Loading…
Loading…
54,495 results • Best match
Tolling Operation Maintenance and Transfer of six lane Handia-Rajatalab Section (from Km 712.900 to Km 785.544) of NH-19 in the State of Uttar Pradesh (TOT Bundle-9)
Consultancy Services for DPR preparation for 4-laning from Km.519.150 to Km.545.176 section of NH-53 passing through Badrama Wildlife Sanctuary Portion in the State of Odisha.
Construction work of 4-lane Highway from km 0.000 to 42.040 Bhopal (Ratnaigiri Tiraha) to Vidisha (Morikodi) of NH 146 under BMP in Madhya Pradesh on HAM (HAM) Mode.
Construction of 4 Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road Package 2) under Bharatmala Pariyojna in Madhya Pradesh on EPC Mode.
Construction of Four-Laning of NH-45 to Kushner from km 38.400 to km 74.700 (Jabalpur Ring Road, Pkg 3) under Bharatmala Pariyojna in Madhya Pradesh on EPC Mode
Engagement of user fee agency through EQ for Kingaon Fee Plaza MoRTH Toll Plaza at Km.21.200 of NH-548D for the project of rehabilitation and upgradation in Maharashtra
Balance Works for Four Laning of Vikravandi to Sethiyathope Section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC Mode
2-lane with Paved shoulder of Ujjain Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH 552G in Madhya Pradesh on EPC mode.
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)
Urgent protection to Hill side slope between Km.532/300 to Km 535/600 on NH-66 in the State of Goa under NH(O) Annual Plan 2024-25.
Development of new site Retail Outlet between KM Stone 185 to 165 on NH-40E (Old) NH-206 (New), District- West Jaintia Hills, State- Meghalaya under Guwahati Divisional office
Short Term Maintenance of (i) Kalyan - Nirmal - Jagtial road (NH-61) from Km 707/055 to 753/890 (ii) Nizamabad - Jagadalpur section of NH-63 from Km 0/0 - 21/500 and Maharashtra state border of NH-63 road from Km 10/350- 12/0 and from Km 14/200-14/45
S.T.B.T. TO NH-7 TO GAWA ROAD VR-61,CH.0/00 TO 1/500 TALUKA- HINGANGHAT - DISTRICT.- WARDHA
IRQP work from km. 63.00 to 70.00 (Marchula to Shankarpur) on NH-121(309) in the State of Uttarakhand
Construction of New A site RO at Chintamani on NH 234, Thimasandra, Chintamani Town under Bangalore DO of KASO.
SHORT TERM MAINTENANCE CONTRACT (STMC) WORK FOR KM 69/750 TO KM 76/600 (SAWAIMADHOPUR - SHEOPUR) NH-552E IN THE STATE OF RAJASTHAN (JOB NO. NH-552E-RJ-JAIPUR-STMC-2023-24-03)
Restoration of subsidence from Km 175.350 to Km 175.580 (Old KMC dumping site) on NH-29 under PWD (NH) Division-I, Kohima in the state of Nagaland under Special Repair during 2025-26
Strengthening work from km 8.40 to km 20.7 (12.3 km) By Using Waste plastic material on NH-69 on EPC mode under NH division Bhopal in the state of Madhya Pradesh(4th Call)
Treatment of 07 no. of landslide location on NH-134 from Dharasu to Yamnotri in the State of Uttarakhand under Annual Plan 2023-24 on EPC Mode.
Estimate for shifting of existing 11KV HT LT line of rural feeder above the under construction of ropeway between Chandigarh Manali national highway near pandoh dam reservoir Mata Baglamukhi Temple (Bakhli) distt Mandi in (E) section Saroa Pandoh
Construction of of road from National Highway to Mohalla Lundi by way of balance Earth work in Cutting,Cross Drainage,Walling and Providing and Laying 75mm thick WBM Grade-II in Km 1st and Km 2nd RD 500 .
Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with PS of Existing National Highway 122B Alignmentfrom Km 29.730 to Km 72.348 of Mahnar Bachhwara section in the State of Bihar on EPC Mode
Development of new A site RO with facilities like Sales Building Canopy Paver block driveway and other allied civil and electrical works at location within Municipal Limits of Hardoi Not on National Highway Distt. Hardoi under Lucknow Divisional
STBR/SOPD-G/Barhampur-06/35 Construction of RCC Drain from National Highway to KK Road (Lachit Nagar) under Mukhya Mantrir Path Nabikaran Aachani(MMPNA) under SOPD-G for the year 2025-26 of Nagaon District, Barhampur LAC
Proposed Construction of WBM Road From kachade Madam to National Highway 7 at Indira Gandhi Ward, Prabhag No. 17, In Municipal Council Hinganghat, Dist Wardha In municipal Council Hinganghat (Under Nagari Dalitettar Vasti Sudhar Yojana Funds (2023-2
road from Parkash Gali to Sageer Mohallaroad from main road National Highway to Tandwal Bridgemissing link Namberdar Mohalla to Upper Bakerwal Basti including approach road to Tandwal bridgeNational Highway to Tandwal ward NO 13 Missing link Shiv Man
Kodanda Rama Swamy LIS - Restoration of M.S. Pipe crossing National Highway-65 by Horizontal Directional Drilling method for Pressure main of Kodanda Rama Swamy Lift Irrigation Scheme located near Akupamula Village, Munagala Mandal of Suryapet District (2nd Call).
Repairs to Plaster Colouring Rain Water Lines Polymer Microconcrete, Flooring, Windows, Door, Miscellaneous items etc to Asst. Chief Engineer 1 an 2 Accountant Cabin Computer Room and Waiting Area National Highway PWD 5th floor Konkan Bhavan Annexe B
Installation of street light poles and electrification work at National Highway 8 to Shri. kailas Ravate Home and Nityanand Baswant Home to Madhukar Dubey Home and Various Place Ward Committee C in Vasai Virar City Municipal Corporation Area.
TILE WORK OF LINK ROAD FROM NATIONAL HIGHWAY TO RESIDENTIAL AREA NEAR HOUSE OF GHULAM HASSAN BABA,GH MOHD BHAT,MOHD ABASS HANJIWAR SINGHPORA BARAMULLA,UNDER CD-PYT FOR FY 2026-27,HALQA HW PAYEEN-A, BLOCK SINGHPORA
Construction of RCC Drain with Cover on Existing Drain And Providing And Fixing Paving Blocks Both Side of Road From H/o Mahalgave To National Highway At Prabhag No 11 Under Nagari Dalit Wasti Sudhar Yojana MC Bhandara
CONSTRUCTIO OF CC ROAD FROM BHAVANNA NIRMANA KARMIKA SAMGAN TO J.RAMBABU HOUSE RAOD AND ELEC POLE NO.105/A7 TO NATIONAL HIGHWAY ROAD PARK EAST SIDE ROAD AND SOUTH SIDE CROSS SIDE ROADS,AGRAHARAM IN WARD NO.1
Providing Decorative Median street Lights to Sankeshwar City Limits from Old P.B. Road heera sugar factory cross to Circuit house gate and from Rani Chennamma Circle to National Highway Bridge(5054-04-337-0-01-154 MDR improvement)
CONSTRUCTION OF RETAINING WALL AND PROTECTION WORK TO SLIDED ROAD PORTION DUE TO HEAVY RAIN IN SH-252 ROAD JOINING TO NATIONAL HIGHWAY-169 VIA MAGUNDI TO BALEHONNUR, CHIKKAGRAHARA ,AND KUDREGUNDI AT CHAINAGE 113.00 KM IN N.R.PURA TALUK.
Recarpeting of the road Chadchana-Kannur Siddapur Jalageri Babanagar Tikota Babaleshwar Karajol Mulwad almatti to join National Highway 50 from Km 163.44 to km 166.67 in Basavanagudi Taluk of Vijayapura District. H.A 4059-80-051-0-60-132
Construction of Approach Road and Protection Works at Chainage 1.25 Km to 1.35 Km and 1.39Km to 1.60 Km (Bridge at 1.35 Km) Girenahalli village to connecting National Highway No 50 (VR-118) in Sandur Taluk Ballari Dist
A M I No. 10.112 / 2023-24 Glyceryl Trinitrate 2.5mg TR/CR Brand :- Angispan TR 2.5 mg TP Mfg By:- M/s Sidmak Laboratories (India) Pvt. Ltd, Survey No. 4662, 4663 and 4779 & 4785 National Highway No-4
SH C.o R.wall at RD 172.880 to 172.900
SH Repair of potholes by providing and laying DBM 50mm thick and BC 30mm thick at RD 153.180 to 156.507
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa road section of NH-315A from design Chainage Km 12.240 to Km 26.342 (Package-C) in the state of Arunachal Pradesh.
Periodic Renewal of road from Km. 233.00 to km.239.00, Km 242.00 to Km. 244.00 and Km. 261.00 to 274.00 of NH-707(A) under Annual Renewal Plan 2021-22 in the state of Uttarakhand
RCC drain construction work from college to NH-2 under village Bhavli
Ward 8 hanuman temple to NH 12 Kishangarh cc road construction work
Rehabilitation of culvert at Km. 571/00 on NH-66 in the state of Goa (2nd Call).
Road side Jungle Clearance, Shoulder Repair and Trimming of Trees of NH-130B km 52.00 to 130.00
Widening of existing single lane intermediate lane to 2 lane from Km 135.00 to Km 147.00 and Km 156.00 to Km 168.00 of NH 61 New NH 02 in the State of Nagaland on EPC mode
Strengthening work from km. 125.00 to km. 132.00 and reconstruction of damaged drain and Protection work from km. 104.00 to km. 139.00 on NH-72 (New NH-07) in the State of Uttarakhand under EPC mode
RemainingWorkfor Strengthening and Widening work of existing road into 2 lane with paved shoulder from Pokhrauni Chowk to Junction with NH 57 near Jhanjharpur KM. 0.00 to 28.00 of NH.-527A in the State of Bihar.
Development of new A site RO at Tengnoupal on NH 02, Dist Tengnaoupal, Manipur
Repairing of bridge in Km 137 bate 4 on Narmada River of NH 45