Loading…
Loading…
2,078 results • Best match
Ward 8 hanuman temple to NH 12 Kishangarh cc road construction work
Repairing of bridge in Km 137 bate 4 on Narmada River of NH 45
MAINTENANCE OF ROAD WORK NH AT NH-552 EXT. IN DISTRICT BHIND
Engagement of user fee agency through e-tender for Ramnagar FP at km 1280.370 from Baran-Shivpuri section from km 1251.814 to 1305.087 on New NH 27 in Madhya Pradesh
4 -laning of Khedakhajuria to Suhadadi from km 41.000 to km 89.200 of NH-148 NG (Ujjain Garoth Package-II) in the State of Madhya Pradesh on Hybrid Annuity Mode.
CONSTRUCTION OF NEW A SITE RETAIL OUTLET Between KM stone No. 113 and KM Stone No. 117 on agra mumbai National Highway On RHS while going to Mumbai from Indore UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Strengthening work from km. 1/550 to 23, total length- 22.60 kms. of Indore - Betul road on NH-59A on EPC mode under NH division Indore in the State of Madhya Pradesh
Providing running and maintenance of 01 Innova or equivalent 03 Scorpio/Bolero or equivalent type commercial vehicle for NHAI PIU Khandwa
Painting, Figuring and Kilometer Stone fixing and other Maintenance work between Km 7 4 to 85 on NH 45 E
Horticulture Maintenance for NH-2 and NH-3 D-Type quarters atNTPC-Vindhyachal
One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode (3rd call)
Patch repair and shoulder repair of Gulganj Amanganj Pawai Katni Road NH 43 Extn Km 1 to 14.6
ward 07 NH 45 to sebha patidar house cc road construction work
Ward 15 NH 12 to Roshan ali house CC road construction work
IE Services for supervision of Shivpuri to Jhansi from Chainage.km 1305.000 to Chainage km 1380.300 of NH 27 in Madhya Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2)
4 Laning of Mohari to Satai Ghat sec NH 934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package 2) in the State of Madhya Pradesh on EPC Mode.
Repairing of bridge in Km 122bate 4 123bate 6 and 128bate 6 on NH 45
Short Term Maintenance of Sagar Kabrai Economic Corridor NH-34 (Pkg 3and4) Existing Ch. 88.000 to 189.400 (Total length 101.400)in the state of MP
Estimate for NH Crossing of 33 kv Aliganj line under OnM Dn. Bareli
Repairs/re-carpeting of Bituminous Road from Bachelor Hostel to DSC tri-square, Check Post to National highway and Main Road from MRS to Check Post, CheckPost to Vindhyachal Club, Vindhyachal Club to BachelorHostel and Bachelor Hostel to MRS at OFI
Items for Road Marking work in Selected Stretches between km 86 to 105 and 107 to 150 on NH 45 E
Rehabilitation of Existing Distressed Road Section of Loni-Burhanpur on NH-347C in the State of Madhya Pradesh on EPC Mode
Construction of 8 Lane access-controlled Expressway carriageway from Kandarwasa village to Bawadi village of Ratlam district section of Delhi- Vadodara Greenfield Alignment (NH-148-N) under Bharatmala in MP on EPC
2-lane with Paved shoulder of Ujjain-Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC mode
4 -laning of Ujjain-Garoth (Package-III) Suhagada to Bardiya Amra from km 89.200 to km 135.351 section of NH-148 NG in the State of Madhya Pradesh on Hybrid Annuity Mode.
Consultancy Services for Authoritys Engineer for Supervision of Construction of 2-lane with paved shoulder configuration of Ashta Bypass of NH-752C and Nasrullagani-Rehti-Budhni of NH-146B Total length 54.88 Km in the state of Madhya Pradesh on EPC
LALPUL CHINTAMAN GANESH TO NHAI JUNCTION 6.2 KM AND MR-24 INDORE ROAD TO CHINTAMAN RAILWAY STATION 2.74 KM SIMHASTH DN. UJJAIN
SC during Routine Maintenance and Incident Management for Katni Umaria and Shahdol Annupur MP CG Border Section of NH 43 in the State Of Madhya Pradesh
Short Term Operation Maintenance and safety improvement of Satna Chitrakoot section of NH 135BG from existing Ch 00 km to 79.00 km on item rate basis
Consultancy Services For AE For Supervision of Four laning of Katni-Bypass of NH-7 from km 359.500 to km 378.500 length 20 km in the State of Madhya Pradesh on EPC Mode
WARD 08 NH 52 ROAD PAR MUKHYMANTRI MACHUA SAMRADDHI YOJNANTARGAT SMART FISH PARLOUR NIRMAN KARYA
Independent Engineer Services for Construction work of 4-lane Highway from Km 0.000 to Km 42.040 Bhopal (Ratnaigiri Tiraha) to Vidisha (Morikodi) section of NH-146 under BMP in Madhya Pradesh on HAM Mode.
Engagement of Manpower Service Provider for collection of User Fee on Khawasa Fee Plaza under Tolling Operation Maintenance and Transfer of Mahagaon to Khawasa section of NH 44 in the State of Madhya Pradesh
IE Services for Const. of 6lane Indore western bypass from km 0.000 to Km 34.0000 (PkgI)and Km 34.000 to Km 64.000 (PkgII)in the state of Madhya Pradesh on HAM under NH(O)
Const work of 4laning of Budhni to Badi sec of NH146B from design km 82.882 to design km 150.712 (Design Length 67.83 km) under NH(O) in the State of Madhya Pradesh on HAM.
Short Term Improvement and Routine Maintenance work of tolling reach of Mundiyar FP frm km 1184.322 to 1251.814 Length 67.492 Km on Baran Shivpuri Sec of New NH 27 in Rajasthan on PBMC Mode
4-laning of Dhangaon Boregaon section of NH-347BG 753L (Indore to Boregaon Pkg IV) Design Ch. 81.000 to 139.000 (Length 58.000 Km) under Bharatmala Pariyojana PhaseI in Madhya Pradesh on Hybrid Annuity Mode
Four Laning of NH-146 from Design Chainage km 59.475 (Existing Chainage km 81.240 near Vidisha) to Design Chainage km 88.600 (Existing Chainage km 110.315 near Gyaraspur) in Madhya Pradesh on HAM under BMP
Engagement of user fee collection agency on the basis of CB through e-tender at Semalkhedi fp at Km 84.200 of Ujjain-Jhalawar (upto Rajasthan Border) Section of NH- 552(G) in Madhya Pradesh
Emergent road maintenance works for traffic safety of Boregaon Buzurg to Ichhapur section of NH 753L from Km. 145.000 to 203.600 in the state of Madhya Pradesh
Short Term Improvement and Routine Maintenance including Incident Management services for Vidisha Sagar Section NH 146 from Km. 81.000 to 187.600 in the State of Madhya Pradesh.
Strengthening of road from km 15/8 to 19 and 55/6 to 66 Total 16 KM NH 43 Extn Gulganj Amanganj Pawai Katni Road on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
Patch repair and jungle clearance Etc of Gulganj Amanganj Pawai Katni Road NH 43 Extn Existing Chainage 67 to 79
Engagement of user fee agency through e-quotation at Goragaon Fee Plaza at km 42.700 for the use of Mihona to Lahar to Daboh Section of NH-552 Extension in the State of Madhya Pradesh
Tolling Operation Maintenance and Transfer of four lane Lalitpur-Sagar-Lakhnadon section from km 99.005 to km 415.089 of NH-26 in the state of Uttar Pradesh and Madhya Pradesh (TOT Bundle 12)-2ND CALL
Balance work for construction of 2-lane with paved shoulder from km 80.800 to km 85.250 (Satna-Maihar) section of NH 135BG (design length 4.450 km) in the state of Madhya Pradesh on EPC mode
Repairing of Road and Bridges and Culverts in Km 7 to 35 of Mandla Dindori road Damaged due to Rains of NH 543
Safety Consultant for Operation Maintenance period for Nagpur-Saoner-Betul Section of NH-47 in the state of Maharashtra and Madhya Pradesh-Consultancy Package No.SCBOTNH-472022-23NAG-07
Design and Construction of Standalone flyover at Rasalpur Junction on Indore-Dewas section of NH-52 under Road safety improvement in the State of MP on EPC Mode
Patch Repair work Between Km 83 to 105 and Km 107 to 112 on NH 45 Ext.