD 133/450 to 133/460( Under OR New)
Restoration of rain damages due to laying of OFC on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 106/0 to 172/0 ( SH C/o PCC R/wall at RD 116/692 to 116/706
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road Km 0/0 to 78/0 on NH 907A (SH Construction of PCC Breast wall at RD 58/650 to 58/800 and 69/020 to 69/080)
Protection work of PSC box girder on bridge over river Beas near (Victoria bridge) at Mandi adjacent to NH-20 at RD 205/970 (Span 156.40mtr.) (Sub Head -Construction of Retaining wall length24.00mtr. Khaliyar side).Under PDNA
A/R and M/O on NH-305 Sainj- Luhri- Aut Km 0/00 to 53/00 (SH-Tarring/Patch work with 30mm BC including 50 mm DBM in pot holes RD 00/00 to 16/900).
Construction of road from NH-07 to faqir Basti Tokion km 0/0 to 1/00 (SH-C/O U-shape drain,P/L G III and 20mm premix carpet in km.0/0 to 1/00).
Ordinary repair to Kala Amb Paonta Sahib Dehradun road NH 72 (New NH07) Km 46/00 to 103/00 (SH Construction of PCC Toe wall for existing abutment markanda Bridge Paonta Sahib side at RD 64/810)
A/R and M/O on NH-503 Extn. Km. 0/0 to 44/700 (SH Strengthening and improvement of road safety Audits and Rectification of blackspot at Kuthera Khairala, Nandpur, Bhaira, Dhussara, Panoh and Jhalera Chowk)
Ordinary repair to NH-907A on Nahan Do Sarka Sarahan Kumarhatti road Km 0/00 to 78/00 (SH C/o PCC Retaining wall at RD 48/830 to 48/840 and 49/920 to 49/926)
A/R and M/O ON Chakki Baniklhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o P.C.C Pusta with Dowel Bars at RD 131/500 to 131/510 ( Under OR New)
Restoration of rain damages on NH-305 Sainj- Luhri- Aut road Km 0/00 to 97/00 (SH. Construction of wire crate R/wall at RD 44/600 to 44/706 and 44/717 to 44/789).
Construction of link road from NH NEAR Kullarun to Jeor Bag via Shoghi SH Providing and laying cement concrete pavement at RD 1/300 to 1/360 and at RD 1/560 to 1/639.50 Under MMSY
Annual repair and maintenance of Nerchowk Pandoh Bypass road (section of NH-21) Km. 198/145 to 203/500 and Motipur Dudar road km. 0/00 to 2/500 (SH- Repair to pot holes and patch work) .
A/R and M/O to Kala Amb Paonta Sahib Dehradun road on NH-07 Km 46/00 to 103/00 (SH Providing and fixing rumble strip of cat eyes at RD 46/00 to 52/00)
EOI-cum-Financial Bid for undertaking Consultancy Services for preparation of Detailed Project Report, Tender documents and Bid process management for Installation of an Escalator/Travelator from Parking Near NH to Mall Road, Manali Distt. Kullu HP.
Rehabilitation and Upgradation to two-lane configuration of Kalwahn-Mandi Section (km 208.950 to km 250.592) of NH - 70 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
P/L 50mm thick dense Graded Bitumen Macadam and 40mm thick Bitumen concrete, P/L making of centre line, edge line, zebra crossing, sign board and cautionary board and P/F W-Metal crash barrier in Km. 86/0 to 127/0
RRD on NH 03 to Kalath Chhiyal road
C O Parwanoo Kasauli Dharampur Subathu Solan road in Km 0 00 to 55 00 SH C O PCC B wall at Rds 20 397 to 20 415 NHAI Deposit
Balance work of link road from Nangal ground to baroa via Vardhman factory. (RD 0/00 to 1/00), C/o Balance work of road from NH-105 Jhiriwala to village Dhundali Km 0/500 to 3/500.
A/R and M/O to Nahan Do Sarka Sarahan Kumarhatti Road on NH 907A Km 0/00 to 78/00 (SH Construction of PCC Retaining wall at RD 4/465 to 4/475 Near Govt ITI Nahan)
Consultancy Services for Balance works of Land Acquisition Plan, Forest Clearances proposals and other pre construction activities in respect of Detailed Project Report (DRP) for Sainj-Luhri-Jalori-Banjar-Aut road excluding Jalori Pass Tunnel of NH-3
Construction of Street and Drain in Harijan Basti from NH 07, Towards h/o Sh. Sumer Chand and near the h/o Rishi Pal , Sh. Sewa Ram, Opp. Panchayat Ghar and etc in Ward No 01, Paonta Sahib
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 53/000 (SH-C/o PCC R/wall at Rd 53/410 to 53/417 ,54/080 to 54/087 (Under FDR 2023-24)
Improvement of Black Spot on NH-205 Chandigarh Mandi Manali road km 105/00 to 127/00 ( SH- Construction of R/wall and Providing and fixing W- Metal Beam Crash Barrier at Rd 111/700 to 111/730)
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 53/000 (SH-C/o PCC B/wall at Rd 39/860 to 39/875, 46/500 to 46/530 (Under FDR 2023-24)
A/R and M/O to NH-72 (New NH07) Kala Amb Paonta Sahib Dehradun Road Km 46/00 to 103/00 (SH Construction of PCC Retaining wall at RD 66/00 to 66/018) Near Dhimki Mandir)
A/R and M/O on NH-70 (New 03) Km. 58/400 to 196/495 (SH- Providing and laying Bituminous Concrete in different reaches in Km. 180/0 to 186/0 and 190/0 to 196/495)
Periodical Maintenance of Link road from NH-22KM 4020 to Ropa Khas (Under Annual Maintenance Plan for the year of 2022-23 (PMGSY Road) (VR-HP052VR00672131, 302 and 303) (SH- Annual surfacing from 0/00 to 3/00
Ordinary repair to Kala Amb Paonta Sahib Dehradun road NH-72 (New NH07) Km 46/00 to 103/00 (SH Construction of PCC Retaining wall at RD 82/300 to 82/320 and 82/250 to 82/275)
Construction of 560mtr. Long Bridge over Swan River at km. 2-065 on Pandoga Teuri upto NH-503 Ext road Km. 0-0 to 6-500 in District Una Under CRIF Job No. CRIF-HP-2023-24-186
Rehabilitation and Upgradation to intermediate lane configuration of Shri Kyari-Gumma Section (km 75.000 to km 94.900) of NH-707 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Four laning of Shimla-Mataur Section of NH 88 (Now NH205) from Km 0.000 to Km 223.700 in the State of Himachal Pradesh- Filling of Potholes from Ch. Km. 71.000 (Brampukhar) to Ch. Km. 79.000 (Nalwar) (2nd Call)
Independent Engineer services during O and M of six laning of Mandi Dabwali (Haryana Punjab Border) Sangaria road section from Mandi Dabwali Bypass to Chautala Km 62.200 of NH-54 in the state of Haryana on HAM mode
Balance work of road Rampur Rajehar to Sarsawa via Kapen Neelkanth Mandir Bhadraina NH at Sungal KM 0/00 to 10/765 (SH- R/Wall, U-shape drain , G-II, G-III and Bitumen Concrete (NABARD RIDF-XXIX)
Periodical Maintenance on NH-22 to Khadura road Km. 0/00 to 5/00 (Under Annual Maintenance plan for the year 2026-27) VR-HP0502VR003221102, 103, 104, 105) (SH- Annual surfacing from Km. 1/00 to 5/00)
SH Hiring of JCB and Tipper for removal of slips from km 56/0 to 66/275
Protection of Kundlu Bridge Nalagarh Side
SH Providing and erecting double beam single side metal beam crash barrier railing between km 154.980 to 155.260
RFPFor AppointmentOf SafetyConsultants ForDPRStage 2LPS ShimlaShalaghat (DesignCh0to27.5, DesignLength27.5km, ExistingLength30km)Pkg1, 4,2LPS ShalaghatNauniChowk (DesignCh27.5to58.47, DesignLength30.97km, ExistingLength 48km)Pkg2 ofNH205state HP(2Cal
CS for SC for Operation and Maintenance of 4Laning of Parwanoo-Solan section from Km67 to Km106.139 on EPC including AE services for Construction of 2Viaducts at Km88.44(LHS)andKm103.32(LHS) atParwanoo-Solan section of NH05 in State of HP onEPC(2Call
Appointment of SafetyConsultant for Construction of 4L Kaithlighat Shakral(Shimla Bypass PkgI Km128.835 Km146.3) and 4L Shakral Dhalli(Shimla Bypass PkgII Km146.3 Km156.56 and Shimla connectivity from Km0 Km0.725) in the state of HP onHAM mode.(3rdCa
Request for proposal (RFP) for Appointment of Safety Consultant for Four laning of Takoli to Kullu section of NH21 Km 242.000 to Km 272.000 on EPC Mode in the State of Himachal Pradesh AND Up gradation of Kullu-Manali section of NH21 new NH3 from Km
RFPForAppointment OfSafetyConsultants ForDPRStage 4L Rajol Thanpuri (Km72to85.135)PkgIIB, 2LPSParourChauntra (100.84to140.625)PkgIII, 2LPSChauntraPadhar (140.625to180)PkgIV, 4LPSBijniMandi (202.815to208)PkgVB of Pathankot Mandi NH154 in HP (2nd Call)
RFP For Appointment of Safety Consultants for DPR Stage 4L Rajol Thanpuri(Km72to85.135)PkgIIB, 2LPS Parour Chauntra(100.84to 140.625)PkgIII, 2LPS Chauntra Padhar(140.625to180)PkgIV, 4LPS Bijni Mandi(202.815to208)PkgVB of Pathankot Mandi NH154 in HP.
Slope Stability erosion control landslide correction measures at various section on Takoli Kullu section of NH03 from Km 262 to Km 265 in HP on EPC Mode
Periodical Renewal on Jalandhar Hoshiarpur Gagret Amb Naudan Hamirpur TauniDevi Awahdev Sarkaghat Mandi road from km 100 0 to 114 0 and km 137 435 to 140 200 on NH 70 in the state of HP on EPC