Construction of link road towards Jeor Bag from Kullaru/ NH SH Providing and laying cement concrete pavement at RD 1/300 to 1/360 , at RD1/450 to 1/510 and at RD 1/560 to 1/639.50 Under SDRF/NDRF
Maintenance of Four laining of End Pandoh bypass to Takoli Kullu Section of NH -21 Km 222/700 to 227/600 SH- Hiring of Excavator with stone breaker for removal of slips/boulders, debris etc. at various RDs. Job No.1.
SH Construction of U shape drain in various reaches in Km 156/750 to 165/300
Providing and fixing RCC Drain Cover on existing U shape Drain at Various locations of built up area
Construction of R/ Wall B /Wall with U Shape Drain and B.Wall with V Shape Drain at Various locations between km 49.500 to 65.500
Providing safety protection from hill side includes B/wall betwwen km. 1/360 to 1/500 near via duct on the effected portion of NHAI (Excluding GST)(Against Court matter CWPIL 38/2024
Development of new A Site RO at MOHAL GHANDAL, TEHSIL DHAMMI, ON SHIMLA MATOUR ROAD ON NEW NH-205 (OLD NH -88), DISTT SHIMLA, (HP), PSO
Painting of different structures in Siul Weir and other miscellaneous works
Carrying out Annual Maintenance and Repair of underwater parts of three Generating Units of 3X60 MW of BSPS
Water proofing treatment over TnHRD, Main office, Hospital and KVS School Building at Simbleu, CPS-1.
Purchase of SKF make bearings for Primary and Secondary cooling water pumps at Power House Chamera-III Power Station Dharwala HP. (PR-639)
Installation of OFC link from Administrative Building to Hospital Building, Kandai Barrier and DType Quarter in Chamera-I Power Station
Providing Cut-Outs in Power House at various Floors and Walls by using Core-Cutting Machine for Unit 1 and 3 and for some common system at Baira Siul Power station, Surangani
Painting of Dam Top railing/parapets, external walls of Control room, Up-Stream face of Dam, Gallery-A railing and surrounding structure of CPS-I Dam etc.
Construction of Shed Over Radial Gate Hoist Assembly at Baira Dam
Removal of slips between km.55/700 to 64/930
SH Providing and laying renewal coat with 30mm bitumen concrete at RD 173/900 to 178/300
Construction of retaining wall between Km 153/725 to 153/785 and Km 154/310 to Kms 154/361) against Smart City Project
SH Construction of Retaining wall in Gabion Structure in Km53/015 to 53/045 for the year 201920
Restoration of Kundlu Bridge at RD 48/918 with Gabion structure and floor mattress ) for the year 2020-21 in the State of Himachal Pradesh under FDR (New)
Restoration of Kundlu Bridge at RD 48/918 with Gabion structure and floor mattress ) Job No. 3 (Against NDRF/CRF)
SH Providing and laying renewal coat with BM 30mm thick bitumen concrete at RD 156/750 to 157/0, 157/0 to 158/0, 160/0 to 161/0 and 162/0 to 163/0 and road marking).
SH Construction of PCC Retaining Wall toe wall in km 56/670 to 56/680 for the year 2019-20 in the State of h.P. under FDR new
Protection work to Mahdev IV Bridge at RD 44/435 with Gabion Structure with Mattress
Restoration of Kundlu Bridge at RD 48/918 with Gabion structure and floor mattress ) Job No. 2 (Against OR)
Providing and laying renewal coat with 30mm bitumen concrete at RD 158/00 to 160/00, 161/00 to 162/00 and 163/00 to 164/00)
Repair of Pot holes and Patch work in Km. 20/0 to 24/0 in various RDs using with paver
Annual maintenance plan for the year 2022-2023 on link road to village Jia from NH Km. 0/0 to 1/500 SH Providing and laying Bituminous concrete in Km. 0/0 to 1/500 and C/O PCC drain Road Number HP0602VR00122221.
R.R. damages on NH-05 Km 236/0 to 368/0 (SH Hiring of hydraulic excavator with breaker for removal of slips/massive rock slides as and when required at Nigulsari slide point from Km 316/00 to 317/250) ( Nigulsari end)
Restoration to Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Hiring of hydraulic excavator, excavator cum loader for removal of slips. massive rock slides and Tipper for carriage of debris. boulder between Km 76.00 to 80.00.
Restoration to Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Hiring of hydraulic excavator, excavator cum loader for removal of slips. massive rock slides and Tipper for carriage of debris. boulder between Km 71.00 to 75.00.
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/0 to to 78/00 (SH Hiring of excavator cum loader for removal of slips in Km 0/0 to 78/0 for ensuing moonson season in 2021-22)
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 97/00 (SH- C/O PCC B/wall at RD 21/668 to 21/752 and V-shape drain at RD 21/610 to 21/752).
RESTORATION TO RAIN DAMAGES ON NH-305 SAINJ-LUHRI-AUT ROAD KM 72.100 TO 79.500 IN THE STATE OF HIMACHAL PRADESH SH. CONSTRUCTION OF RETAINING WALL and BREAST WALL IN PCC AT VARIOUS REACHES BETWEEN KM 72.100 TO 79.500 UNDER FDR 2025-26
Project Management Consultancy Services for construction of Highway 2- lane Tunnel including approaches across the Jalori Pass on Sainj 0/00-Luhri- Aut 97/00 Road NH-305 from Km. 46/080 to Km. 57/00 in the State of Himachal Pradesh.
Repair/Renovation to various Residential Buildings Under Division no.III Shimla. (SH - Repair of set No 19 I/C CGI Sheet in roof near NH Circle at Chaura Maidan and dry cleaning of carpet in Nalagarh House set No 1 at Boileauganj Shimla.)
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 53/00 (SH P/L 50 mm thick DBM at RD 28/00 to 28/150, 44/400 to 45/00 and 48/00 to 48/320)
Maintenance of Four Laning End of Pandoh Bypass to Takoli Kullu Section of NH-21 (km 222/700 to 232/500) (SH- Removal of slips, Construction of retaining wall and W-metal beam crash barrier in km 222/700 to 227/600).
Periodical renewal on link road from km. 10/300 of NH-707 to Chhachheti (PMGSY road) Under Annual Maintenance Plan for the year 2025-26. (SH-Providing and laying 25mm thick Bituminous Concrete in km. 5/0 to 6/0 including profile correction).
Construction of link road NH-88 to Paissa Chowk to Balugaloa road Km 0/000 to 1/500 in Distt kangra (HP) SCSP Head (SH-Providing and laying Grading and III and Cement concrete pavement in Km 1/250 to 1/350).
Periodical renewal on km. 88/150 of NH-07 to Harizan Basti Sainwala. (SH- Providing and laying 25mm. thick Bituminous concrete in km. 0/0 to 1/0 including profile correction). Under Annual Maintenance Plan for the year 2025-26. (PMGSY Road)
Periodical maintenance of NH-22 to Rali road Village road under Annual Maintenance Plan for the year 2026-27 SH- Providing and laying 30mm thick Bituminous Concrete including profile correction by providing and laying G-III 53 mm to 22.4 mm aggregate
Shifting of tower no T57 at Village Khera and tower no T03 and T04 at Village Bagbania of 66 kV S/C Barotiwala Nalagarh transmission line due to Four Laning of Pinjore Nalagarh NH under ES Division HPSEBL Nalagarh on turnkey basis
R/C of L/R from Bagheri- Gullerwala main road to Middle School Rampur Gujran and ST Basti, R/C of link road from panjehra Baroona road to Joghon via Basowal , R/C of link road from NH-21A to Jatta Bass Joghon.
A/R and M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH P/L GSB,G-I, G-II and Bitumen concrete in Km 135/230 to 135/290 and 138/150 to 138/240
Improvement of Black spot on C.M.M. road NH-205 Km. 86/0 to 127/0 (SH- Providing and fixing thrie metal beam crash barrier at Km. 105/370 to 105/405, 110/870 to 110/915 and 113/270 to 113/330).
Maintenance of four laning of End Pandoh bypass to Takoli Kullu Section of NH-21 (KM 222/700 to km 232/500) (SH- Providing and laying BUSG and 30 mm thick BC for patch work in km 222/500 to 227/600).
Restoration of rain damages on link road from main road (NH-503 Extension) to House of Fakir Singh ward No.01 village Upper Dehlan km.0.0 to 0.750 (SH Providing and fixing paver blocks at RD.0.210 to 0.365.50) (under PDNA Deposit)
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 53/000 (SH-C/o PCC R/wall at Rd 66/160 to 66/167 and B/wall at Rd , 83/420 to 83/435 (Under FDR 2023-24)
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274.610 to Km 287.000) in the state of Manipur on EPC Mode.