Loading…
Loading…
54,529 results • Best match
IE services for 6-laning of Kozhikode Bypass (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 from Design Chainage km 230.400 to Design Chainage km 258.800 (total length 28.400 km) in the State of Kerala under NHDP Phase-III on HAM (2nd call
CS for AE for Cons. of 6 Lane Elevated corridor from 612.582 to KM 617.540 including cons. of dedicated flyover towards Kolhapur City on NH 48 in Flood Affected Zone of Kolhapur (Descoped work of Kagal Satara PKG1). 2nd level Ramp(0.000-1.263) in MH
Construction of 6-lane access controlled GH from km35.000 to km67.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ-RGBS-Package-2
Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JK (Phase II-PKG-XVIII)
Consultancy Services for AE for SC of 6-lane access controlled Greenfield highway from km 67.000 to km 130.073 of RGBS section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in Gujarat on EPC mode under BMP (Phase-I) Package-10
Construction of Balance work of 2 Laning with Paved Shoulder from Km 30.800 to Km 70.800 and 2 Laning without Paved Shoulder with Rigid Carriageway from Km 70.800 to Karnataka-Goa Border km 84.120 of NH-4A in the State of Karnataka on EPC mode
CS for AE for Supervision of Construction of 6-laning from Belgaum to Sankeshwar Bypass from Km.515.000-Km.555.017 (Package-I) and Sankeshwar to MH-KNT Bypass from Km.555.017-Km.592.853 of NH-48 in Karnataka under BMP (Package-II) on EPC mode
CS for AE for Construction of 4 Lane EH and improvements at Gopalganj Town Ch 384.000 to Ch386.750 on NH 28 on EPC Construction of leftover portion of addi 2lane Gandak and rehabilitation of operational 2lane Gandak in 423to Km 424 of NH28 in Bihar
IE Services for supervision of 4L of Belgaum-Hungund-Raichur from Ch.89.900-Ch.136.100 (Pkg-3) and Ch.136.100-Ch.182.300 (Pkg-4) in Belgaum Hungund Raichur section of NH748A in Karnataka on HAM under NH(O) Total 92.400 Kms (Package-3-4)
AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) PKG II (FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150)) AND (II) PKG III FROM PINDARI (KM 78.150) TO RAWALGANJ BYPASS (KM 117.120) IN UP ON EPC
Construction of 6-lane access controlled GH from km4.888 to km35.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP (Phase-I)AJ-RGBS-Package-1
IE services for Construction of 4-lane AC New GF Highway Section Mancherial-Warangal from Pangidipalle village at Ch.72.350 Km-Oorugonda village at Ch.112.240 Km Length 39.890 km under EC NH-O as part of Nagpur-Vijayawada on HAM in Telangana PKG-III
Construction of Elephant Underpass (from km. 153.853 to km 153.953) Flyover (from km 137.966 to km 138.034) 2 no. Box Culverts (km 153.679 and km 137.761) and other road safety works in Kharagpur Chichra section of NH-06 in West Bengal on EPC Mode
Consultancy Services For AE For Supervision of 4-laning of Balwara to Dhangaon section of NH-347BG and 753L (Indore to Boregaon-Pkg III) Design Ch. 42.260 to Design Ch. 82.810 under Bharatmala Pariyojana Phase-I in the State of MP on EPC Mode
Construction of 2 nos of Flyover on Omarpur Junction of NH34 from Design Ch. 245.50 to Design Ch. 247.500 (Length2.0 km) and on Dhulian Junction of NH 34 from Design Ch. 274.300 to Design Ch. 276.500 (Length2.2 km) in West Bengal on EPC Mode
Upgradation Strengt. of Exi. 2-4 Lane Carriageway to 4Lane from Ch.132.32 (Km.454.5) in Dhamasiya Village in Naswade Taluka to Ch.179.78 (Km.506.66) in Bitada-Movi Village in Netrang Taluka (TL47.46 Km) Section of NH-56 in Gujarat on HAM (Pkg-IV)
Consultancy Services for AE for SC of 6-lane access controlled Greenfield highway from km 4-888 to km 67-000 of RGBS section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in Gujarat on EPC mode under BMP Package-9
Consultancy services for AE for Supervision of Construction of New Twin tube 6-lane tunnel at Khambatki Ghat section of NH-4 and its approaches from existing km.771.730 to existing km.782.000 in the state of Maharashtra under NHDP Phase-V on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Engagement of user fee collection agency on the basis of CB through e-tender for Andhiyari FP at km 85.195 for the use of 2 lane with paved shoulder of Raebareilly-Allahabad Section from km 108.800 to km 188.600 of NH-24B in Uttar Pradesh
IE Services for supervision of 4-lane with paved shoulders from Ch.0.000-Ch.43.800 Pkg-1 and Ch.43.800-Ch.89.900 (Pkg-2) in Belgaum Hungund Raichur section of NH748A in Karnataka on HAM under NH(O)Total 89.900 Kms (Package-1-2)
Engagement of user fee collection agency on the basis of CB through e-tender for Banthadi FP at Km 34.000 on the project of widening and strengthening of 2 lane Nimbajodha Degana Merta City section of NH-458 Km 0.000 to Km 139.900 in Rajasthan
Construction of 4-Laning of Ramban-Banihal NH-IA from Ch.165.092-Ch.171.855(NB) from Ch.166.895-Ch.173.638(SB) excluding from Ch.166.610-Ch.167.150 (NB) Ch168.425-Ch168.935(SB) - Ch.167.960-Ch.168.168(NB) Ch169.745-Ch169.951(SB) PKG-III in JK on EPC
Consultancy Services for AE for Supervision of 4 Laning of existing 2 laning stretch from A Mohol at Pkg-I B Wakhri to Khudus a Pkg-II C Khudus to Dharampuri Pkg-III sections of NH 965 in the State of Maharashtra on EPC Mode
AE for Construction of 6lane Greenfield corridor from Ramnagar to Kacchi Dargah NH 119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
IE services for Construction of Proposed Narnaul Bypass Designed Length 24.0 km as an EC and Ateli Mandi to Narnaul Section of NH 11 from Km 43.445 to 56.900 Designed Length 14.0 km as a Feeder Route in state of Haryana on HAM Pkg-II
CS for AE for Supervision of Construction of 6-lane from km 72.0 to km 150.0 of Deogarh to Rajasthan-Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BMP AJ/Construction Supervision/Pkg-7
Engagement of user fee collection agency on the basis of CB through e-tender for Chapwa Distt. Maharajganj FP at km 11.070 for the section from km. 0.000 to km. 40.706 of 2 laning of Sonauli to Gorakhpur Section of NH-24 in Uttar Pradesh
CS-AE for Upgradation with Rigid Pavement of Existing 2-Lane Carriageway to 2-Lane Carriageway with Paved Shoulder from Ch.665.686 (Km.665.686) in Khanpur Village to Ch.710.470 (Km.710.483) in Karvad Village (TL 44.784 Km) of NH-56 in Gujarat on EPC
Engagement of user fee agency on the basis of CB through e-tender for Bathalapalli FP at Km 104.405 of NH-42 from Km 76/000 to Km 99/971 four lane paved shoulder and Km 99.971 to Km 134.00 of in Andhra Pradesh
Engagement of user fee collection agency on the basis of CB through Hitouta FP in Shahjahanpur at Design km 69.700 for the use of two lane with Paved shoulders of Puranpur-Khutar Section of NH-730 from design Km 38.000 to Km.82.000 in UP
IE services during O and M for 4 laning of Meerut-Nazibabad section from Km. 11.500 (11.500 Meerut) to Km. 39.250 (39.240 Behsuma) and from Km. 86.590(79.500 Bijnor) to Km. 112.545 (105.700 Jalalabad) of NH-119 (New NH34) in Uttar Pradesh under HAM.
Strengthening Road Safety works Including improvement and Routine O and M of Delhi-Gurgaon section of NH-48 Other works along the project highway from Km. 14.300 to 42.000 (Rao Tula Ram Marg in Delhi to Kherki Dhaula FP in Haryana) in Delhi Haryana
Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO
Consultancy Services for AE for Construction of new 6-Lane Access Control Prayagraj Southern GF Bypass from design Km 34.400 (near Dandupur) to design Km. 43.200 (near Mahuwari) Total length 8.800 Km PKG-1 under Phase-I in UP under NH(O) on EPC mode
Operation and Maintenance of 2/4 Lane with paved shoulders of stretch from i Km 154/000 to 187/000 of Mangalwarpet to Mallampalli section ii Km. 72/600 to 121/000 of Tanamcherla to Jamandlapally section of NH-765 in Telangana under (PBMC)
Construction of 6-lane access controlled GH from km99.000-km130.073 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ/RGBS-Package-4
Const of 4 lane AC New Greenfield Highway Sec (Mancherial Warangal) from Narva at Ch.3.834 Km to Puttapaka at Ch.35.300 Km (Total length 31.466 km) under Other EC NH(O) programme as part of Nagpur Vijayawada Corridor on HAM in Telangana PKG-I
Const of 4 lane AC New GF Highway Sec (Mancherial Warangal) from Pangidipalle at Ch.72.350 Km to Oorugonda at Ch.112.240 Km (Total length 39.890 km) under Other EC NH(O) programme as part of Nagpur Vijayawada Corridor on HAM in Telangana PKG3
Engagement of user fee collection agency through regular basis (e-tender) for Kovilvenni fee plaza at Km 59.000 of Nagapattinam to Thanjavur Section from Km 1.600 to Km 16.690 and fromKm 29.850 to Km 80.133 of NH-83 in the State of Tamil Nadu
Engagement of user fee collection agency on the basis of E quotation through e-tender at Gollaprolu fee plaza at km 13.550 for the section from Kathipudi to Start of Kakinada Bypass Section from km 0.000 to km 26.150) of NH 214 in Andhra Pradesh
Engagement of user fee collection agency on the basis of Competitive Bidding through E-Tender for Garhdevi Fee Plaza at km 203.000 of Four laning between Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH-39 in the state of Jharkhand Bihar on HAM
Routine Operation and Maintenance of Delhi-Gurgaon section of NH-48 and Other works along the project highway from Km.11.060-Km.42.000 (Dhaula Kuan in Delhi to Kherki Dhaula Fee plaza in Haryana) for a period of one year on Item Rate basis
Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under Bharatmala Pariyojana (Ph-I)(AJ/DRGB-Pkg-4
Engagement of user fee agency through E-Tender at Chapwa Distt. Maharajganj Fee Plaza at km 11.070 for the section from km.0.000 to km.40.706 (40.706 km.length) of 2 laning of Sonauli to Gorakhpur Section of NH-24 in the State of Uttar Pradesh
Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH66) from Ch. 56.200 (existing km 57.200) to Ch. 93.468 (existing km 95.650) (Total length 37.268 km) in the State of Kerala on HAM under BP in the category of residual works under NHDP
Engagement of user fee agency on the basis of e-quotation through e-tender for Khalghat Toll Plaza At design km 75.700 in District Dhar for the use of four and more lane of Indore to Khalghat section of NH 52 in Madhya Pradesh
Engagement of user fee collection agency on the basis of E quotation through e-tender at Manjuluru User Fee Plaza (at Km 66.700) for section from Losari to Machavaram (From Design Km.32.900 to Km82.300) of NH 216 in the State of Andhra Pradesh
2 AXES DRO FOR NH 1000CD MACHINE (Q3), 2 AXES DRO FOR NH 1500CD MACHINE (Q3)