Loading…
Loading…
1,573 results • Best match
R O rain damages on M C road leading to NH 05 from St Edward School 0 00 to 0 400 Kanlog in ward No 34 SH C O R wall
A/R and M/O on Nagrota Bagwan Ranital Mubarikpur road NH-303 km 0/0 to 39/0SH Construction of slab culvert 4.00 meter span culvert At km 3/360
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road Km 0/0 to 78/0 on NH 907A (SH Construction of PCC Retaining wall at RD 1/450 to 1/520)
Restoration of Rain Damages on Chakki Banikhet Chamba Bharmour road NH 154-A Km 39/0 to 106/0 C/o PCC R/wall AT Km 46/194 to 46/202
A/R and M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 39/0 TO 106/0 ( C/o P.C.C R/wall at RD 88/295 TO 88/305
Restoration of rain damages on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o 900 mm dia hume pipe culvert at RD 151/800.
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154-A Km 106/0 to 172/0 ( SH C/o R/wall of Km 106/470 to 106/495
A/R M/O on NH-70 (New 03) Km. 58/400 to 196/495 (SH Providing and laying Bituminous Concrete in different reaches in Km. 163/00 to 180/00)
Construction of retaining wall below the bus stand from joint of NH and churi bridge to river bend in downstream in front of TRT outlet at Dharwala (E-office no. 115340)
C O ambulance road from NH Bye pass to Garwhal Sabha Rd 0 00 to 0 200 in ward No 12 Phagli SH Formation cutting R wall and B wall etc
Construction of Parking between old and new bridge Shimla Kangra NH 103 at Ghumarwin District Bilaspur HP SH Supply drilling and fixing of 25 mm diameter reinforcement bars with chemical anchoring
C O ambulance road from Deepak Project NH 205 to Tulsi Ram House ward No 9 Kachighati SH CO R wall at RD 0 456 to 0 471 near RM Sharma
Custom Bid for Services - Custom Bid For Services - Architectural Services Inclusive Of Periodic Supervision And Continous Supervision Shimla RO, Custom Bid for Services - Custom Bid For Services - Architectural Services Inclusive Of Periodic ... for NHAI Project ... for NHAI
Convection Heaters - Room Heater, Blower (Q3) (3 (3 ))
Canvas Bag (V2) (Q4) ( ( 3 3 ))
providing and laying 50mmthick dense graded bitumen macadam nd 30mm thick marking of center line
R O rain damaged ambulance road from NH 22 to Gorku Lodge below block No 12 in ward No 22 Kasumpti SH C O R wall RD 0 400 to 0 418
A/R and M/O on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 39/0 to 106/0 C/o P.C.C R/wall at RD 84/715 to 84/723.
Restoration of rain damages on road from NH 22 to Tenzin Hospital RD 00 to 1500 mtr SH CO Rwall in ward No 26 Panthaghati length 25 mtr and height 6 mtr
Restoration to Rain Damages on NH 05 Km 236 00 to 368 00 SH Hiring of hydraulic excavator for removal of slips massive rock slides between Km 245 00 to 246 00
R R Damages on MC Path from Lal Kothi to NH Bye Pass at ward No 12 Phagli SH PL C C 1 2 4 at RD 0 00 to 0 080
Restoration of rain damages on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 106/0 to 172/0 (SH Construction of PCC Retaining wall at RD 164/610 to 164/635
Restoration to Rain Damages on NH-05 Km 236 00 to 368 00 SH Hiring of hydraulic excavator for removal of slips massive rock slides between Km 245 00 to 246 00
Restoration of rain damages on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 106/0 TO 172/0 (SH Construction of PCC Retaining wall at RD 165/399 TO 165/405.50
Restoration of rain damages on Chakki Banikhet Chamba Bharmour road NH 154A Km 39/0 TO 106/0 SH PL Interlocking paver block Km 101/744 to 101/792 ( water logged portion.
Restoration to Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Hiring of hydraulic excavator for removal of slips. massive rock slides between Km 3.00 to 8.00.
C/o Som Kunj Circuit House Building at Palampur Distt Kangra (HP) (SW - Providing laying soling and Wearing in link road NH-154 to Circuit House Km 0/00 to 0/480)
Periodical maintenance of NH-22 to Village Ralli under Annual Maintenance plan for the year 2021.22 SH. Providing and laying 20mm thick premix carpet and seal coat in km 2.0 to 3.0
A/R and M/O on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 39/0 to 106/0 C/o P.C.C R/wall at RD 88/905 to 88/912
A/R and M/O on Nagrota Bagwan Ranital Mubarikpur road NH-303 km 0/0 to 39/00 (SH. C/O Slab culvert of 1 meter span at km. 27/180
A/R and M/O on Chakki- Banikhet Chamba- Bharmour road NH-154-A Km 39/0 to 106/0 C/o P.C.C R/wall at RD 80-230 to 80-240
Construction of Road Leading to NH 22 Bye Pass near Block 42 to chauhan Niwas at Dev Nagar (SH Construction of Retaining wall at car parking steel work) in ward No 29
A/R and M/O on NH-70 (New 03) Km. 58/400 to 196/495 (SH Providing and laying Bituminous Concrete in different reaches in Km. 137/450 to 163/00)
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154-A Km 106/0 to 172/0 ( SH C/O P.C.C R/wall at RD 133/220 TO 133/235
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/0 to 78/0 (SH Construction of U-shape drain in Km from 9/800 to 10/550)
Restoration of rain damages on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 39/0 to 106/0 (SH Construction of PCC Retaining wall at RD 51/861 to 51/868
A/R and M/O on Nagrota Bagwan Ranital Mubarikpur road NH-303 km 0/0 to 39/00 (SH C/oB/wall with pusta at km 14/685 to 14/715)
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o wire carte R/wall at RD 42/400 to 42/410
Restoration to Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Hiring of hydraulic excavator for removal of slips. massive rock slides between Km 0.00 to 2.500.
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o wire carte B/wall at RD 42/195 to 42/410
Special repair of Nerchowk Pandoh bypass road (Section of NH-21) Km. 198/145 to 203/500 (SH Balance work of providing gratings at ISBT Mandi entry point at Km 200/240)
Estiamte for providing SOP on 11 KV To EV Charging Station at m/S Muraru Mata Feeling Station at villlage Jarol on NH-154 Tehsil Sundernagar Distt Mandi under ESD HPSEBL Sllaper.
Periodical maintenance of NH-22 to Village Ralli under Annual Maintenance plan for the year 2021.22 SH. Providing and laying 20mm thick premix carpet and seal coat in km 0.0 to 1.0
Maintenance of NH-205 from km.0/000 to 43/000 on Shimla Mataur road for the year 2025-26 (SH-C/O R/wall from km.1/850 to 1/870)
Maintenance of Four laining of End Pandoh by pass to Takoli Kullu section of NH-21 Km 222/700 to 227/600 SH- Earthwork in Filling at 223/400 to 223/500.
A.R M.O NH-05 from Km. 236.00 to 368.00 SH. Construction of Breast wall in PCC at RD 297.240 to 297.255 and V-shape drain in PCC at R.D. 297.240 to 297.300
Restoration to rain damages on Theog Kotkhai Hatkoti road 0.0 to 69.0 SH C.o R.wall in PCC M15 at RD 26.195 to 26.227
A/R and M/O on Chakki Banikhet Chamba Bharmour Road NH 154 A Km 39/0 to 106/0 (SH C/o PCC R/wall at RD 51/845 TO 51/853.
R/R damages on NH-305 Sainj Luhri Aut road km 0/000 to 97/000 (SH. C/o PCC R/wall at Rd 60/540 to 60/550) (Under FDR 2023-24)
Restoration of road damages caused due to laying of OFC on NH 503 A at Km 00 to 70000 SH Hiring of excavator cum loader Tipper in Km 20000 to 35750 Deposit work