Loading…
Loading…
1,800 results • Best match
Consultancy Services for preparation of DPR-Feasibility Report for upgradation to 6-8 laning of Aroor to Thuravoor Thekku section of new NH-66 (from Km. 358.750 to Km. 379.100 of Old NH-47) (Length 13 Km) under BMP in the State of Kerala
Six Laning of Thalapady to Chengala section of NH-17 New NH-66 from Ch. 17.200 existing km 17.200 to Ch. 56.200 existing Km 57.200 Total length 39.00km in the State of Kerala on HAM under BMP in the category of residual works under NHDP
IE services for 6-Laning of Azhiyur to Vengalam section of NH-17 (New NH-66) from Des.Ch.189.200-Des.Ch.232.100 except 6 laning of Paloli to Moorad section from Des. Ch.203.000-Des.Ch.205.100 in the State of Kerala on HAM under BP
Short Term Improvements and Routine Maintenance Work of Four Lane NH Connectivity to ICTT Vallarpadam Stretch between Kalamassery to Vallarpadam Section of NH 966A in the State of Kerala for a period of one year-2nd call
G TRAFFIC SAFETY ITEMS TO NH 183 A FROM CH 89.100 to 103.00 KANAMALA TO ERUMELI
Consultancy services of AE for Rectification of 12Nos BA spots in the stretch of Walayar-Angamaly Section of NH-544 and 4-Nos BA spots in the stretch of Thiruvananthapuram section of NH-66 under Annual Road Safety plan for 2023-2024 in Kerala on EP
RFP for Construction of 6 lane Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH-66 from Km. 366.330 to Km. 379.082 of NH-66 under BMP in the State of Kerala on EPC mode
GENERALOld NH 66 Supplying Cold mix compound SHELMAC for pothole fillingin Alappuzha and Kollam districts and various roads under NH Division Kollam General Civil Work
Deposit NHAI- Construction of drainage in shakthikulangara temple road - construction of drainage div 2-General Civil Work
NH PRECAUTIONARY WORK JUNGLE CLEARANCE SIDE DRAIN DRAIN CLEARANCE CLEANING OFF CHOCKED CULVERT AND CUTTING OF OVERHANGING BRANCHES ETC FROM CH 89/00 TO 103.00
This estimate is prepared for concreting NH Thundiyil road in ward 20.Many families use this footpath to enter to National highway. At present this footpath is poor in condition hence it is necessary to improve the condition of foot path
RETENDER-2 construction damaged culvert at ch 129/415 in NH 183 in the state of kerala
Pre-monsoon 2023-24 NH 183 Kollam Theni road Monsoon Precautionary work jungle clearance cleaning of chocked culvert and cutting of overhanging branches etc from ch 136.600 to 160.00
Net Fencing at the side of NH
DEPOSIT6Laning ofThalikulam toKodungallursection of NH-66-Improvement of NH66-NHAI Chainage-370/400 to 374/100(Thriprayar Byepass), 376/650 to 378/640Chentrapini Byepass), 381/680 to 384/320(Moonupeedika Byepass), 385/240 to 390/020
GENERAL-NH 66 (Old NH)-General - NH -66 Supplying cold mix Compound (SHELMAC) for pothole filling in NH 66 (old NH) from Km 489/000 502/800 ( Altharamoodu to Mevaram) and various roads under NH Division, KollamGeneral Civil Work
Annual Plan-148/25-26 Thrikkur GP Net Fencing at Thrikkur Grama Panchayath NH side to prevent waste disposal - 3rd phase--General Civil Work
Urgent Maintanance Work to NH 966 from km 18/050 to km 40/000-Urgent Maintanance Work to NH 966 from km 18/050 to 40/000
NH 66(Old NH 47)Re surfacing of CH 444/000 TO 462/000(Harippad Madhava Jn to Krishnapuram) on NH 669oLD NH 47) under Ambalappuzha section
Providing Height Restriction Barriers between Aluva and Edapally Metro Station approaches in NH
NH-66 old Urgent Tree cutting Urgent Tree cutting in Dangerous condition and Removing Fallen Trees During Mansoon , from Ch 489 to 502. 800 Altharamoodu to Mevaram in NH 66 old General Civil Work
NH Cherkala Mappila NH link road Re-Tarring from Km 0/000 to 0/420
Consultancy Services for Supervision Consultant of Operation and Maintenance of Four Lane NH Connectivity to ICTT Vallarpadam from Kalamassery (Km.0.000) to Vallarpadam (Km.17.121) Section on NH966A (Old NH 47 C) in the State of Kerala
LAYING 465 M 11 KV UG CABLE FROM PDDP RMU TO SECTION OFFICE ALONG NHAI SERVICE ROAD UNDER ES VYTTILA
GENERAL-2023-24 NH 183 _Kollam_Theni road_ Monsoon Precautionary work, jungle clearance,side drain clearance ,cleaning of choked culvert and cutting of overhanging branches etc from CH 185/700-215/450 except 205/100-210.00
Independent Engineering Services for Six laning from Kappirikkad Design ch 335.850-Thalikulam Design Ch369.015-Kodungallar Design Ch397.750 section of NH-66 in the state of Kerala on HAM under BMP
Strengthening and Improvement of 4Lane NH Connectivity to ICTT Vallarpadam Stretch between Kalamassery(Ch.Km 0.000) to Vallarpadam(Ch.Km17.121)Sec of NH966A in the State of Kerala on item rate contract
Six Laning of Kottukulangara Km. 454.500 to Start of Kollam Bypass Km. 486.000 section of New NH-66 in the State of Kerala on Hybrid Annuity Mode Under Bharatmala Pariyojna
4 Door Filing Cabinets, Steel Rack, Air Conditioner 1.5 Ton, Air Conditioner 2 Ton, All In one Computer
Maintenance of vandipperiyar bridge at ch 200.850 in NH 183 Provisions included are Cement Concrete wearing coat M30 grade using recron fibers steel reinforcement as per MoRTH specification micro concrete
Premonsoon Works to NH 966 from km 64/000 to km 87/000
Old NH 17 to old NH 16 Ayyappa Goshtam Road-General Civil Work
Urgent Maintanance Work to NH 966 from km 40/000 to km 64/000
Rectification of 12Nos Blackspots-Accident spots under Annual Road Safety plan for 2023-2024 in the stretch of Walayar-Angamaly Section of NH-544 in the state of Kerala on EPC mode
Engagement of user fee collection agency on the basis of EQ for Olavanna Fee Plaza at km 250.300 of Kozhikode Bypass from km 230.400 to km 258.800 of NH-66 in Kerala .
NHAI deposit work under LMSD Kannur Shifting of line between locations 269 and 270 of 110kV Kanhirode Mundayad I and II feeders
NH 66 ((Old NH 47)Improvements of Bridge approach to Kayamkulam park at RHS of Ch.457700
Consultancy Services for preparation of Feasibility Study-Detailed Project Report of selected road stretches for upgradation to 2-4-6 lane NH-Port-Coastal connectivity under Bharatmala Pariyojana in the State of Kerala
Four Laning of left-over works including Additional Structures in Kerala-Tamil Nadu Border Kanyakumari from Km.43.000 to Km.96.714 of NH-47 in the State of Tamil Nadu on EPC Mode
Engagement of user fee agency through e-quotation for Nattika Toll plaza fee plaza at km 369.500 for Six laning of Kappirikkad to Kodungallur section of NH-66 in the State of Kerala
Improvements to NH-66 (old NH-17) in between 273/800 to 274/200
Engagement of user fee agency through e-quotation for EQ for Olavanna Fee Plaza at km 250.300 of Kozhikode Bypass from km 230.400 to km 258.800 of NH-66 in the state of Kerala
Premonsoon 2025-26 Premonsoon Works to NH 966 from km 40/000 to km 64/000
Six laning from start of Valanchery bypass to Kappirikkad section of NH 66 (old NH17) from Design Ch. 298.500 (Ex. km 304.250) to Design Chainage 335.850 (Ex. km 349.260) in Kerala on HAM under BP
GENERAL VENGALI ROB in NH 66(Old NH 17)-GENERAL Improvements of approach roads on both sides of VENGALI ROB in NH 66(Old NH 17) Ch 237/480 to 237/750 General Civil work
OR works to NH 66 (old NH 17) in between km 269/600-270/200
Improvements to NH 66 (old NH 17) in between km 287/300 to 288/100
GENERAL-NH 66(OLD NH)-Traffic Safety work from Altharamoodu to Mevaram-General Civil Work
Six Laning of Neeleshwaram to Thaliparambha section of NH 17 (New NH66) from Ch. 94.540 (existing km 96.450) to Ch. 134.650 (existing Km 137.900) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna
Construction of RCC drain and cover slab