Loading…
Loading…
1,573 results • Best match
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 97/000 (SH. C/o Stone masonry B/wall at RD 55/200 to 52/220) (Under FDR 2023-24)
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 97/000 (SH. C/o Wire crate R/wall at RD 48/250 to 48/270) (Under FDR 2023-24)
Restoration of Road damages on NH 303 Km 00 to 3900 SH Providing and laying GSB WMM DBM and BC at Km 24545 to 24679 33405 to 33420 and 35825 to 35840 Deposit work
Restoration of rain damages on Chakki Banikhet Chamba Bharmour road NH 154A Km 39/0 to 106/0(n SH C/o R/wall at RD 100/740 TO 100/780 Under FDR2025 26
A.R and M.O on Sainj Luhari Anni Jalori Banjar Aut road NH 305 Km. 53.0 to 97.0 SH Providing and laying 50 MM thick bituminous macadam at various RDs in Km. 63.0 to 74.0
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 97/000 (SH. C/o Wire crate R/wall at RD 45/300 to 45/320) (Under FDR 2023-24)
A/R and M/O on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 106/0 to 172/0 C/o of PCC R/wall wall in Km 111/750 to 111/760.)
R O rain damages road leading to Lower Kanlog from NH 05 Rd 0 00 to 0 660 in ward No 34 Kanlog SH C O R wall Rd 0 130 to 0 145
Link road from NH 105 (New Khadi Ashram) village Kirpalpur. ( SH - C/o drain, Retaining wall AND RCC Hume pipe culvert and P/L 40 mm Bituminous Concrete over 50 mm Dense Bituminious Macadam ).
R O rain damages on road leading to Lower Kanlog from NH 05 RD 0 0 to 0 660 in ward No 34 Kanlog SH CO Rwall between RD 0 107 to 0 128
Restoration of Rain damages on NH.05 Km 236.000 to 368.000 SH. Hiring of hydraulic excavator with breaker for removal of slips/massive rock slides as and when required between Km 316.00 to 317.00
Road from NH 22 to Baba Balak Nath Temple Sangti RD 0 0 to 1 400 (SH Construction of Retaining wall B wall RD 1 300 to 1 400 in ward No 24 Sangti)
E Auction for Collection of Tehbazaari from approx. 450 Rehri Fadi Street Vendors Holders for one year within the jurisdiction of MC Baddi Except Baddi NH, State Highway, Baddi Sai Road on outsource basis.
Periodical Renewal Work from km.74 0 to 94 830 of Sainj Luhari Jalori Banjar Aut NH 305 under Annual Renewal Program ARP for the year 2020 21 in the State of Himachal Pradesh
Link road from NH-105 TVS factory Jhiriwala to Dhundali.( SH - C/o drain, Retaining wall AND RCC Hume pipe culvert AND P/L 40 mm Bituminous Concrete over 50 mm Dense Bituminious Macadam).
Restoration to Rain damages to NH 305 Km 0 00 to 97 00 SH Hiring of excavator cum loader for removal of Slip as and when required between Km 0 00 to 53 00
Dewatering and scientific deflection monitoring inside tunnel and other allied works at work sites of construction of road tunnel in left over work of Four Laning of KiratpurNerChowk Section of NH-21 Himachal Pradesh
(SH- Providing and laying 30 mm thick Bituminous Concrete in Kisanpura to Ganguwala road km 0/0 to 0/510 and 97/750 of NH-07 Bhattanwali to Kisanpura road via Patwarkhana Km 1/0 to 1/500 including profile correction)
Fire Safety Audit of BSPS
A/R and M/O on NH-305 Sainj Luhri Aut Road Km 0/00 to 97/00 (SH. Patch work with 30 mm BC in pot holes between Km. 0/00 to 23/00)
Construction of road from NH-07 to Salamatpur Behrampur road km. 0/0 to 1/520. (SH- Providing and laying G-III and 20mm premix carpet in km 0/240 to 1/520). Under MNP
C O B wall on Road from NH 05 Shanan to Baba Balak Nath Temple Rd 0 00 to 0 150 SH CO B wall RD 0 200 to 0 215 in ward No 24
Construction of Entry Gate on NH-70 at Km. 58/400 (Gagtet) Jallandhar Hoshiarpur Gagret Amb TauniDevi Awahdevi Sarkasghat-Manali road in the State of Himachal Pradesh (SH-Providing and installation of entry/ information gate)
Repair Restoration of rain damages on NH 70 to Panjoa Kalan road km 000 to 5000 SH Const of UShape drain at RD 3890 to 3940 RHS and RD 4030 to 4100 LHS DC Deposit
Restoration of rain damages on NH-05 Km 236/00 to 368/00 (SH- Construction of R/wall at Km 238/110 to 238/130 and 257/805 to 257/820) under FDR 2021-22.
A/R and M/O on NH-305 Sainj Luhri Aut Road Km 00/00 to 97/00 (SH- Tarring/patch work with 30mm BC in pot holes between Km 63/00 to 73/00).
Restoration of rain damages on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 106/0 TO 172/0 (SH C/o PCC R/wall at RD wall at RD 170/473 to 170/484.
Restoration of Damages caused by flood on dated 25th and 26th of August 2025 on various 5No locations to provide connectivity between NH 03 with Sainik Chowk Bhunter Mohal Ramshilla Naggar Manali road MDR 29
Ordinary repair on NH 707 Paonta Rajban Shillai Meenus Hatkoti Raod Km 0/0 to 105/0 (SH Providing and laying built up spray grouting at various location between Km 46/0 to 67/0)
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 00/00 to 78/00 (SH Hiring of excavator cum loader for removal of slips in Km 40/00 to 78/00
Restoration of Rain Damages on link road from Main road Harizan Basti Odder Via Crescent School and Panchayat Ghar upto NH KM 0/00 to 3/500 (SW - Repair of Pot holes in various roads)
A/R M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH P/L GSB,G-I, G-II Bitumen concrete in Km 133/400 to 133/565.
A/R M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH P/L GSB,G-I, G-II Bitumen concrete in Km 137/770 to 137/920
A/R and M/O Link road from NH-22 to Thangi Km 0/00 to 9/370 (SH- P/L correction layer of Grading II and III from Km. 5/00 to 9/370
Restoration of rain damages on Chakki Banikhet Chamba Bharmour road NH 154-A Km 39/0 to 106/0 ( SH C/o PCC R/wall at RD 95/960 TO 95/981 Under FDR2025-26
Periodical Maintenance of link road from NH-22 Km. 4020 to Ropa Khas under AMP for the year 2023-24 (PMGSY road)(VRHP0502VR0067211 301,, 302. (SH- Annual surfacing from Km. 0/00 to 2/00
Re-carpeting of Link road from NH-21A to Nikkuwal Km 0/00 to 1/00, Re-carpeting of link road from Shamshanghat Nalagarh via New Nalagarh to Gaguwal Km 0/00 to 2/600.
Ordinary repair to NH 72B Paonta Rajban Shillai Meenus Hatkoti road Km 0/0 to 161/715 (SH Repair of pot hole with bituminous concrete in various locations between Km 54/790 to 57/260)
Maintenance works and activities PBMC on NH 503 Extn Km 0 to 19 and 28 to 44 700 Amb to Dhusara and Four Lane Portion From Jhalera to Mehatpur in the State of Himachal Pradesh
Ordinary repair to Kala Amb Paonta Sahib Dehradun road NH 72 (New NH07) Km 46/00 to 103/00 (SH Construction of essential RCC U shape drain in Km 99/833 to 100/030 (RHS)
CO RW Thrie Beam, Crash Barriers, Signages from Katori Bangla to Chamba Km 39 0 to 106 0 including rectification of identified black spots 7 Nos of NH 154 A in the state of HP
Restoration of rain damages on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SHP/L GSB, G-I G-II and Bitumen concrete in Km 134/440 to 134/565
C/o Balance work link road NH-21 to village Kacholi in Km. 0/0 to 5/0 (SH- Providing and laying M.T. work and V-shape drain in Km. 4/060 to 4/850).
Improvement of C.M.M. road NH-205 Km. 86/0 to 105/0 (SH- Geometrics of road by providing ROFD and U-shape drain including Breast wall at RD 94/098 to 94/136) DC Deposit
damages Public path from NH 205 to mansa bhawan lower chakkar in ward No 9 Kachighati R D 0 0 to 0 45 (SH Construction of Retaining wall C C flooring and steel work etc)
Balance work of road leading NH-22 Bye Pass near Petrol Pump to Tilak Raj House in ward No 29 Vikas Nagar (SH Providing and Laying CC 1 4 8 and CC 1 2 4)
Restoration to Rain damages on NH 05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 246 000 to 247/500 248 500 to 251 500
Construction of Rain damages road leading to Bye Pass NH 22 near Block 42 to chauhan niwas at Dev Nagar in ward No 26 Panthaghati (SH Construction of Retaining wall and drainage of Nallah etc)
Special Repair to NH 305 Sainj Luhri Aut road km 0.000 to 97.000 S.H. Construction of wire crate Retaining wall at Rd 48.080 to 48.120 and wire crate Breast wall at RD 48.085 to 48.115
A/R and M/O NH-154 Banuri to Upper Jhaler, C/o link road Banuri to Bharmat to Upper Chandpur Km 0/00 to 1/500 (SW - Repair of Pot holes in various RDs)