Loading…
Loading…
2,082 results • Best match
Special Strengthening work of NH No.347 SH No.19 Rohnakala Gurriya Poama Road Length 9.20 Km And Kabadiya Surgi Medkital Road Length 5.00 Km Total Length 14.20 Km (IInd-call)
Maintenance work from km 239.00 to km 288.00 Shyampur-Sabalgarh Section of NH-552Extn under Short Term Maintenance Contract for the financial year 2024-25 in the State of Madhya Pradesh.
Maintenance work from km 327.00 to km 360.00 Joura-Morena section of NH 552Extn under Short Term Maintenance Contract for the financial year 2024-25 in the State of Madhya Pradesh.
Development, Operation and Maintenance of Wayside Amenities on Ujjain Garoth Section of NH-752D on Lease Basis in Madhya Pradesh - 2 DBOT Sites.NH-752D/Ujjain- Garoth/46-400/RHS/ Dhanodiya/MP
Development, Operation and Maintenance of Wayside Amenities on Ujjain Garoth Section of NH-752D on Lease Basis in Madhya Pradesh - 2 DBOT Sites.NH-752D/Ujjain- Garoth/46-400/LHS/ Dhanodiya/MP
Construction of new A site Retail Outlet at location Village Devkhapa between Km Stone 84 to 88 on Bhopal Nagpur NH District Pandhurna, State Madhya Pradesh under Jabalpur Divisional Office, MPSO
Providing Running and maintenance of 03 nos. of vehicle in different categories for use of official purpose by the officers of NHAI PIU Jabalpur
Speed Limit Speed Breakers Dhire Chaliye Aage School College Hospital haietc Traffic Sign Board, Constn. of Speed Breakers at Various Points Padriganj to Rani Avanti Bai Road Marking Side Speed Limit Speed Breakers Dhire Chaliye Aage Sc
FOR REFILLING OF A-4 and A3 SIZE COLOR LASER PRINTERS INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD an
FOR REFILLING OF A-4 and A3 SIZE COLOR LASER PRINTERS INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD an
Providing AND fixing of retro Reflectorised traffic signs and delineators in selected stretches on NH 45 E Jabalpur Dindori sagartola kabirchabutra stretch and NH543 rajegaon balaghat nainpur mandla and sagartola shahdol stretch
Construction of Railway Over Bridge in Lieu of Level Crosing No. 301 on Railway KM 959/4-5 Between Vikrampur-Bhtoni Station on Bhopal (NH-12) to Shahpura-Gotegaon Road District Jabalpur
Carrying out long term measure for rectification of blackspot no. 222 from Pipal wali Chowki to Nursary in km. 311.500 to 312.000 of NH-552(ext.) in the state of Madhya Pradesh
DEVELOPMENT OF APNA GHAR FACILITIES AT M/S HIGHWAY JUBILEE FUEL CENTRE AND M/S JAIN FUELS AND ENERGY INDORE NH AB ROAD UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE.
S.T.M.C. WORK OF(1) KRIPALPUR RAMSTHAN BABUPUR ROAD LENGTH - 14.44 KM. (2) MADHAVGARH TO SAJJANPUR ROAD (OLD NH-75 BALANCE PART) LENGTH - 8.86 KM. TOTAL LENGTH-23.30 KM. UNDER SUB DIVISION SATNA.
PROVIDING AND FIXING OF METAL BEAM CRASH BARRIER THE PROTECTION OF TRAFFIC ON GHAT PORTION AT KHALGHAT KHARGON KHARGONE SERVAR DEVLA PAL MAHARASHTRA BORDER IN KM 99 TO 127 ON NH 347C
Construction of Rastriya Rajyamarg NH-39 Upani to Uttar Tola Approach Road, Length- 3.06 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
SHIFTING OF EXISTING 33 KV, 11 KV, LT LINE AND DTR SIMARIYA TEKRI TO HARIPUR HIGHWAY AT DABRA LENGTH 9.2 KM AND JOURASI MANDIR NH 75 LENGTH 1.1 KM FOR STREET LIGHT
PROVIDING AND FIXING OF METAL BEAM CRASH BARRIER THE PROTECTION OF TRAFFIC ON GHAT PORTION AT KHALGHAT KHARGON KHARGONE SERVAR DEVLA PAL MAHARASHTRA BORDER IN KM 75 TO 98 ON NH 347C
PROVING FOR SHIFTING OF HT/LT LINES AND DTRS DUE TO WIDENING OF ROAD FROM NH 26 TO BARMAAN KALAN MAIN ROAD UNDER BARMAAN DC OF OM DIVISION NARSINGHPUR, DISTT NARSINGHPUR MP
Carrying out long term measure for rectification of blackspot no. 222 from Pipal wali Chowki to Nursary in km. 311.500 to 312.000 of NH-552(ext.) in the state of Madhya Pradesh
ZONE NO. 02, WARD NO. 06, RCC ROAD STRENGTHENING WORK FROM NH-7 ROAD VIA VINDHYA HOSPITAL TO DHANENDRA SINGH PARSHAD JI HOUSE AND UP TO BIHAR RIVER GHAT UNDER KAYAKALP-2.0.
RFP for Design and Construction of Vehicular Underpass VUP at Km. 21.150 near Angira College on Jhansi Khajuraho Section Pkg 1 of NH 39 in the State of MP on EPC Mode.
Design and Construction of VUP and Service roads on Indore Gujarat section of NH 47 under Road safety improvement in the State of Madhya Pradesh on Engineering, Procurement and Construction EPC Contract
PBMC Work Kajli Kundbakajan, Bhimpur Khamapur Gurwa, Kondhar NH-59A, Chicholi R.H. App, Chicholi Malajpur Fogariya Awariya, Hiwarkhed App, Arjunwadi Kharpada, Hathnora Parsodi, Bhayawadi App, Sohagpur Jetapur, Juwadi Bhopali, Sonaghati Milanpur Rd.
PBMC work on Morena-Ambah-Porsa from Ch 238.940 to Ch 282.540 (Total Length-41.476 Km.) NH-552 Extn. in the State of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) mode
PR Work FROM K.M. 139 TO 157/6 ON NH-934 SAGAR-BINA ROAD (TOTAL LENGTH 17.320 KM) EXCEPTING 1.22 KM. ROB PORTION in the State of Madhya Pradesh on EPC Mode
New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Flood Damage Repair to Flood Damage Repair to Construction of RCC Retaining wall on Valley side Ghat portion in Km 23/2 on NH 347A Multai-Pattan-Warud Road in the state of Madhya Pradesh
Construction of Anuppur Jaitpur Main Road from Km. 8/2 to Khada Kodauli Pondi road upto NH-43, Khunta Tola to Beed approach road and Seoni to Balbahra road. Total Lt. 7.30 Km.
Preparation Of DPR For Proposed Work in Second Supplementary Budget FY 2025-26 Dimni Nahar Road (NH-44 Sikroda To Jakhona To Ruar) Pay Ka Pura To Kirrayach Road Under P.W.D. Sub.Division Ambah
Estimate for electrification work (by Vidhayak Nidhi) at village Multai (NH-47 Swagat Dawar Sonoli Road Se Khatusyam Mandir ki Our) under Multai (T) Dc. O and M Dn Multai in Betul Circle
Construction of Main Road NH-39 Badhaura (Baniya Tola) to Kargil Approach Road , Length- 3.20 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
BT RENEWAL WORKS ON 1.JHUKEHI ROAD (347/6 TO 352/8) 4.50KM, AND 2.SABHAGANJ TO PATHRAHTA (341/6 TO 344/8) ROAD 2.70KM, AT OLD NH-7, UNDER SUB DIVISION MAIHAR
Consultancy Services for Preparation of Detailed Project Report For Two Lanes/Two lane with paved shoulder Configuration of Stretch Mandla-Nainpur-Lamta-Balaghat NH-543 Total 134 Km in State of Madhya Pradesh
Carrying out short term measure for rectification of blackspot no. 051 from Nayagola petrol pump to Gurod road km. 4 to 4.05 of Vidisha -Kurwai NH-146 in the state of Madhya Pradesh
Construction of Railway Over Bridge in Lieu of Level Crosing no. 330 in Railway K.M 1017/1-2 of Jabalpur - Katni Section on NH 30 Gosalpur Bypass to Khamariya Road in District Jabalpur.
Engagement of Manpower Service Provider for collection of User Fee on Madai Fee Plaza under Tolling Operation Maintenance Transfer of Lakhandon to Mahagaon section of NH-07 in the State of Madhya Pradesh
Engagement of Manpower Service Provider for collection of User Fee on Khawasa Fee Plaza under Tolling Operation Maintenance Transfer of Mahagaon to Khawasa section of NH-44 in the State of Madhya Pradesh
P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode
Short Term Improvement and Routine Maintenance of stretch from design km 0.000 to 100.757 and from km 107.350 to km 125.380 of four lane of Gwalior-Shivpuri Section of NH-46 in MP
FOR REFILLING OF A-4 SIZE LASER / MULTIFUNCTION PRINTERS (BLACK) INSTALLED AT RDD, Chief Architect (CE-RDD), C E Capital Zone, C E National Highway, C E Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD and Testing Lab BHOPAL
Construction of Railway Over Bridge in Lieu of Level Crosing no. 327 in Railway K.M 1010/6-7 of Itarsi - Manikpur Section on NH 30 Panagar Bypass to Kusner-Umariya Road in District Jabalpur.
CONSTRUCTION OF CC ROAD INDRA AAWAS TO SONU SAHU TO DHARMENDRA SAHU WARD NO 04 AND NH 45 TO TARWAR SINGH TO MOTILAL TO PRAKASH RAIKWAR WARD 13 DEORI UNDER MMSAVY 3RD FACE SCHEME
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
CONSTRUCTION OF KACHHA DRAIN AND EXCAVATION IN HILLY PORTION FOR THE PROTECTION OF TRAFFIC ON GHAT PORTION AT KHALGHAT KHARGON KHARGONE SERVAR DEVLA PAL MAHARASHTRA BORDER IN KM 100 TO 127 ON NH 347C
REPLACEMENT OF EXISTING FEEDER AND DISTRIBUTION PIPELINES FROM RATHARA BYPASS TO CHORHATA BYPASS (NH-7), BY PROVIDING, LAYING, JOINTING, TESTING AND COMMISSIONING ETC. COMPLETE WITH NEW PIPELINE AT SPECIFIED LOCATION ALONG WITH ONGOING CONST...
WIDENING AND UPGRADATION OF KHANIYADHANA TO REDDY CHOURAHA, CHANDERI PICHHORE NH 346 (Two Lane) LENGTH 11.00 KM UNDER SUB DIVISION PICHHORE DISTT. SHIVPURI (M.P.) WITH OVER HEAD LINE 11 KV/LT POLE SHIFITNG WORK.
ROAD MARKING, PAINTING AND FIGURING WORK ON TONK TO CHIRGAON ROAD NEW NH-552 KM 239 TO 288 LENGTH 50 KM SBALGARH TO SHYAMPUR ROAD KM 0 TO 50 KM TOTAL LENGTH 100 KM
CONSTRUCTION OF DIGHAUL TO SEMARIYA APPROACH ROAD ( LENGTH 1.0 KM) AND NH-135 (PANCHAYAT BHAWAN) TO SARAI SENGER BASTI VIA HANUMAN MANDIR APPROACH ROAD ( LENGTH 1.50 KM) TOTAL LENGTH 2.5 KM SUB DIVISION MANGAWAN