Loading…
Loading…
1,800 results • Best match
Kadavallur NH Ambalam Road Retarring
Melekonam pandaravila to NH nadapatha
GENERAL-Premonsoon 2026-27 Premonsoon Works to NH 966 from km 18/056 to km 40/000-Premonsoon 2026-27 Premonsoon Works to NH 966 from km 18/056 to km 40/000-General Civil Work
GENERAL-Premonsoon 2026-27 Premonsoon Works to NH 966 from km 40/000 to km 64/000-Premonsoon 2026-27 Premonsoon Works to NH 966 from km 40/000 to km 64/000-General Civil Work
GENERAL-Premonsoon 2026-27 Premonsoon works on NH 966 from km 64/000 to km 87/000-Premonsoon 2026-27 Premonsoon works on NH 966 from km 64/000 to km 87/000-General Civil Work
NH-744-Reconstruction of Collapsed Retaining wall.-NH-744- Reconstruction of collapsed Retaining wall at KM.19/500 NH 744(in between SNG school and Ambalathumkala.)
GENERAL-Construction of leading drain from Ramanattukara - Parammal road to NH 66-Through Pulaprapadi-NH 66 Link road and Chirakkanpadan NH 66 drain-General Civil Work
Engagement of user fee agency on the basis of e-quotaion through e-tender for Vettichira Fee Plaza of Village-Vettichira for the project of six laning of Ramanattukara Junction to Kappirikkad section of NH-66 in Kerala
OR Works to NH 66 (Old NH 17) in between km 275/750 to 276/250
LAYING 1.5 KM DOUBLE RUN 11 KV UG CABLE FROM KANNADIKADU BORDER AB TO AIRTEL DP ALONG NHAI SERVICE ROAD UNDER ELECTRICAL SECTION MARADU .
Six laning of Ramanattukara Junction to start of Valanchery bypass section of NH-66 from Design Ch.258.818 (Ex.km 27.840 of Kozhikode bypass) to Design Chainage 298.500 (Ex.km 304.250) in the state of Kerala on HAM under Bharatmala Pariyojana
DEPOSIT-NH 66-Installation of Road Safety Furniture in NH 66 Pappinissery Valapattanam Stretch
NH 744 Improvements of Drainage Facilities at Water Logged areas of E l a m p a l l o o r j n 1 2 / 2 0 0 a n d Nedumpaikkulam 16/400 of NH-744 General Civil Work
Traffic safety measures at Junctions in NH 66 (Old NH 47) between ch 366/905-400/400.
urgent repair work and safety work including routine maintenance of road in the 6-lane stretch of Vadakkenchery - Thrissur Section of NH-47 (New No. 544) (Km 236.135 to Km 264.490
Engagement of user fee agency through e-quotation for EQ for Olavanna Fee Plaza at km 250.300 of Kozhikode Bypass (Vengalam Jn. to Ramanattukara Jn.) from km 230.400 to km 258.800 (Design Chainage) of NH-66 in the state of Kerala
Independent Engineer services for Six Laning of Neeleshwaram to Thaliparambha section of NH17 New NH-66 from Ch. 94.540 ex. km 96.450 to Ch. 134.650 ex. Km 137.900 under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode
GENERALOld NH-Reconstruction of Drain in Old NH Ch.362 900 to 363 050 General Civil Work
PRO NO-945/22-23-CONCRETING OF NH MULLOOR ROAD NH WHITE LINE ROAD IN KADAKAMPALLI WARD
GENERAL-Construction of Retaining Wall for Extra widening near Parathodu KM.148/800 LHS in NH 183-Work-General Civil work
Traffic Safety works-BC Overlay from Altharamoodu (Ch.489/000) to Mevaram (502/800)-NH 66(Old NH)
349 NH Perazhippadi Sarappadi Road Improvements
NH VK PARA ROAD RE TARRING
Karuvacheri NH Pallikkara Ambalam road improvement.
476 NH Madrassa kundukadu road concreting
MAYICHA NH KARYANKODE KADAVU ROAD RETARING
Nayarangadi Barlikulam NH Road
Desom Old NH road
CS of Feasibility Report cum DPR for Widening of the existing 2lane road to 4lane from Willingdon Island to Kundanoor or alternatively to Aroor-other suitable location on NH-66 to provide connectivity to Cochin Port Trust in the state of Kerala
Balance work of Widening of 4 nos existing 2 Lane major Bridge of 6-laning of Kozhikode Bypass (Calicut Bypass) (Vengalam to Ramanattukara Jn.) section of NH-66 from Design Chainage km 230.400 to Design Chainage km 258.800 (TL 28.400 km) in Kerala
Pathiyoor G.P Annual Plan 2020-2021 Proj.no.60 Improvement of NH Canal Palam road Second reach in Ward no.13
GENERAL Providing drainage facilities on Old NH Mukkali Providing drainage facilities on Old NH Mukkali General Civil Work
Traffic safety measures at junctions in NH 66 (Old NH 47 )between CH 421/400 to 462/000
Kuniya NH Vadakkuppuram Concrete in Pullur Periya GP
2 AXES DRO FOR NH 1000CD MACHINE (Q3), 2 AXES DRO FOR NH 1500CD MACHINE (Q3)
Strengthening and Geometric improvement from Km 15/000 to 25/000 of NH 766
Setting up of NH Division office
IE services for 6-laning of Kozhikode Bypass (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 from Design Chainage km 230.400 to Design Chainage km 258.800 (total length 28.400 km) in the State of Kerala under NHDP Phase-III on HAM (2nd call
Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH66) from Ch. 56.200 (existing km 57.200) to Ch. 93.468 (existing km 95.650) (Total length 37.268 km) in the State of Kerala on HAM under BP in the category of residual works under NHDP
HARIPAD BP 2024-25 NH TO VATTATHARA ROAD TARRING SECOND REACH IN NH VAZHATHARA ROAD IN KARUVATTA GP (RETENDER)
GENERAL-Supplying of cold mix compounds for various roads under NH Division Kollam Old NH 66 stretches under Kollam and Alappuzha and Thiruvalla Town portion in NH 183-General Civil Work
FDR 2019-2020 Construction of drain on LHS of NH 66 Old NH 47 from Km366/905 to 367/455
Annual mace of WSS to Maradu Municipality West side of NH 47 NH 66AI for the year 2022 23
Construction of Culvert in Old NH Vadakara road -Construction of Culvert in Old NH Vadakara road in 1.00 to2.500
Annual maintence of WSS Maradu Municipality East side of NH 47 NH 66 AI for the Year 2022 2023
Annual maintenance of WSS Maradu Municipality west side of NH 47 NH 66 AI for the Year 2020 2021
Thavanur G P -2019-20-Improvements of New NH to NH Sakhavu road and Link roads in ward 15
improvements from km 194/00 to 202/000 of NH 85 Old NH-49 in the State of Kerala
Urgent rectification of NH 66 from 444/000 (Harippad MadhavaJN)to Ch 462/000(Krishnapuram under NH Division Alappuzha
Annual mace of WSS to Maradu Municipality West side of NH 47 NH 66AI for the year 2019 20