KIIFB Vandazhy Kizhakkenchery Vadakkenchery and Kannambra Phase II Supplying and Laying distribution network in Low level zone Kannambra grama panchayath zone 6 (Pipe line after NH crossing at Diana ) Package II Part II Pipeline Work
JJM-CWSS to Thazhekkode and Alipparamba Pt - Additional Pipe line Extension, providing FHTCs and road restoration of NH, PWD and Panchayth Road for Package 1,2,3-Re appropriation -Additional Pipe line Extension, FHTCs and road restoration
SLTF Providing 40mm CC to Old MS Road toNH 2020 2021 Ch 0 000 to 0 800 Providing40mm CC to Old MS Road to NH 2020 2021Ch 0 000 to 0 800 General Civil Work
GENERAL Improvements to road and construction of CC Drain in Old NH Valapattanam road ch 0/650 to 2/235 and Passenger approach road Ch 0/000 to 0/235 Km work General Civil Work
Urgent Traffic safety works 2019-20 Widening and smoothening reverse curve to avoid frequent accident in Vattapara Black Spot at NH 66 B/W km 306/500 and 307/140 in Valancheri in Malappuram Dist.
S.394/27, Kochi Corporation Vyttila Zone - Div 45 - New year lane, Durgadas bylane, Thekkechira lane, Asan cross road, October road, Andippilly bylane, Durgadas lane, Kottappuram bylane, Vyttila Vyloppilli NH connection road, Ramakrishna Prabhu lane
Construction of drain in the road from Chavakkadu bypass to Orumanayoor.
GENERAL Traffic safety Providing Hand Rail at the second viewpoint of the Ghat portion Between KM 54 050 and 54 /360 And Berm protection at 50 /900 and 51/100 of NH 766 General Civil Work
KIIFB- improvements to WSS of Kondotty Municipality-Phase-II-Package III A - Laying Balance Distribution system and Transmission main along and across NH 966 Via HDD including supply of all materials, Working Charges and road restoration
Short Term Safety Measures for 3 Nos. Accident Blackspots in Mandakalli Km 203.050 Bandipalya Junctions Km 205.200 Duddagere Puttegowdana Hundi Km 225.300 in Kerala Border to Kollegala Section of NH-766 in the State of Karnataka
Long Term Remedial Measures at Muguru Dodda Aladamara to Kumar Farm and Tirumala Tower to SVP Nagar on Kerala Border to Kollegala section on NH766 Old NH 212 in the State of Karnataka under EPC mode
GENERAL-NH 183 A-Pre-monsoon work 2023-24-Clearing side drain, Jungle clearance and cutting dangerous branches of trees and dangerous trees from Ch 0/000 to Ch15/800 ( Bharanikkavu to Nellimootilpadi )-General Civil Work
Improvements and maintenance of road
Premonsoon 2022-23- monsoon precautionary work etc in NH183 from ch 185/500 to 215/480 (except ch 205.180 to 210.900)
Patch plastering on damaged portion of walls Painting on shabby walls after scrapping out old paint Laying rectified glazed ceramic floor tiles in
GENERAL-Providing boards -Providing boards showing DLP and other details in the NH66 stretches and roads included in the CRF scheme -General Civil Work
DRAIN CLEANING
Handling and Transport on Lumpsum Basis - Handling And Transport On Lumpsum Basis - Mechanical Loading And Transportation Of The Tails From IREL Chavara HUP Tails Yard/MSP Tails Yard To The Designated Location Of NH - For 1500 trip
GENERAL NAVA KERALA SADASS 2024 25 Drain Work in Edappally Amrutha Hospital road Denankulangara Kacherippadi road Chittoor Cherannalloor road and Old NH 17 Edappally Cheranelloor Road Phase 2 in Ernakulam LAC in Ernakulam District Civil work Gene
LAC-ADS-Construction of Bus Shelters at various places in NH 744 under Ezhukone Section, Kottarakkara LAC -1 Neduvathoor Junction 2) Plamoodu Junction 3) Killoor Junction (Neduvathoor GP) 4) Ambalathumkala East 5. Cheerankavu Junction 6.Kolannoor Ju
Mace of CWSS to Oachira, Karunagappally, Alappad and Clappana- Clearing the site of WTP Oachira, Stacking the existing scattered materials at WTP Oachira, Conveying and stacking of material from Kambinipadi Mavelikkara and in NH 66 (Oachira - Karunag
Short Term Safety Measures for 7 nos Accident Blackspots Muddanahalli, Hullalli, Basavanapura Gate, TVS Circle Junction, Gargeshwari, Rice Mill Road, Muguru cross road in Kerala Border to Kollegala Section of NH-766 in the State of Karnataka
Construction of Retaining wall and drain
Deposit work 2019 20 Restoration of road cutting by KSEB in Palarivattom Kumarapuram road ch 0 000 to 0 710 NH Deviation road Ch 0 300 to 0 600 Aluva Ernakulam road Ch 345 000 to 345 300
DEPOSIT-Kozhikode Palakkad NH 966 km 133 720 to 140 960 - UPR 2023-24-Urgent Patch Repair works between km 133 720 Thanavu to 134 830 Olavakkode Junction and Km 135 650 to 135 800 -General Civil Work
Independent Engineer services during Operation and Maintenance period of 6-laning of Vadakkechery-Thrissur section of NH-544 from Design Ch. 236.135 to Ch. 264.490 in the State of Kerala under NHDP Phase-II on DBFOT (Toll) Basis
DEPOSIT-Deposit -AMRUT 2.0-Palakkad Municipality- Providing new house connections and carrying out works in pipelines to improve water supply levels in connections Kunnathurmedu and stadium court road - Part 2 - -Restoration work in OLD NH road Km 20
A.Consultancy services as Independent Engineer during Operation and Maintenance for the project Four laning of Kundapur-Surathkal section n Mangalore to Kerala Border and Mahaveer Circle to Kerala Border and NMPRCL section.
Long Term Rectification of 20 Nos. of MoRTH Identified Blackspots through widening of the carriageway and Junction improvement measures on NH766 section from Kerala Border to Kollegal in the State of Karnataka
Road Works
RE TARRING
Road Maintenance
EPC CONTRACT
RE TARRING
COLD IN PLACE RECYCLING
ROAD CONCRETE WARD-12
GSB,WMM,BM,BC,ROAD SAFETY
Retarring
ROAD SAFETY WORK AT KVMS JUNCTION IN NH 183
DEPOSIT-Restoration works in Old MS Road to NH
GENERAL-Zone IV- Premonsoon Works Premonsoon work 2022-23 Urgent patch repairs using ready mixed bituminious compound, cutting and clearing branches of trees,clearing Ventway of culverts in Manjali loop road Ch. 0/000 to 1/700, Old NH 17 Moothukunna
DEPOSIT Kozhikode Palakkad NH 966 km 133 720 to 140 960 UPR 2023 24 Urgent Patch Repair works between km 140 300 Kalmandapam Jn to 140 960 Chandrannagar and Km 136 830 to 137 062 Chunnambuthara Service road General Civil Work
JJM-2020-21-VAZHOOR PANCHAYATH-KOTTAYAM DISTRICT-Phase I-Package 2-SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK FROM CHALLOLI GLSR ALONG NH 183 FROM 14th MILE-KODUNGOOR-19th MILE AND PROVIDING FHTCs IN VAZHOOR PANCHAYATH PHASE-II ZONE -3
KWA Revenue-RWSS to Chavara-Panmana-Demolishing and re-construction of office building for widening of NH including section store,vehicle and waiting shed,lifting and stacking of ,DI GI pipe at Kadappa O H.Tank site in Thevalakkara panchayath. -Gener
NH 66 (47) Pre-monsoon 2020-21- Clearing side drain, culvert, cutting of branch of trees and trees in dangerous condition between Km 502/800 to 506/000 (Mevaram Kottiyam) and 511/000- 514/100 (Chathannoor- Spinning Mill ) filling potholes using
SLTF 2019-20 - Urgent BT patch repairs to FMK Road 0/000 to 4/000, Old NH Feroke Road 1/700 to 2/570, Feroke Petta - Farook College Road, Farook College- Karad Road and urgent repairs to Areekkad-Olavanna road
GENERAL KS ANNUAL ACTION PLAN 2022 23 MP LBC Removal of obstructions and providing arrangements for ensuring smooth water distribution, placing name board in all NH, SH, MDR, ODR major junction, cutting of dangerous branches trees and other works o
Construction of Six Lane Flyover at Km. 378.220 with Four Lane Approaches and Service Road for Permanent Rectification of MoRTH identified blackspot ID KL.02.206 , KL.02.207 on Kochi Kollam section of NH 66 in the state of Kerala Package 6
Independent Engineer Services during Operation and Maintenance of 6-laning of Vadakkanchery to Thrissur section of NH-544 including Kuthiran Tunnel from Design Ch.236.135 to Ch.264.490 the State of Kerala under NHDP Phase II on DBFOT(Toll) basis