Loading…
Loading…
2,086 results • Best match
Rehabilitation Upgradation of Kurwai Mungaoli Chanderi road section of NH-346, Total Length- 83.1 km to Two lane with paved shoulder configuration along with one time improvement in 07 nos. of bypassed total length of 22.615 km on EPC mode
Consultancy Services for Preparation of Detailed Project Report for 4/6 lanes /4/6 lane with Paved Shoulder configuration for the stretch of Gwalior-Bhind upto MP/UP Border (NH-92), Total length 108 Km in the State of Madhya Pradesh
Tamprarory rectification (cutting of hilly portion and extra widening of inner side of curve) of Accident Prone Area Legdha Ghat in Km 41/4-6 on NH 347 B Betul(Khedi)-Ashapur Road in the state of Madhya Pradesh (5th call)
BT Renewal work in Km 24.46 (Deshgoan Junction) to Km 87.36 (Khargone Bus Stand Junction) and Km 89.76 (T Junction Navgrah Mandir ) to Km 91.5 Total length 64.65Km on Deshgoan -Khargone road NH 347 B in the state of Madhya Pradesh
Strengthening of intermediate lane with Earthen Shoulder flexible Highway from Dholkhedi near Vidishaat km 9/2 to Meluha Square at km 68/10 on NH-346 of Total length 60.00 km with Earthen shoulde configuration in the state of Madhya Pradesh
Short Term Improvement, Routine Maintenance including Incident Management services and Emergent Overlay works in Agra Gwalior section of NH 44 from KM 13.000 to Km 103.000 in the state of Uttar Pradesh Rajasthan and Madhya Pradesh on item rate percen
Construction of Krashi Upaj Mandi Badora Betul Back Side to NH-47 Road. Length 1.50 Km. PAC RS. 586.05 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 240 days i/c rainy season
Construction of Approach road from thodaha to Baskhala Village and ic 05 Nos Hume Pipe Culvert and Plantation and Construction of Approach road from Kotma Keshwahi Road Banjari Chouk Burhanpur Village Pateratola NH 43 including 04 Nos Hume Pipe cu
Restoration Maintenance of road in km 1 to 3 7 to 8point 60 18 to 20 26 to 27 30 to 44 46 to 48 53 56 62 63 equals 31 point 60 km of Nainpur balaghat stretch on NH 543
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Upgradation of Jharkheda- Berasia - Dholkhedi from km 0/000 to km 87/900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN KM STONE 490 AND 495 ON LHS WHILE MOVING FROM NARMADAPURAM TO BETUL ON NH 46 DISTT HOSHANGABAD ADVT LOC 300 2023 UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC
Estimate for Repair of Road Work in Km. 63/200 to 67/1000 5.00 Km. on NH-135B Sirmour Dabhoura Road (NH Sub - Division Rewa)
Estimate for Repair of Road Work in Km. 57/200 to 61/1000 5.00 Km. on NH-135B Sirmour - Dabhoura Road (NH Sub - Division Rewa)
Consultancy services for FS DPR survey and preparation of land plan for widening to two lane with paved shoulders from Sagara Havinahalli Holebaglu Kalasvalli Sighandoor Markutka junction with NH766c in Karnataka
Construction of Cow Shelter as Gau Raksha, Sadak Suraksha Kendra and deploying a 2-wheeler patrolling vehicle to enhance the road safety aspects of the project highway affected due to the cattle sitting on main carriageway
Biennial Job contract for External and Internal painting of Residentialbuildings (NH - 2, NH-3 and other areas) for the year 2022-24 at NTPC-Vindhyachal township.
BT renewal on various roads under PWD Distt. Sub division no.1 indore a) Old NH 59, indore ahmedabad Road , kalariya village portion - 1.70 km b) bagoda approach road - 1.60 km c) jhalara dhureri road - 1.00 km d) betma salampur inayatpura road - 1.5
Performance based Maintenance contract on Rigid Pavement from km 41/800 to km 82/300 (Ashta Shujalpur section) including White Topping from km 82/300 to km 85/180 on NH 752C (Total Length 43.38 km in the state of Madhya Pradesh
STMC of Porsa-Ater-Bhind section of NH 552 Ext from KM 285.750 to Km 343.800 (Length 51.06 Km) Excluding Length of under construction greenfield Ater Bypass (km 326.650 to 329.450, length 2.80km) road length under DLP upto June 26 (4.19 km)
FIXING OF ROAD STUDS ROAD MARKING RETRO REFRECTIVE BOARD FOR CULVERTS AND MEDIUM BRIDGES SITUATED ON SHARP CURVES IN KM. 20/4, 23/4, 26/4, 28/2, 31/4, 36/6, 37/6 AND 40/2 ON AMBUA DAHOD ROAD NH-56
Construction and Widening from Pachor Soyat NH Road Junction to Sirpoi Colony Via Jhadmau including Jhadmau Bypass Road Total Length - 13.20 KM PAC 2728.77 lacs First Call on Road and Bridge SOR 11-04-25 work period 730 days I/c rainy season
B.T. Renewal Work of (1) Madhesur to Mothegoan Road Length 2.52 K.M. (2) Bamhori Ghat Approach Road Length 1.00 K.M. (3) Kareli Pipariya Rankai Road Length 1.70 K.M. (4) Gadarwara Tendukheda Road to Bikor Road Length 4.30 K.M. and (5) NH-26 Suatala
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16km) and Ater realignment to Bhind bypass (Total length 21.50 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of MP on EPC MODE
(1) Cleaning/Desilting of various drains in mine, Cleaning Desilting of Siltation pond, Cleaning of existing Garland drains at the toe of external dump at Block-B Project (2) (a) Cleaning of existing Nallah From Kudwa Village to NH 75 E Bridge...
Excavation, loading of Pond ash from Ash dyke/Silos of SSTPP, Dongaliya, transportation and unloading at construction site of 4 lanning of Raghogarh to Nanasa section of NH-47 under Bharat Mala Pariyojna Phase-I Economic Corridor in the state of MP
Consultancy Services for DPR for Construction of 6 lanes elevated corridor and deve. of road, Prabhat Chouraha to Ratnagiri Tiraha, ITI Tirah to Chetak Bridge, Gautam nagar to Veersawarker setu, CSIR AMPRI to Misrod section of NH-46 L-18.20 Km in MP
Construction of Semara app. Road Length 0.60 Km. Gram Panchyat Sarbaka, Mising link lf Oberi Khokham to Bari Janction Road NH-7 from Ch. 3300 to 3415, 5280 to 5385 and 5820 to 6000 Total length 400.00 mtr. under Sub Division Amarpatan
Patch repair work on - 1- Maihar NH-7 City Portion L. 4.26 k.m. 2- Swetanahar Kalyanpur Road L- 2.00 k.m. 3- Ajmain Bairagal Road L-1.70 k.m. 4- Nadan Kariya Road L- 4.00 k.m. Totel Length 11.96 k.m. under sub Division Maihar
Strengthening of NH-543 Balaghat-Nainpur road in km. 17, 51/2,4, 51/6,8,10, 64, 65, 66 and 67,68 (7.00 m width) of Balaghat-Nainpur stretch Total Length 4.00 Km (Portions of Road Diverted by Railway Department) in the State of Madhya Pradesh
Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design length 19.20 Km in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM)
Reinvitation of bid for Construction of Canal Crossing Structure below the Constructed Highway along with service road at Km. 357.075 of Rewa Katni Jabalpur Pke 2 Section of NH 30 Old NH7 in the State Madhya Pradesh on item rate percentage basis
Engagement of Manpower Service Provider for collection of User Fee on Mohtara FP under Tolling Operation Maintenance Transfer of Rewa Katni Jabalpur lakhnadon Section from Km 656.000 to Km 891.780 of NH 30 and 1358.000 to Km 1428.557 of NH34 in MP
Construction of Four lane of Sarangpur city Portion Old AB road NH 3 road length 7.00 km and Providing Pole Shifting and height raising of 33kv, 11kv LT line and DTR Shifting in Sarangpur city portion road PAC 3614.37 Lacs Second call
Construction of Ramleela to Gallamandi Chowk via Bajariya Chowk length 1.60 km., NH 86 to Karaiyakheda road length 2.40 km. ,Kiri Mohalla to Baraipura Chowraha length 1.20 km.Ttl Lngt 5.20 km.PAC 979.03 lacs 5th Call on Road and Bridge SOR 11-04-25
Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.59km to 2 Lane with paved shoulder configuration along with one time improvement in 5.88 km length in the State of Madhya Pradesh on EPC Mode
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Sarvardevla to Pal (MP/MH Border) section of NH-347C from design Ch 81.600 to 137.400 to 2L PS configuration along with OTI of 1.95 km in the State of Madhya Pradesh
Excavation, loading of Pond Ash from 111-hectare Ash Dyke of STPS, Sarni Distt. Betul (M.P.), transporting and unloading at construction site of road projects of NHAI (4 Lanning project of Itarsi-Betul section)
B.T. Renewal Work On Remaining Part of under P.W.D sub division Khurai Rs. 211.97 Lac (Group-1) (1) NH-26(Bandri) Length- 3.00 Km Rs. 89.47 Lac (2) NH-26(Barodiya) Length- 2.80 Km Rs. 83.47 Lac (3) NH-26(Rajwans) Length- 1.30 Km Rs. 39.03 Lac
CONSTRUCTION OF TALOD TO TALDI SONKATCH ROAD LENGTH 3.20 KM, JAMODI TO AGERA ROAD LENGTH 2.60 KM, CONSTRUCTION OF CULVERT AT SONKATCH AND KARADIYA COLONY TO NH ROAD LENGTH 1.00 KM AND CHAYAN MAINA TO MALVIYA MOHALLA ROAD LENGTH 0.25 KM WITH UTILITY S
CONSTRUCTION OF 6-LANE CEMENT CONCRETE ROAD FROM MAKSI BY PASS CHOURAHA TO BHOPAL CHOURAHA CHAINAGE 0 TO 2020 M, 2520M TO 3400M TOTAL 2900M AND WIDENING AND BEAUTIFICATION OF 6 LANE B.T. ROAD BHOPAL CHOURAHA OLD A.B. ROAD OLD NH-3 CHAINAGE 3400
Original Repair OR (DPP) estimate for highway NH 135 B Dabora-Sirmour-Rewa from km 4.500 to km 75.750 (excluding 23.400 to 24.080, 36.750 to 37.300, 49.840 to 50.900, 55.400 to 56.200, 58.00 to 59.00 and 65.810 to 66.800) in the State of MP
Maintenance Work of 2 lane 37.400 Km, 2 lane with paved shoulder 4.5 Km, 4 lane with divider 5.00 Km, Total 46.98 Km Garra-Waraseoni-Tumser upto MH Border section of NH-543K under Short Term Maintenance Contract in the State of Madhya Pradesh.
Estimate for providing of 7 No Mid Span for 11 KV Line and 2 No mid span (13 mtr H- Beam) for 33 kv Line NH Betul Harda near khedi, hiwarkhedi to danora in khedi dc O and M Division Betul-South in Betul Circle
CONSTRUCTION OF VARIOUS TYPE OF BUILDING AT SIDHI SINGRAULI ROAD DUE TO REHABILITATION FOR km.82.40. TO 187.993. SECTION OF NH 39 TO FOUR LANE WITH PAVED SHOULDER IN THE STATE OF M.P.ON EPIC MODE UNDER MPRDC WITHH WATER SUPPLY, SANITARY FITTING AND E
B.T. Renewal work on Various Road Under PWD sub-division Jhabua. (1) Kalidevi Roatla Nawada Dhochka Road 3.3 Km. (2) Khardubadi to Rotla Road 5.96 Km. (3) NH-59 Machhaliya to Mrugarundi Road 4.78 km. (4) Rajla Main road to Waglawat Mohaniya Road 4.
ZONE NO.-03, WARD NO.-11-12, CONSTRUCTION OF BITUMINOS ROAD OVER EXISTING OLD RCC ROAD FROM NH-7 NEAR SHRI ANAND BADKUR HOUSE, SHRI DUBEY JI HOUSE, VINDHYANCHAL COLLEGE, SHRI PUSHPRAJ SINGH HOUSE AND SONI KIRANA TO SHRI LAKHAN SINGH HOUSE UNDER KAYAK
SPECIAL STRENGTHENING OF 1-MDR MP 30-42 ROAD FROM KARONDI-TIGGDDA AT SH,31 TO CHILL SILWANI-SILARI AT NH-12 VIA MULTIPLE ROADS PAC Rs. 581.60 lacs First Call on Road and Bridge SOR 25.03.2022 work period 120 days i/c rainy season
Patch repair work on Internal Road NH- of Amdara L-1.80 k.m., Pakariya L-1.10 k.m., Sabhaganj Pathrahata L-2.70 k.m., Jhukehi L- 4.50 k.m., Mahidar L-1.00 k.m., and Ghunwara Budhagar Road L-1.60 k.m. and Yaduveernagar Semra Road L-1.30 k.m. Totel Le
BT Renewal Work on App. Roads of Govt. Buildings at Chhatarpur Length 2.00 Km. Chhatarpur Pathapur Road Length 2.00 Km. Devpur Khandevra Road Length 1.50 Km. App. Roads of Rest Houses Circuit Houses of Dn Chhatarpur Length 5.50 Km., NH.75 to Karri vi