Loading…
Loading…
1,572 results • Best match
C O Ambulance Road from NH 205 to Kamna Devi Kamna Nagar Ward no 8 B ganj RD 0 450 to 0 950 SH Providing and laying soiling work etc
Restoration to Rain damages to NH 05 Km 23.00 to 368.00 SH Hiring of excavator cum loader for removal of Slip as and when required between Km 280.00 to 307.00
Rehabilitation /Landslide Mitigation of Kangra Airport West and NH 154 Road Slope Stabilization village kuthman Tehsil Shahpur Distt. Kangra (H.P) (Construction of Reinforced soil wall (R.S. Wall) on downstream side)
Engagement of user fee agency on the basis of EQ through etender for Shekhpura FP at km.117.200 for the sec of Maur to Roman Mandi sec from Km.105.890 to Km132.300 of NH254 in Punjab
Engagement of user fee agency through e-quotation for six Lanning of Mandi Dabwali (Punjab/Haryana Border) - Chautala Road Section from Proposed Mandi Dabwali Bypass in Haryana and Punjab
Engagement of user fee collection agency for Abul Khurana fee plaza at km 11.150 for the use of four lane of Malout Mandi Dabwali Section from km 7.000 to km 29.500 of NH9 in the state of Punjab
Engagement of user fee agency through EQ for six Lanning of Mandi Dabwali Punjab Haryana Border Chautala Road Section in Haryana and Punjab
Engagement of user fee agency through EQ at Baloh FP at km 121.935 for the use of Kiratpur Nerchowk Manali sec from Km. 119.965 to Km 178.795 and Km 0.000 to Km 2.003 of NH21 (Now 205 and 154) in Himachal Pradesh
Engagement of user fee agency through e-quotation for six Lanning of Mandi Dabwali (Punjab/Haryana Border) Chautala Road Section from Proposed Mandi Dabwali Bypass (Design CH. 27.00) to Chautala in the state of Haryana and Punjab
IE Services for (1)Construction of 4 laning of NH5 from Kaithlighat to Shakral Village (PKG I from Km 128.835 to Km 146.300 ) in HP on HAM (2) Construction of 4 laning of NH5 from Shakral Village to Dhalli Sec(Shimla Bypass PKG II) in HP on HAM
Engagement of user fee collection agency on the basis of CB through e-tender for Beer Mandi Fee Plaza at Km 27.700 of Darah-Jhalawar-Teendhar section in the State of Rajasthan
Construction of New Four Lane of Sundarnagar Bypass from Exiting Km. 173.900 to Km. 179.600 of NH21 (Design Chainage Km. 0.000 to Km. 6.680) in the State of Himachal Pradesh on EPC Mode
6Laning of Mandi Dabwali (Punjab/Haryana border) Chautala road section from Proposed Mandi Dabwali Bypass (Design Ch. 27.400) to Chautala (Design Ch. 62.200) of NH54 under BP (designed length 34.800) in Haryana under Hybrid Annuity Mode
Consultancy Services for preparation of DPR for MDR-29 Ch.2.530 (end point of Takoli-Kullu section ) to Ch.41.375 (end point of Kullu-Manali Section) in state of Himachal Pradesh
AE Ser for Const. of Flyover for LT Recti. of 4 MoRTH Identified BS at Jolhupur junc at Km.1534.215 Chaura Bakra Mandi at Km1544.300 Patel Chowk junc at Km1556.285 n Premium Factory Kota junc at Km1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Construction of 4 laning of NH5 from Shakral Village to Dhalli Section (Shimla Bypass Pkg2 from Km 146.300 to Km 156.560 and Shimla connectivity from Km 0.000 to Km 0.725 for Design Length 10.985 km) in Himachal Pradesh on HAM
Development Operation and Maintenance of Ropeway from Nature Park(Mohal) to Bijli Mahadev Temple in District Kullu in Himachal Pradesh on HAM.
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
CSfor DPRDevelopment of KathuaBhasoli Bani Bhaderwah Doda stateroad to connect NH44with244 to 4lane andBhaderwah Chamba as ext. to NH154A to connect NH244 to4lane andTawi Bridge4thSatwari-Jammu Airport Miran Sahib-R.S Pura-Suchetgarh Road to 4/6 lane
Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode
IE services for Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500, km 126.500 to km 158.500 including ACC link road from km 0 to km 2.003) Greenfield Alignment (Pkg2) in Himachal Pradesh on HAM.
Cons. of Long Term Remedial measures of River cut/bank erosion at identified 12 locations (i.e. RC-18 A-RC-22 RC-20 A-RC-25 A-RC-26 A-RC-24 A-RC-19 A-RC-20 and A-RC-21 RC-21 RC-23 RC-25) KULLU TO MANALI on K-M Sec. of NH03 (OldNH21) in HP on EPC
IE for Dev of 6ln Amrit Bathind GF sec of NH754A from Bhagta Bhai Ka Bhadaur Rd Dyalpura Bhai Ka to jn. with Mandi Dabwali Bathind Rd on NH54 near Sangat Kalan from 93.000 to 154.866 as a part of Amrit Jamnagr EC in Punjab on HAM under BMP Ph1 Pkg3
Development of 6_lane Amritsar Bathinda Greenfield sec of NH754A to junction with Bhagta Bhai Ka Bhadaur Road near Mandi Dabwali Bathinda Road on NH54 near Sangat Kalan as a part of AmritsarJamnagar in Punjab on HAM under BP PhaseI (Pkg3)
Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500 km 126.500 to km 158.500 including ACC link road from km 0.00 to km 2.003) Greenfield Alignment (Package2) in the State of Himachal Pradesh on HAM.
AR and MO on NH 03 left out portion NH 21 at Patlikuhal road
Annual Maintenance Plan for the year 2021 22 for Old NH 22 to Parwanoo road in Km 62 200 to 67 200 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km 62 00 to 67 00
R/R damages on NH-05 Km 236/00 to 368/00 (SH. filling pot holes and patch work with bituminous concrete with 40mm between km 245/00 to 254/00).
Restoration of Rain Damages on Chakki Banikhet Chamba Bharmour road NH 154-A Km 39/0 to 106/0 C/o PCC R/wall AT Km 59/646 to 59/656
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/0 to 78/0 (SH Construction of PCC retaining wall at RD 58/886 to 58/903)
Ordinary repair to NH 72 B Paonta Rajban Shillai Meenus Hatkoti Road Km 0/0 to 161/715 (SH Repair of pot holes in between Km 96/200 to 105/0)
Improvement of black spot on link road from NH-22 to Ropa Khas Km. 0/00 to 15/850 (SH- P/F W-metal Beam Crash barrier at various essential reaches
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH- Providing and laying 25mm thick mastic asphalt wearing course on Panvi-1st bridge Km. 334/140)
Restoration of rain damages on Chakki Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 C/o P.C. C R/wall at RD 159/645 TO 159/656
A/R nd M/O link road from NH-03(Jia) to Shankergarh km 0/00 to 1/00 (SH-Construction of Retaining wall between RD 0/155 to 0/175
Ordinary repair to Kala Amb Paonta Sahib Dehradun road NH 72 (New No. 07) Km 46/00 to 103/00 (SH Providing white washing from RD 66/00 to 80/00)
A/R M/O on Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 ( SH C/o P.C.C R/wall at RD 60/465 to 60/470
A/R nd M/O Link road from NH-03(Jia) to Shankergarh km 0/00 to 1/00(SH- Construction of Retaining wall between RD 0/120 to 0/132.50
Restoration of Rain Damages on Chakki Banikhet Chamba Bharmour road NH 154-A Km 106/0 to 172/0 C/o PCC R/wall at RD 158/704 to 158/716
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH- Providing and laying 25mm thick mastic asphalt wearing course on Panvi-2nd bridge Km. 335/570)
Restoration of rain damages on NH-303 Nagrota Bagwan Ranital Mubarikpur road Km 000 to 91000 SH Construction of Ushape drain in km 16105 to 16190 and 16210 to 16330 RHS
A/R and M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 (C/o P.C.C R/wall at RD 153/415 TO 153/423
C O Ambulance road from NH 205 to Kamna Devi ward No 8 Boileauganj upper Chakkar Km 0 00 to 0 625 SH Formation Cutting Rd 0 450 to 0 625
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/0 to 78/0 SH Construction of PCC retaining wall at RD 58/886 to 58/903
Periodical Maintenance of Link road from NH-22 to Thangi (Under Annual Maintenance Plan for the year of 2022-23 (PMGSY Road) (SH- Annual surfacing from 5/00 to 9/370
A/R and M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 C/o P.C.C R/wall at RD 170/110 TO 170/127
Land Slide Mitigation including Slope Stabilization at Km 316.880 to Km 317.250 near Nigulsari and Km 330.350 to Km 330.560 near Nathpa on NH 05 in the State of Himachal Pradesh
C O Ambulance road from NH 205 to Kamna Nagar Chakkar RD 0 00 to 0 450 SH C O Protection wall RD 0 390 to 0 405 ward no 8
Ordinary repair to Nahan to Do Sarka Sarahan Kumarhatti road on NH 907A Km 0/00 to 78/00 (SH Repair of Pot hole between Km 0/00 to 5/00)
A/R and M/O ON Chakki- Banikhet Chamba Bharmour road NH 154A Km 106/0 to 172/0 (C/o P.C.C R/wall at RD 160/220 TO 160/242