Loading…
Loading…
54,495 results • Best match
Upgradation of existing highway to 2-lane with paved shoulders standard from Parsarma to Araria Section of NH-327E on Hybrid Annuity Mode in the state of Bihar
Engagement of user fee collection agency on the basis of CB through etender for Aaini FP at km 63.450 of NH-28C in the state of Uttar Pradesh
O and M of four/six lane of Ludhiana to Talwandi Sec of NH-95 (New NH05) from 85.980 to 170.000 in the State of Punjab on (PBMC)
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode
4 laning of Akkalkot to Solapur from km. 99.400 to km. 138.352 of NH-150 Extn including Akkalkot Bypass in the state of Maharashtra on Hybrid Annuity Mode
Limited RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Dukkavanipalem Fee Plaza of Anandapuram Pendurthi Anakapalle of NH-16 in Andhra Pradesh
Independent Engineer services for 4-laning of NH 98 from Km 23.284 Hariharganj to Km 57.049 Near Parwa More in the State of Jharkhand on Hybrid Annuity Mode
Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode
IE Services during Operation and Maintenance period of Lalitpur-Sagar-Lakhnadon (existing Km. 99.005 to Km 415.089) on NH-44 under TOT in Uttar Pradesh and Madhya Pradesh.
4 laning of Sagar Mohari section of NH 934 from Design Chainage 8.000 to 50.300 under BMP Phase I Economic Corridor category on EPC mode in Madhya Pradesh
Construction of 6 lane Indore western bypass from km 34.000 to Km 64.000 (Pkg-II) in the State of Madhya Pradesh on Hybrid Annuity Mode under NH(O)
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)
CONSTRUCTION OF 2L PS CONFIGURATION GANGAPUR CITY BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN (JOB NO. NH-23/RJ/2024-25/866)
Construction of four lane with paved shoulder of Darbhanga (Dilli More) - Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the state of Bihar
Short Term Maintenance from km 60.00 to 65.00 and road property maintenance from km 41.00 to 111.00 on NH-123(507) in the state of Uttarakhand.
Widening to 2 Lane from Existing Chainage Km 74.700 to Km 100.660 (Design Chainage Km 53.365 to Km 78.785) on NH 507 in the state Uttarakhand
Strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand
Strengthening from Km 149.00 (Ballupur Flyover) to Km 156.00 and km 162.00 to km 164.00 of including Junction Improvement at Kamla Palace of NH-72 (New NH-07) in the State of Uttarakhand under Annual Plan 2021-22
Performance Based Maintenance Contract PBMC under the jurisdiction of PWD NH Division Bengaluru for NH 766 212 NH 181 67 and NH 150A in the state of Karnataka
Short Term Improvements and routine maintenance of Surat - Bharuch from Km. 198.700 to Km. 264.000 section on NH-48.
NH to Nanosati
P355 NH Plate
REPAIRS TO PLASTER COLOURING RAIN WATER LINES POLYMER MICROCONCRETE, FLOORING, WINDOWS, DOOR, MISCELLANEOUS ITEMS ETC TO ASST. CHIEF ENGINEER 1 an 2 ACCOUNTANT CABIN COMPUTER ROOM AND WAITING AREA NATIONAL HIGHWAY PWD 5TH FLOOR KONKAN BHAVAN ANNEXE B
DIVERSION OF 132 KV D/C RISHRA - LILUAH TRANSMISSION LINE IN BETWEEN TL NO- 33 and 34 NEAR DANKUNI FOR PROPOSED SIX LANE EXTENSION OF DURGAPUR EXPRESSWAY BY NHAI AND ALLIED WORKS ON TURN KEY BASIS
AS PER NIT
CONSTRUCTION OF PIPE LINE ON BARSHI LBC FROM RD 1210 M TO RD 2425 M M.S. PIPE PUSHING FOR ROAD CROSSINGS OF LGM ACROSS KURDUWADI TO LATUR ROAD NATIONAL HIGHWAY M.S.
Improvement for strengthening of existing pavement from Km 32.000 to 33.900 Km Mairang Town portion and from Km 73.500 to Km Km 81.380 Sohpian Nongstoin portion of NH 44E in the state of Meghalaya
Widening to two lane with geometric improvement from Km. 208.00 to 214.00 Km with paved shoulder on NH-40E in the state of Meghalaya on EPC mode. (Job No.- 40E/2019-20/MG/153)
CRAETION AND MAINTENANCE (FOR 5 YEARS) OF AVENUE AND MEDIAN PLANTATION AT NH-31 FROM SONAPUR (MAHANANDA BRIDGE) TO GHOSH PUKUR OVER 18 KM AND FROM SALSALABARI TO ASSAM BENGAL BORDER OVER 27 KM
Re-Construction of RCC T- Beam girder 1x24.75m span Br.No.51/5 including subway and approaches on both side on NH-51 in the State of Meghalaya Job No. 217/MG/2020-21/159
Maintenance on Shimla Bye pass road km 13.00 to 24.250 and NH 05 Kalka Shimla Wangtoo road km 153.180 to 236.00.SH Providing and laying edge line center line at vrious Rds on NH05
Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Annual Plan2022-23in the State of Uttarakhand
Maintenance of road from Ch.15.00 to 61.500 of NH 334A in total length of 46.500 Km under Performance based Maintenance Contract (PBMC) for the financial year 2024-25 in the State of Uttarakhand
Custom Bid for Services - CONSUTLANCY SERVICES FOR ARCHITECTURAL AND STRUCTURAL DRAWING Similar Category Project Management Consultancy (PMC) Service for NHAI
Provision of GI barber wire fencing with RCC vertical post on AAI land beside NHAI at Raja Bhoj Airport, Bhopal
NP 4 pipe laying work P.D. From Meena house in front of Tiwadi Hospital till NHAI Ward No. 44, Dausa.
Construction of RCC Box Cell Drain along NH_16 from Sahabaj to NHAI Culvert near KIA Motors in Ward No-4
LAYING 465 M 11 KV UG CABLE FROM PDDP RMU TO SECTION OFFICE ALONG NHAI SERVICE ROAD UNDER ES VYTTILA
Development of green belt and landscaping with beautification work under elevated road, Nathdwara as per MOU with NHAI phase III.
Construction of line for releasing connection of load 63 KVA for Toll Plaza NHAI at Chapar under EUDD-II, Muzaffarnagar
Development of green belt and landscaping with beautifucation work under elevated road , Nathdwara as per MOU with NHAI (Phase-1)
Procurment of Supply of Plants, transportation with loading and loading on (14 guage) on NHAI-458 Lambiya to Raipur Section
Development of Green Belt and Landscaping with Beautification Work Under Elevated Road Nathdwara as per MOU with NHAI Phase-II.
Construction of line for releasing connection of load 63 KVA for Toll Plaza NHAI at Chapar under EUDD-II, Muzaffarnagar
Annual Maintenance Contract for Fire Fighting Fire Alarm and P.A. System at NHAI Residential Complex Sector 17 Dwarka New Delhi
Hiring of Commercial Vehicles on monthly hire basis for the Field Officers at NHAI, PIU-Badaun on e-tendering mode.
Providing Running and Maintenance of Vehicle Innova Scorpio Bolero or Equivalent Commercial on monthly hire basis for NHAI PIU Moradabad
Geotechnical investigation services for the Construction of Permanent Office Building of NHAI, PIU - Jalpaiguri, (W.B.) SH: Sub Soil investigation work.
Facility Services in NHAI Regional Office Jabalpur and its Project Implementation Units Jabalpur Sagar Gwalior Chhatarpur Chhindwara Katni Providing Manpower