Loading…
Loading…
2,078 results • Best match
BALANCE WORK FOR MAINTENANCE OF SATNA BELA NH 39 (OLD NH 75) CH 155/000 TO 202/040 LENGTH 47.04 KM UNDER RISK and COST IN THE STATE OF MADHYA PRADESH (3rd Call)
Emergent work of demarcation of ROW in Madhav National Park Stretch from Km 100.75 to km 107.350 in NH 3 New NH 46 in the State of Madhya Pradesh.
Engagement of user fee agency through e-tender for Panihaar FP at km 136.000 for four laning of Gwalior-Shivpuri Section from km 15.600 of NH-75 to km 236.000 of NH-3 in Madhya Pradesh
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
Construction work of 4-laning of Sandalpur to Nasrullaganj bypass end PkgI of NH-146B from design km 0.000 to design km 43.250 (DL 43.250 km) under NH(O) in Madhya Pradesh on Hybrid Annuity Mode
Short Term Maintenance Contract (STMC) work from Bargarh More to NH-135B near Dabhaura on NH-135BB (Length 8.00 Km) in state of Madhya Pradesh
Providing, running and maintenance of commercial vehicle for NHAI RO-Jabalpur and PIU-Jabalpur.
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-06)
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-3B)
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-02)
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-01)
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-04)
Request for Proposal for Road Safety Auditors/Expert for preparation of design estimate etc for carrying out long term measures including cautionary measures and/or short term measures for Road accidents black spots on National Highways (Package-3A)
Development, Operation and Maintenance of Wayside Amenities on Seoni-Mohgaon section of National Highway 44 on lease basis in Madhya Pradesh (DBOT-2 Sites)NH44/606-500/Nandour/RHS/Madhya Pradesh
Development, Operation and Maintenance of Wayside Amenities on Seoni-Mohgaon section of National Highway 44 on lease basis in Madhya Pradesh (DBOT-2 Sites)NH44/606-500/Nandour/LHS/Madhya Pradesh
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh.
Repair Works in Km 220 and 221 On NH 45 E
Drain Work in Km 45 4 6 on NH 45 E
4 Laning of Raghogarh (Design Ch. 29.300/Existing Ch. 29.555) to Nanasa (Design Ch. 92.971/Existing Ch. 95.000) Section of NH-47 (Old NH-59A) (Design Length 63.67 km) under BMP Phase I (Economic Corridor) in Madhya Pradesh on HAM basis
Construction of 4 Lanning of Badnawar-Petlawad Thandla-Timarwani section of (NH-752D) from Badnawar Bypass Ch.70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE-4) Ch.150.850 in the state of Madhya Pradesh on HAM under NH(O)
IE services for Construction of 4 L of Badnawar Petlawad Thandla Timarwani section of (NH 752D) from Badnawar Bypass Ch. 70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE 4) Ch. 150.850 in Madhya Pradesh on HAM under NH(O)
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode
Four laning of Nanasa to Pidgaon section of NH-47 Old NH-59A Indore Harda Pkg III L 47.445 km Design Ch. 95.00 Km to 142.445 km under BMP Ph-I Economic Corridor in the State of Madhya Pradesh on HAM.
2nd Call - Civil Works and Traffic Guiding work Before and After Launch of Bailey Bridge across river Sukhtawa at Km 77.900 of NH-69 New NH-46 in the state of Madhya Pradesh
Signboard work in Selected stretches at Curves and Ghat portions in km 12 to 140 on Jabalpur Dindori Stretch on NH 45E (NH Division Jabalpur)
Signboard work in Selected stretches at Curves and Ghat portions in km 52 to 100 on Mandla Dindori Stretch on NH 543 (NH Division Jabalpur)
Ordinary Repaire works in km 1 to 30 on Balaghat-Nainpur Stretch on NH 543 of NH division Jabalpur in the State of Madhya Pradesh
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh
Patch repair work on Sagartola Kabirchabutra stretch on NH-45 Ext Between Km 171 to 190 (Excluding performance gaurantee stretch (NH Division Jabalpur)
Construction of Service Road Slip Road of CUPs at Km 39.083 46.895 65.395 78.991 and 87.395 of Indore Gujarat Project Highway NH 59 New NH 47 in the State of Madhya Pradesh 2nd Call
WBM road work from Muktidham to NH 3
Transportation, Erection, Dismantling, etc. of ERS for modification/ shifting of EHV lines due to proposed 8 laning of Delhi-Vadodara section of NH-148N for express way between Mumbai to Delhi under Bharat Mala Project of NHAI under CCW
Engagement of user fee collection agency on the basis of EQ through e-tender at Panihaar fee plaza at km 136.000 for four laning of Gwalior Shivpuri Section from km 15.600 of NH-75 to km 236.000 of NH-3 in Madhya Pradesh
Independent Engineer services for construction of Four laning of Harda to Temagav section from(Design Ch. 0.000 Existing Ch 141.750)to(Design Ch.30.000 Existing Ch.180.500)section of NH-47(Old NH-59A)(Design Length 30.000km)in the State of MP.
Development of 6lane of access-controlled Agra-Gwalior GF highway starting from km0.000-km88.400 Deori-Susera in the state of UP-Raj.-MP including the overlay strengthening and improvement works on from 1058.00-1148.00 of NH-44 on DBFOT BOT Mode NH(O
6 laning with service road on both sides of Ayodhya Bypass section of NH 46 from design km 0.000 near Ashram Tiraha to design km 16.500 at Ratnagiri Tiraha (Design Length 16.500 km) under NH (O) in Madhya Pradesh on Hybrid Annuity Mode
Construction of New Service Road and under passes at various locations on Rewa Katni Jabalpur Km 813.257-Km 880.600 (Pkg-4) and Improvement works at Jabalpur Lakhnadon (Km880.600-Km891.780) of NH-30 and (1358.000-Km1428.557) of NH-34 in MP on EPC
Drain work in km 64 on Balalghat Nainpur Stretch on NH 543
Providing and fixing of W Metal Beam Crash Barriers on NH 543 Balaghat Nainpur Mandla Dindori Sgartola Shahdol Stretch (NH Division Jabalpur)
Original Repair OR (DPP) Estimate for highway Short Term Maintenance of NH 347A Multai warud section (Length 25.00 KM) Road under NH Division Indore in the state of Madhya Pradesh
Periodical Renewal works in km. 3.939 to 15.450 Chaigaon Makhan Road on NH 347B under NH Division Indore in the State of Madhya Pradesh on EPC Mode
Independent Engineer Services for Six laning with both sides Service Road of Ayodhya Nagar Bypass of Bhopal City Section of NH-46 from Design Km 0.000 near Ashram Tiraha to Km 16.439 at Ratnagiri Tiraha (Length 16.439 Km) under NH(O) in Madhya Prades
IE Services for Widening of existing 2-4 lane divided carriageway with paved shoulder from Km243.800-Km270.500 of NH39 (Rewa to Churhat Tunnel) and from Km286.200-Km313.700 of NH 39 (Churhat to Sidhi) (54.20 Km) under NH(O) in the State of MP on HAM
Construction of 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) under BMP in the State of MP on EPC mode.
Balance works of 4 lane divided carriageway of Missing Link section of NH-39 (Rewa Bypass) from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH-9 (length 13.100 km) on EPC Mode under BMP in Madhya Pradesh
Construction of (i)4-lane highway from Vidisha to Hinotiya from km 0.000-27.000 Vidisha-Mehulwa-Talbehat Pkg-I Section of NH-346 and (ii)4-laning of Vidisha to Morikori from Km39.000-59.476 section of NH-146 under BMP in Madhya Pradesh on HAM
Modification_shifting work of 04 Nos. 132KV EHV lines due to construction of Rail over Bridge (ROB) at Varanasi-Nagpur National Highway Road by PWD near Railway Station Rewa under consumer contribution works.
Excavation loading of pond ash from Ash dykes silos of SSTPP Dist Khandwa,unloading at const site of NHAI Indore to Raghavgarh of NH-59 Indore to Harda from MR10 jun on NH3 Bypass CH0.25 to Raghavgarh Ch29.903 length26.653km under BharatMalaPariyojna
4-laning of Indore to Raghav Garh section of NH-59 (Indore-Harda package-1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design 26.653 Km) under Bharatmala Pariyojana Phase-I (EC) in Madhya Pradeshv on EPC Mode