Loading…
Loading…
2,086 results • Best match
Maintenance work from Km 61.500-67.380, Km 80.940-88.640 and Km 108.933-116.263 Tiger Corridor on Itarsi-Betul Section of NH69 New NH46 in the state of Madhya Pradesh
Reconstruction of MNB and Profile raised at flood damage portion from km 40.700 to 41.200 and 43.120 to 44.819 of Bhopal Sanchi section from km 0.000 to km 53.775 of NH86extn. New NH146 in the state of MP
Restoration of alligator cracking on four lane of Baran Shivpuri section from Ch. 1251.814 615.814 (RJMP Border) and 0.00 (MP) to 1305.087 (54.087 MP) of NH27 in the state of MP
Maintenance work from Km 61.500 to Km 67.380, Km 80.940 to Km 88.640 and Km 108.933 to Km 116.263 on Itarsi Betul Section of NH69 New NH46 in the state of Madhya Pradesh-2nd Call
Independent Consulting Services during Operation and Maintenance Stage for 4laning of Indore Khalghat Section of NH52 Old NH3 from km. 12.600 to km. 84.700 in the state of MP on BOT basis under NHDP phaseIIIA
Rectification of Black Spot Accident location and other allied works from Indore Edlabad road from Km 9.00 to Km 143.00 at PIU Indore in the State of Madhya Pradesh
IE Services for O and M stage of 6 laning of Indore Dewas Section of NH3 from Km 577.550 to Km 610.00 and Km 0.000 to Km 12.600 (Approx Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase V to be executed as BOT (Toll) Project on DBFOT
Independent Engineer Services for Operation and Maintenance Stage of 4laning of Indore Gujarat MP Border on BOT Toll basis from Km. 9.500 to Km. 171.000 of NH59 on DBFOT in the State of MP under NHDP PhaseIII
Design and Construction of 03 VUP for permanent rectification of MoRTH identified Blackspot locations at Piparsama Chauraha 120.400 on GwlShiv Section of NH46 Sillarpur Tiraha 1339.900 and Mungawali Tiraha 1345.100 on ShivJhansi section of NH27 in MP
Construction of SVUP, LVUP, VUP at Km 109.420 Bhaghel Dhaba at Km 111.360 Police Station Ruthiyai bypass at Km 116.140 NFL at Km 118.400 Sada Colony and at Km 137.020 Barkheda Khurd alongwith Junction Improvement at K. 119.140 Bharsula junction/JP
Maintenance Improvement in riding quality and Periodic Repair of 6 lane highway 45km and service road 58km linear length including maintenance of structures and lightening of Indore Dewas section of NH52 from km. 577.550 to km. 640.000 and km. 0.000
Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of 1251.814 615.814 RJ MP Border) and 0.00 MP to 1305 087 54.087 MP tolling reach of Ramanagar Toll Plaza of Baran Shivpuri Section of New NH27
Routine Maintenance of the tolling stretch of Mundiyar Toll Plaza from Km 1184.322 to Km 1251.814 Total Length of 67.492 KM
Strengthening of Service road from Ch. 315.725 to Ch. 323.350 with white topping and reconstruction with PQC from Ch. 323.350 to 324.000 on Bhopal Biaora section of NH46 in the state of MP on EPC mode
Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of 1305.087 54.087 MP to 1305.087 54.087 MP tolling reach of Raksha of Shivpuri Jhansi Section of New NH27 in the state of MP and UP
Call for providing, running and maintenance of Mahindra Scorpio-N or equivalent commercial vehicle under PIU Bhopal.
Call for providing, running and maintenance of Toyota Innova Hycross or equivalent vehicle for PIU Bhopal.
Invitation of equotation from Empaneled agencies under RO Bhopal to take up the Compensatory Tree Plantation works of 24000 No plants for 6lane with both sides Service Road of Ayodhya Bypass from Design Km 0.000 to Km 16.439 in the state of MP as per
Invitation of equotation from Empanelled agencies under ROBhopal to take up the Compensatory Tree Plantation works of 23000 No. plants for 6lane with both sides Service Road of Ayodhya Bypass from Design Km 0.000 to Km 16.439 in the state of MP as pe
Invitation of equotation from Empanelled agencies under ROBhopal to take up the Compensatory Tree Plantation works of 23000 Nos. plants for 6-laning with both sides Service Road of Ayodhya Bypass from Design Km 0.000 to Km 16.439 in the state of MP a
Construction Of Balance Service Road at Pilukhedi and Biaora end alongwith RCC Drain and Development Of Median Opening and Junctions Improvement on BPL Biaora Section NH12 New NH46 from Design Km 324.00 to Km 421.325 in the state of MP
Upgradation of NH-39 Jhanshi to Ranchi Sakariya-Kakrahti- Gunor-Dighoura NH- 943 Pawai to Nagod Road Length 29.00 km Under CRIF Scheme
Repair of Road Work in Km. 44/1000 to 49/800 5.00 Km. on NH-135B Sirmour - Dabhoura Road (NH Sub - Division Rewa)
2x660 MW, Stage-II, SSTPP- Excavation, loading of pond ash from Ash dyke of SSTPP, Dongalia, Distt. Khandwa, transporting and unloading for construction of flyover at Rasalpur junction on Indore-Dewas bypass (NH-52) under Indore-Ujjain-Omkareshwar Co
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN VILLAGE BAHARAGAON AND VILLAGE HARDAKHURD EXCLUDING VILLAGE BAHARAGAON BUT INCLUDING VILLAGE HARDAKHURD ON NEW NH 47 LOC NO 269 SRMP 2023 UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Consultancy Services for Authoritys Engineer for Supervision of Upgradation to 2-lane with paved shoulder of Jirapur-Susner Road, Khilchipur Bypass and Biaora Bypass Total design length 57.29 km Section of NH-752B in the State of Madhya Pradesh
Preparing DPR for Construction of road from newly constructed ROB (on railway) Harda byepass junction to Narmadapuram Bhopal (NH 69) via Fefartal village, through behind SPM. 1st Call, PAC Rs. 4.08 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upt
Construction Of NH Main Road Matguwa To Gobran Hanuman Mandir Road Length 3.00 Km., Lalguwa To Narayanpura Road Length 2.20Km., Madelanpurwa To Baredi Ka Purwa Road Length 1.00Km., Jujharan Purwa To Angour Road Length 2.10Km., Behta School To Pathar
Excavation, loading of Pond ash from Ash dyke/Silos of SSTPP, Dongaliya, transportation and unloading at construction site of 4 lanning of Balwara to Dhangaon section of NH-347BG Indore-Boregaon Pkg-III Under Bharat Mala Pariyojna Phase-I
STRENGHTING WORK OF NH-52 TO CHAINPURIYA BAMLABAY ROAD LENGTH - 4.40 KM and BAMANGANV - CHATUKHEDA - BAMLABE BT.ROAD CH.14800 TO 18600 LENGTH - 3.80 KM TOTAL LENGTH 8.20KM PAC Rs. 539.89 lacs First Call on Road and Bridge SOR 25.03.2022
Independent Engineer Services during O andd M Period of 4 lane Shivpuri Guna Including Guna Bypass section of NH 46 from Km 125.430 to Km 223.130 Total Length 97.700 Km under DBFOT pattern BOT Toll Mode NHDP Phase IV
E TENDER FOR COLLECTION OF USER FEE,REFURBISHMENT/REPLACEMENT OF TMS EQUIPMENT,ROUTINE MAINTENANCE OF PROJECT HIGHWAY ON THE BASIS OF COMPETITIVE BIDDING AT PURANKHEDI TOLL PLAZA FOR SHIVPURI GUNA SECTION OF NH 46... FROM KM... IN MADHYA PRADESH
Patch Repair Work in Km. 111.750 to 112.250 , 0.50 Km.on NH75 Extn
Patch Repair Work in Km. 120.045 to 120.445 0.40 Km. on NH75 Extn
Patch Repair Work in Km. 120.845 to 121.245 , 0.40 Km. on NH75 Extn.
Patch Repair Work in Km. 111.300 to 111.750 , 0.45 Km. on NH75 Extn
Patch Repair Work in Km. 121.245) to 121.655 0.410 Km.on NH75 Extn. Rs. 19.94 Lakh
Excavation, loading of Pond ash from Ash dyke/Silos of SSTPP, Khandwa transportation and unloading at construction site of 4 lanning of Tejaji Nagar to Balwara section of NH-347BG Indore-Boregaon Pkg-II Under Bharat Mala Pariyojna Phase-I
Rehabilitation Upgradation and reconstruction of existing intermediate lane to 2-lane with paved shoulders configuration Barna River to Ken River length 34.000 km on Gulganj-Amanganj-Pawai-Katni NH-43 Ext. in the state of Madhya Pradesh on EPC mode
Maintenance of Road on NH 543 in Balaghat-Lamta Nainpur stretch, city portion Balaghat, Rajegaon stretch Total length 38.50 Km of Mandla-Dindori stretch and removal of Land slide material of Sagartola Shahdol stretch in the State of Madhya Pradesh
Special Strengthening Of Old NH-75 Rampur Town Portion (km 186/2 to 191/2 5050 M. Length 5.050 km. Ragauli App. Road Length 2.0 Km Kaima to Sagma Road Length 2.0 K.M. Total Length 9.05 k.m. under Sub Division Satna
Construction of ROB in Lieu of Level Crosing No. 331 in Railway KM 1019/2-3 of Jabalpur-Katni Section on NH-30 Gosalpur Agariya to Pratappur Road in District Jabalpur. in the state of Madhya Pradesh. on EPC Mode
Strengthening of Taraganj to Babdliya (Km 5.20 to and 7.20) Padlyamata To Gulawata km( 0 to 300 and KM 4 .00 to 6.00) and Sarangpur city Portion Old NH 3 AB road (1km CC road) road Total Length 5.30 km
Special Strengthing of Chandpur Approach Rd,(2.20 KM) n Binapur,Matabedri,Devpur, Shahpur Road, (6.30 KM) and Renewal of Tarasewaniya to Chandu khedi Road,(2.70KM), NH 12 to Berkheda Bonder Forensic lab Rd,(1.7KM) n Gandhi nagar to Dobra Rd,(2.1km
Construction of Narmadapuram Harda road (SH. 15) to Obedullaganj to Nagpur (Old NH. 69) road upto Bhopal tiraha. 1st Call, PAC Rs. 457.88 Lacs on Road Bridge Works SOR 25.03.2022 (Ammendment upto date), Completion period 300 days i/c rainy season.
BT RENEWAL ON OLD NH-3 AB ROAD RAJEEV GANDHI CHOURAHA TO RAU ROTARY CH. 0 TO 2200, CH. 3100 TO 6350 TOTAL 5450 MTR BT PAVEMENT AND CH. 2200 TO 3100 TOTAL 900 MTR CC PAVEMENT TOTAL LENGTH 6.35 KM
Constn. of Betul Stantion Road (Kargil Chowk, Bachha Jail , Akhara Chowkm, Gadaghat to Old NH-69) Road. Length 2.70 Km. PAC 578.94 lacs First Call on Road and Bridge SOR 11-04-25 work period 180 days I/c rainy season
Short Term Maintenance of Dinara-Pichhore-Chanderi section of NH 346 Ext from km 3, 4, 11, 12, 15 to 17, 19, 21 to 25, 34 to 36, 86 to 95 total length 26.00 km in the state of MP
B T Renewal on Khaddevra Rd, Gonjhi to Mohandas Ashram , Mali Mohgaon Tirahe to Khapakala, Pondi Basaniya, Sahjani to Chirdongri, NH 12A to Kudwan. Dhourgaon app , Babeha Jujhari to Bakchera Gondi and Sagar app Rd L1.40 km T- Length 14.70 km.
Work contract of Transportation of the ash from Ash DykeII of SGTPS Birsinghpur Distt.Umaria MP to Construction site for rehabilitation and up-gradation of Umaria to Shahdol section of NH-78 from KM. 68/4 Umaria Bypass to Km 142/4