Loading…
Loading…
2,086 results • Best match
REPLACEMENT OF EXISTING FEEDER AND DISTRIBUTION PIPELINES FROM RATHARA BYPASS TO CHORHATA BYPASS (NH-7), BY PROVIDING, LAYING, JOINTING, TESTING AND COMMISSIONING ETC. COMPLETE WITH NEW PIPELINE AT SPECIFIED LOCATION ALONG WITH ONGOING CONST...
WIDENING AND UPGRADATION OF KHANIYADHANA TO REDDY CHOURAHA, CHANDERI PICHHORE NH 346 (Two Lane) LENGTH 11.00 KM UNDER SUB DIVISION PICHHORE DISTT. SHIVPURI (M.P.) WITH OVER HEAD LINE 11 KV/LT POLE SHIFITNG WORK.
ROAD MARKING, PAINTING AND FIGURING WORK ON TONK TO CHIRGAON ROAD NEW NH-552 KM 239 TO 288 LENGTH 50 KM SBALGARH TO SHYAMPUR ROAD KM 0 TO 50 KM TOTAL LENGTH 100 KM
CONSTRUCTION OF DIGHAUL TO SEMARIYA APPROACH ROAD ( LENGTH 1.0 KM) AND NH-135 (PANCHAYAT BHAWAN) TO SARAI SENGER BASTI VIA HANUMAN MANDIR APPROACH ROAD ( LENGTH 1.50 KM) TOTAL LENGTH 2.5 KM SUB DIVISION MANGAWAN
Maintenance work on Rigid pavement of NH 752-B Biaora-Maksudangarh section from Km 3 plus 150 to Km 38 plus 700, 42 plus 30 to 42 plus 510 (Length 36.030 Km) Second call
Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Periodical Renewal works in km 111 to 117,121,123 to 125,128 to 140,144,148,150 to 152,154 to 159 of Chanderi-Mungawali-Bangla Chouraha road on NH-346 on EPC mode in the State of Madhya Pradesh
Engagement of Manpower Service Provider for collection of User Fee on Kherwasani FP under Tolling Operation Maintenance n Transfer of Rewa Katni Jabalpur lakhnadon Sec of NH-34 in the State of Madhya Pradesh
Reconstruction and strengthening of Service Road Work of Drain and Other Works at VUP Near Lohi Bridge at Km 244.000 New Chainage of Rewa Sidhi Section NH 39 in the State of Madhya Pradesh
Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode
Strengthening of NH-543 Balaghat-Nainpur-Mandla-Dindori-Sagartola-Shahdol road in of Dindori-Sagartola stretch, of Sagartola-shahdol stretch Total Length 47.182 Km in the state of Madhya Pradesh on EPC mode
ZONE NO.-03, WARD NO.-13, CONSTRUCTION OF BITUMINOS ROAD OVER EXISTING OLD RCC ROAD FROM NH-7 BEHIND SURUCHI RESTORENT NEAR OXFORD SCHOOL AND UPPAL MOTORS ROAD TO DR. SARASHWAT HOUSE UNDER KAYAKALP SCHEEM.
Construction of NH 752 B to Biaora Suthaliya road to Gindorhat Salehpur Jod road length 3.00 km (1st Call on SOR Road and Bridge 11/04/2025 Time period 180 days i/c R/s)
Widening of Obedullaganj Nagpur Old NH-69 to Dongarwada Village road, Length- 3.00 k.m. PAC 607.35 lacs First Call on Road and Bridge SOR 25-03-22 work period 365 days I/c rainy season
DEVELOPMENT OF NEW A SITE RO AT LOCATION- FROM VILLAGE DAHUWA TO VILLAGE KHEIRWANI ON NH 347 VILLAGE- KHEIRWANI, TAHSIL-MULTAI ,DISTRICT-BETUL (ADVT LOCATION-149) UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE.
S, Strengthning Rd of NH-59A (Over Bridge to Dhanora Four Lane), Sonaghati Mandai Bujrag, Betul Station, Chichanda ROB, Sasundra, Pattan, Pattan Navodaya School App., Jaulkheda Amla, Malegaon Borgaon, Bhimpur Khamapur, Aadarsh Pipriya Bakajn Chikhali
POLE SHIFTING AND HEIGHT RAISING OF 11 KV, 33 KV, LT LINE AND DTR TRANSFORMER DUE TO CINSTRUCTION OF ROAD FROM NH-86 (BHITONI ROAD) TO PMGSY PANCH PIPLIYA ROAD UNDER DC NAPLAKHEDI DIST SEHORE
NETWORK SURVEY VECHICLE WORK of MORENA-AMBAH-PORSA Road from km 254.370 to km 291.800 length of 43.60 km on Morena to porsa section of newly declared NH-552 Ext. in the state of MP
Construction of 2-lane with paved shoulder configuration of Shujalpur Bypass, from Km 33/100 to 43/570, design length 10.47 Km section of NH-752C in the State of Madhya Pradesh under EPC mode
DEVELOPMENT OF NEW A SITE RO AT LOCATION WITHIN 2 KM FROM U. P. TEHSIL OFFICE, SOYATKALAN ON NH 552G, Distt. AGAR MALWA, STATE MADHYA PRADESH UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Construction of additional lanes to act as truck parking/lay bye in Sohagi Ghat stretch on Mangawan to MP/UP border section of NH-30 in the state of Madhya Pradesh on EPC mode (2nd call)
Construction of 3 Nos. of Foot Over Bridge at Km 621.100 Sukhtra, 637.515 Kurai and Km 650.550 Khawasa of Seoni MP MH Border of NH-44 in the State of Madhya Pradesh (4th Call) (Item Rate Basis)
CONSULTANCY SERVICES AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 Total Leangth 81.300 km in the State Of Madhya Pradesh On EPC Basis Total Leangth 81.300 km
DEVELOPMENT OF NEW A SITE RO AT LOCATION FROM VILLAGE HARIPURA TEHSIL ZIRAPUR TO VILLAGE NAIHEDA TEHSIL ZIRAPUR ON NH 752 B, DIST RAJGARH ADVT LOC 343_2023 UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
DEVELOPMENT OF NEW A SITE RO AT LOCATION WITHIN 4 KMS FROM BHOJAPURA JOD TOWARDS AHMEDPUR ON NH 346 IN TEHSIL BERASIA DISTT BHOPAL. ADVT LOC 2072023 UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
REPLACEMENT OF EXPANSION JOINT FOR BRIDGES IN KM 78/10, 88/2, 88/8, 92/6, 114/10, 142/2, 148/6, 154/6, 164/8, 170/10 ON NH-346 DINARA CHANDERI MELUA CHOURAHA ROAD
Construction of Railway Over Bridge in Lieu of Level Crosing no. 323 in Railway K.M 1004/2-3 of Itarsi - Manikpur Section on NH 30 Panagar Market to Imaliya-Rithori-Ghana-Ranjhi Road in District Jabalpur.
Construction of Balance work of ROB, VUP and approaches at Km. 168 of Sidhi- Singrauli Section of NH-75E from Km. 83.4 to Km. 195.6 of Northern Coalfield Limited (NCL) in the state of Madhya Pradesh.
Construction of Village road from Jerapur Soyat NH to Bhagora Bakani road length 4.50 km PAC 515.78 lacs First Call on Road and Bridge SOR 11-04-25 work period 240 days I/c rainy season
Construction of Underpasses VUP LVUP SVUP for long term mitigation measures on MoRTH identified blackspots and other Potential Blackspot locations in Lakhnadon section of NH 34 and Sleemnabad to Lakhnadon Section of NH30 on EPC Mode.
CONSTRUCTION OF BHUARI (NAODHIYA ) NH TO SONVARSHA PANDAY TOLA APPROACH ROAD LENGTH 2.00 KM AND DEOTALAB NAHIGARHI ROAD TO GNIGAWAN SHRI AKHILESH SINGH HOUSE LENGTH 1.50 KM TOTAL LENGTH 3.50 KM. UNDER PWD SUB DIVISION MAUGANJ
B.T. Renewal work on old NH 547 Through Harrai Town After Construction of By Pass On NH 547 MDR Road Km 1to6 8 5.80 Km, Old NH 547 Through Amarwara Town After Construction of By
ZONE NO.-03, WARD NO.-11-12-13 CONSTRUCTION OF BITUMINOS ROAD OVER EXISTING OLD RCC ROAD FROM NH-7 MAIN ROAD TO COMMUNITY HALL (SHIV NAGAR ROAD) VAI T.D.S. GARDEN AND ATTACH ROAD UNDER KAYAKALP SCHEEM.
PROVIDING AND FIXING RETRO-REFLECTED SIGN BOARD AS PER IRC 67-2010 ON NH-346 DINARA-CHANDERI-MELUA CHOURAHA ROAD KM 0 TO 195 AND SAVAI MADHOPUR, SHEOPUR, GORAS, SHYAMPUR, SABALGARH ROAD KM 114 TO 188 KM
Fixing of Road Side Furiniture from km 72 to 81 Km 83 to 92 93 to 98 99 100 104 105 107 to111 113 114 to 117 to 119 and 123 of NH 539 Shahgarh Tikamgarh Road
Balance work of wind breaking wall with GI profile sheet from main gate towards Manager Office Umaria Mine and Main Gate towards east corner of NH Road at Piparia Mine of Umaria Sub Area of Johilla Area.
ZONE NO.-03, WARD NO-15, CONSTRUCTION OF RCC DRAIN AND CC ROAD FROM SMT. SAROJ TOMAR, SMT. MANISHA PATHAK HOUSE TO MAIN ROAD NH-7 AND MANISH TRALORS TO SHRI CHANDRAMANI UPADHYAY, SHRI RAMNARESH UPADHYAY HOUSE.
Consultancy Services for Authoritys Engineer for Supervision of Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to 2lane with PS configuration in the state of Madhya Pradesh
DEVELOPMENT OF NEW A SITE RO AT LOCATION- WITHIN NAGAR PANCHAYAT LIMIT OF NAI LEDRI (NOT ON NH/SH), DISTT. MANENDRA CHIRMIRI BHARATPUR, LOC NO. 20 SRMP 2023 UNDER RAIPUR DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
(1) Constuction of Baksana Puliya to Nizampura Ghatabillod Road I/C LT/HT Pole Shifting Length 2.015 K.M. (2.) Construction of NH-59 to Manpur Lebad (Link) Road I/C LT/HT Pole Shifting Length 0.80 Km
Upgradation of Jirapur-Pachore Road including Pachore-Jirapur-Chhapiheda and Khujner Bypasses from 0.000 to 58.790 (Design Length 58.79 Km) section of NH-752C to 2L and PS in the State of Madhya Pradesh under EPC mode
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF UP-GRADATION OF PICHHORE-DINARA SECTION OF NH-346 FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE.
REPAIR OF ROAD WORK IN 46/200 TO 50/400 4.40 KM ON NH 135B SIRMOUR DABHOURA ROAD NH SUB DN REWA
ROAD MARKING, PAINTING AND FIGURING WORK ON TONK TO CHIRGAON ROAD NEW NH-552 KM 144 TO 147,163,165,166,167,169,171, 181,210 AND 211, SHYAMPUR GORAS ROAD KM 76,77,106 AND 116, GORAS SHEOPUR ROAD 89,91,92,93,95,111,112,113 AND 114 KM TOTAL LENGTH 27.00
DEVELOPMENT OF NEW A SITE RO AT LOCATION WITHIN 5 KM FROM PRE METRIC ADIWASI BALAK HOSTEL, TONGPAL ON NH-30 TOWARDS SUKMA JAGDALPUR SUKMA ROAD ADV LOC.394_2023 UNDER RAIPUR DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode
PROVIDING AND FIXING STEEL PIPE RAILING AT BRIDGES IN KM 11/2, 11/10, 32/10, 36/4, 61/6, 93/4, 96/2, 99/2 ON DINARA- PICHORE-CHANDERI-MELUA CHOURAHA ROAD LENGTH 554 MTR. NH-346
BT RENEWAL WORKS ON 1.MAIHAR TOWN (299/8 TO 304/6) ROAD 4.20KM, AND 2.GHUWARA ROAD (320/8 TO 323/8) ROAD 1.60KM, AT OLD NH-7, 3.PONDI APPROACH ROAD 1.50KM, UNDER SUB DIVISION MAIHAR
BT RENEWAL OF ROADS 1-PADARIYA KALA ( KUNDALI) TO SIYALWADA LENGTH 4.83 KM.,2-NH12 TO BHADON LENGTH 2.25KM.,3-NH-12 TO ANGHORA LENGTH 1.00KM,4-PANJRA TO JAM LENGTH 1.90 KM , TOTAL ROAD LENGTH 9.98 KM.
B.T. renewal of Central School Road Court square to Income Tax office NH junction Old Jail Square to Sabban Square Road and Internal roads of Old Central Jail under City Sub Dn no. 3 Bhopal Length 3.20 km.