Loading…
Loading…
1,572 results • Best match
MC road from NH 22 to Lajwanti path in ward No 9 Kachighati (SH Providing and Laying CC 1 2 4 and 1 5 10 with plum etc)
A R and M O NH 305 Km 0 00 to 97 00 SH M T work including correction of base in Km 83 380 to 84 620
Balance work of NH-07 to Ganguwala road km 0/0 to 0/895.(SH-Providing and laying interlocking tiles at RD 0/860 to 0/895).underMMSY.
Development of A Site RO Development of A Site RO UPMOHAL BASOLI UPARLI TEHSIL UNA ON NH 503A District Una HP Area1 under Shimla DO of Punjab State Office
C O Ambulance road from NH 205 to Kamna Nagar Upper Chakkar RD 0 00 to 0 450 SH C O protection wall RD 0 405 to 0 420
Recarpeting of road from NH-105 to Mondelege India Foods and Pearl Polymers, Sandholi (SH-C/o Drain, P/L WBM and 40mm thick BC over 50mm thick DBM)
Construction of path from Chandel Niwas to Khajan Singh house then up to NH 22 RD 0 0 to 0 190 1st phase in ward No 22 Shanti Vihar
Restoration of road damages caused due to laying of OFC on NH 70 New NH03 Km 58400 to 11400 SH Repair of Ganrty Board on Km 66095 Deposit work
Restoration of road damaged caused due to laying of OFC on NH 70 New NH03 Km 58400 to 11400 SH Repair of Ganrty Board on Km 64210 Deposit work
MC Road from NH 22 to Jagat House R D 0 0 to 0 680 in ward No Kachighati (SH Construction of V Shape drain and steel work etc)
Development of new A site RO at Within 3 kms of Hotel Shagun, from Nalagarh towards Swarghat, on Nalagarh-Swarghat Road (NH 105) Distt. Solan under Shimla DO, PSO.
Periodical Renewal of Chakki Banikhet Chamba Bharmour Road NH 154A from Km 39 0 to 65 0 and km 76 0 to 84 0 in the State of HP
Link road from NH 105 near Aakash Hospital to Chowkiwala via new Nalagarh. (SH -C/o Drain and P/L WBM and 40mm thick BC over 50mm thick DBM)
Restoration of Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Construction of Breast wall in Random Rubble Masonry at RD 73.030 to 73.045
Construction of various Path ward No 24 Sangti (i) Path from NH 22 to MIG 15 (ii) Path from Lower Sangti H B C Mehta niwas to Sharma Niwas
Periodical renewal work from Km. 63/0 to 74/0 of NH-305 in the state of Himachal Pradesh - under Annual Renewal Program (ARP) for the year 2019-20.
Development of A site RO at Sarahan Kalan, Between Kilometer Stone No. 40 to 42 on Right Hand Side towards Kumarhatti (NH 907A), Distt- Sirmaur under Shimla DO, PSO
Development of New A site RO within 3 Kms of Manglor on NH-305, Village Ratwah (Manglor) on Banjar-Aut Road, Tehsil Banjar, Distt. Kullu (H.P.) under Shimla DO.
Construction of PCC retaining wall in gabion structure at RD 144/583 to 144/601 near old barrier Shimla against NHAI deposit
Beautification of Parwanoo town by constructing drain with edging and PCC on footpath on Old NH between Rd. 63/870 to 64/270.(SH- C/O PCC drain with edging and CC interlocking pavers on berms)NCAP
RR Damages to Kala Amb Paonta road km 46/0 to 103/0 on NH 72 New NH No.07 ( SH C/O PCC RW from RD 73/525 to 73/540.50 and C/O PCC BW at RD 70/120 to 70/140 70/368 to 70/400 70/730 to 70/760 70/980 to 71/040 (RHS) and 73/645 to 73/660 (LHS)
Restoration of rain damages on NH-503A Km. 0/0 to 70/0 (SH C/o B/wall at RD 55/650 to 55/730 (RHS), 56/900 to 56/965 (LHS), 57/810 to 57/875(LHS), 64/500 to 64/550 (RHS) and R/wall at RD 42/820 to 42/835 (LHS) (Job No. RO-HP-NH-305-2021-22-009)
Providing and fixing road furniture for road safetypurpose i.e.sign boards, Road studs and delineators on NH-05 km.131/000 to 145/100 and 0/000 to 13/000 on Shimla Bye Pass
Development of A Site RO-Within 2 Kms from DAV Public School Kumarhatti on LHS towards Solan on NH 05, Dist-Solan, HP, under Shimla DO of Punjab State Office
A/R and M/O on NH-305 Sainj- Luhri- Aut Km 0/00 to 53/00 (SH. M/T of road portion at RD 47/900 to 48/220.
Restoration to Rain damages on NH.305 Sainj Luhri Aut Road Km 0.00 TO 97.00 SH. Hiring of excavator cum loader for removal of Slip between Km 0.00 TO 31.00.
Restoration of rain damages on Chakki- Banikhet Chamba Bharmour road NH 154A Km 39/0 to 106/0 ( SH C/o Gabion wall at RD 64/598 TO 64/660
Restoration to Rain damages on NH.305 Sainj Luhri Aut Road Km 0.00 TO 97.00 SH. Hiring of excavator cum loader for removal of Slip between Km 0.00 TO 31.00.
Restoration of rain damages on NH-05 Km 236/00 to 368/00 (SH- Construction of PCC R/wall at Rd 278/235 to 278/260) under FDR 2022-23
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 97/00 (SH- Widening/ improvement of curve at RD 21/840 to 21/960)
Restoration of rain damages on NH-907A Km 0/00 to 78/00 (SH C/o PCC R/wall at RD 3/285 to 3/305) Under FDR 2023-24
Restoration to Rain damages on NH 05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 280 00 to 286 00
Restoration to Rain damages on NH 05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 288 00 to 296 00
C/o Retaining wall from NH 105 to Fouji colony road G.P. Kishanpura, C/o Retaining wall on Salera road towards village Nalka G.P. Sanerh, ( SH - C/O Wire Crates )
Restoration of rain damages on NH-05 Km 236/00 to 368/00 (SH- Construction of PCC R/wall at Km 258/260 to 258/279) under FDR 2021-22.
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH- Providing and laying 25mm thick mastic asphalt wearing course on Kaksthal bridge Km 337/031)
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH. Construction of R/wall RR Masonry at Memorial Park at Jeori at RD 298/160).
Strengthening and improvement of road including road safety items from Km 334/00 to Km 337/140 on NH-05 22 in the State of Himachal Pradesh on EPC mode
Development of new A site RO - Between KM stone no. 14 AND 17 on left hand side on Kiratpur-Ner Chowk Expressway -NH 205, District Bilaspur under Shimla DO, PSO
A/R and M/O on NH-05 Km 236/00 to 368/00 (SH-Construction of R/wall along with steel dowels at RD 324/403 to 324/413).
Resurfacing of MC Road from NH 22 Byepass to Bakhrai Temple Malyana ward No 25 0 00 to 0 650 SH P/L B C 30mm and B M etc
CA NO CE CHZ CHM T 06 2024 25 PROVN OF RETAINING WALL DRAIN ROAD AND ALLIED INFRASTRUCTURE ALONG THE ROAD FROM NH 5 TO PATTA KA MOR AT DAGSHAI
A.R. and M.O. on NH-305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. filling pot holes and patch repair with bituminous concrete 30mm between Km. 0.000 to 23.000
A/R and M/O on NH-305 Sainj- Luhri- Aut Km 0/00 to 53/00 (SH. M/T of road portion at RD 44/400 to 45/00)
Providing and Laying pipeline from TRT/NH road junction towards Jarangla nallah(RD 0.0 to 2225m) in phase-1, Chamera-II Power Station, Karian, Chamba (H.P.) (Pkg. No. C-776)
Construction of link road from NH-707(Gangtoli) to Kunhat km. 0/0 to 5/0(SH-Formation cutting 5/7 mtrs. Wide road km. 0/915 to 1/855)
Restoration to Rain damages on NH-05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 257 500 to 267 00
Restoration to Rain damages on NH 05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 297 00 to 298 00
Restoration to Rain damages on NH 05 Km 236 00 to 368 00 SH Hiring of excavator cum loader for removal of Slip between Km 307 00 to 322 0
Rehabilitation /Landslide Mitigation of Kangra Airport West and NH 154 Road Slope Stabilization village kuthman Tehsil Shahpur Distt. Kangra (H.P) (Construction of Reinforced soil wall (R.S. Wall) on upstream side)