Loading…
Loading…
6,380 results • Best match
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN OLD KM STONE NO 151 AND 161 ON NH 09 ON LHS FROM MORADABAD TOWARDS RAMPUR DISTT MORADABAD UNDER MORADABAD DO UNDER UPSO II
Development of New A Site RO at location Within 13 KMs from Deeh Chauraha on NH-31, RHS while going from Unnao to Raebareli, District- Unnao under Kanpur Divisional Office of UPSO-I
nagar panchayat renukoot ke vistarit kshetra me Radha krishna Mandir ke pas se ambika moters ke pas puliya tak NH mukhy marg ke dono patri par cut stone bichane ka karya (L-3)
RFP for the work of Construction of 4 lane flyover at Engineering College Chauraha at Km. 1.350 on NH-24A on Engineering Procurement and Construction (EPC) basis in the State of Uttar Pradesh.
Independent Engineer services for Construction of 4-lane green field highway from Km. 35.000 to Km. 49.155 of NH-731A with paved shoulders on Hybrid Annuity Mode in the state of Uttar Pradesh
Work of Strengthening NH-730 S to Nichlaul Chiutaha Puraina road (MDR-157E) (Tahsil Road) under Rajy Sadak Nidhi Yojana, Year 2024-25 in District Mahrajganj (5 Year Maintenance) Lot No 1/2
C/o and 5 year Maintenance of NH-24 From Km-433 to Kalyanpur link road from Km-7 to left side phoolpur link Road Km-4 to right side raipur link Road
Gernal Repair of CC road Masodha Block mauza sariyawan (pure Ram sahay ka purwa) marg se hote huye Sitarampur pattharkut mohale tak link Road. Gernal Repair of NH-96 se Bhatpura link Road
Name of Work No 27, WARD -25, IND.AREA ME NH-09 KI SERVICE ROAD SE CHOCHLAYE TAK AVEM OIL PUMP KE BRABER WALI ROAD TAK CHHTIGRAST SADAK KA DENCE DWARA SUDHAR KA KRYE
Construction work of CC road and drain from NH 028 service road in Ward No 17 Purana Dak Khana to Civil Court via the houses of Anoop Pandey Akhand Singh and Sushil Singh
Year 2024-25 Road Safety Long term improvement of T-Section Intersection and S curve on NH-509 to Narora jamuna Singh road to SH-18 Junavai via Esampur Asadpur Dabthara road ODR
Work 01 Regarding the planting of saplings on the central verge and horticultural maintenance work for a period of one year along NH 24 Kala Patthar Road Sector 02 to Green Valley Gurudwara.
Widening and Stenthening of NH-27 to Patepur Amraudha via Kusharjapur Mancha Road (S.H.-114) (ODR) in Ch. 4.460 to 6.960 in Kanpur Dehat under Vidhan Sabha Bhognipur (Including 5 year maintenance cost)
Repairing of Dividers, Painting and Remaining Interlocking work on Mahatma Gandhi Road-2 (Collectrate T Poing to NH-2 via Pachkuiyan, Bodla and Sunari City Road) from Pachkuiyan to Bhagat Halwai T Point.
Road Signage work on Mahatma Gandhi Marg-2 (From Collectorate Tirahe to Pachkuiya Bodla, Sunari to NH-2) Km-2(800), 3, 4(200), 5(100), 6, 7, 8, 9, 10, 11(200).
Construction work of four lane road from NH-27 to Government Girls Polytechnic to Ayodhya Ring Road in Ayodhya district (Chainage 0.000 to 4.000) First phase-Chainage 0.000 to 0.700 (Length 0.700 Km)
1297-2 The work of new construction of missing link up to Manoharpur from Km of- NH-24 in front of Majhaula police station under agricultural marketing facilities in the sugar mill zone
Nagar Panchayat Narora ke Ward no.14 Moh. Gopalpuri mein NH 509 se Damping Graund marg ke danyee taraf sahayak galiyo me mittee bharaav ke sath intaraloking tails aur nali nirman ka karye.
Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis
Widening and Strengthening work from Ch 0.000 to 17.300 , 46.900 to 48.600 and 49.900 to 68.000 of NH-727-G (Harraiya - Babhnan- Mankapur- Darjikuan marg ) under EPC mode in state of Uttar Pradesh)
Renewal of with 25mm thick B.C. to Lucknow-Ayodhya road (NH-28) to Ramsanehighat City Portion in km-64(550), 64(300), 65, 66, 67(200), 67(800) and 68 With H.M.P. (Deptt)
Construction of CC Road and U type drain from Ch-6.200 km to Ch-7.435km (Ramkot village aabadi) Of NH-330D Under road safety in the state of Uttar pradesh on EPC Mode.
Ward number 06 khorabar bind Tola se Rama Nishad Tak RCC Nali aur CC Sadak tatha Raman Nishad se Ramkaran Vishwakarma ke Makan Hote Hue NH 28 Tak RCC Nala ka Nirman Karya
Zone-1, Chhata, Ward No. 53, Trans Yamuna Phase-2, D-Block Construction of a drain and interlocking tile road from Seema house in front of the temple to the NH service road.
Supply of grit (13.2/11.2/6.7mm/stone dust) at HMP Panwaria for renewal of Shahabad Bhuresi Karethi Road, Eidgah Gate To NH-87 Road and Bilaspur Gate To Shutarkhana Road in District Rampur.
Rectification of Black spot at Ch 457.257 with ID KA 02 1 near Agra Tatguni cross of NH 209 including EOP construction at Km.457.300 to fulfill the Mitigation measures of forest department
SPECIAL REPAIRS TO SHED NH-339 (BTY SHED) OF SALVAGE DEPOT OF COD AGRA UNDER AGE B/R-I PROVN OF 02 X AC WINDOW TYPE (1.5 LTR CAPACITY) OF GE (W) AGRA.
RFP for the work of Construction of a Minor Bridge over River Bisuhi at ch. 206.730 Ayodhya Gonda- Balrampur Marg (NH-330), District Gonda under EPC Mode in the state of Uttar Pradesh.
One Time Improvement of Existing Najibabad Town section of Old NH 74 from existing chainage Km. 42.696 to existing chainage Km. 54.151 in the state of Uttar Pradesh on item rate percentage basis
Operation and Maintenance of Highway Nest Mini Facilities/ amenities at Kheri Km 69.000 (NB) and Balli Nallah at Km 70.900 (SB) on NH-44 in the UT of Jammu and Kashmir (2nd Call)
Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G Nuhkhas to Etah section to two lane with paved shoulder configuration under EPC Mode in the State of Uttar Pradesh.
Ward No. 07 Bhadsa Manopur, construction of a drain on the east side of NH 29 from the old boundary of the municipal council, passing by Tripathi Petrol Pump up to Surendra Automobiles.
HRC Fuse DIN Type ,16 Amp,500 Volts AC,Breaking capacity 120 KA, Size NH 000 Suitable for NON AC LHB Coaches as per BOM accepted Make-Siemens/ABB/Ferraz/wohiar/Italweber/SIBA.
Shifting of existing electric lines/poles falling in the alignment of construction of balance left out work on Hapur bypass to moradabad section from 86-87 Km. (LHS) in NH-24 in Garhmukteshwar
Survey Work Due to Height Raising/ Diversion of 132 KV Agra South-Mathura Line for Mathura - Bareilly NHAI Road and Agra Bypass Road Under ETD Mathura
Handling, Transport and Other Mining Services - Percentage quote based - Rate contract for Transportation of Pond ash from MUNPL to NHAI UPSBCL and other Govt Road projects
Development, Operation and Maintenance of Wayside amenities 3 O -M sites in Uttar Pradesh and 1 O-M site in Odisha (4 O-M Sites)NH-27/Kushinagar-Gopalganj/ 355-202/RHS/ Harihar Pur/Uttar Pradesh
S/R of Barawa Deorhi Marg to Ayodhya Parasad Verma ki Dukan ke samne se Shiv Balak Verma ke ghar hote huye Karedewan Lahrapur Deorhi Link Road NH-28 to Delwabhari Link Road
On Occasion of organizing of G-20 Summit and Global Investers Summit in Lucknow City, repair and painting work of Divider at Delhi-Bareli-Lucknow Road (NH-24) in Km 488(470) to 493.
Construction Work Of PBB NH-730 In Km. 201 Right To Nainiha Salarpur Link Road In Km. 1 To Right Baruhi Link Road In District Bahraich (Vidhan Sabha-Balha) Using Dept. Hot Mix Plant
1. Signage Work of Bypass in Bachhrawan Town between NH 24B and Bahraich Banda road SH 13 ODR AND Signage Work of Connecting of Lucknow Varansi road Avam Raebareli Sultanpur road in Km 1
Repair and rehabilitation work of damage Major Bridge over river Karmnasha from Km 38.600 to Km 38.798 on NH-124C in the State of Uttar Pradesh under Road Safety Works 2022-23.(2nd call)
PROJECT ESTIMATE FOR PROTECTION OF BALLIA-BAIRIA BUND (NH 31) BY CONSTRUCTING SPUR AT KM. 27.500, AND LAYING PORCOPINE KM. 28.200 TO 28.700 ON LEFT BANK OF RIVER GANGA IN DISTRICT- BALLIA Lot-02
Repair work of culvert on Lakda drain near Gram Sabha in Barrebojh at km 4 of the road from Isari Chatti to Sultanpur via Jam on Bansdih Ballia Ghosi NH 107 in Ballia district
Consultancy services for preparation of Detailed Project Report (DPR)based feasibility report for construction of Flyover at Km 99.400 of NH 730 (Major Junction with state highway-93)in the State of Uttar Pradesh.
General Repair of NH-29 Baundra Mathiya Ramdauli Nibarhar via Patnaghat Ghagsara road Km-1 2 3 4 5 6 7 8 9 10 11 12 by Hot Mix Plant (Lot No 1/9)
Table top and road safety work for black spot improvement on Pali Pahari Medical By Pass Road Old NH-25 Urban Road Km 0 8 Chainage 7-600 Interstate Bus Stand of Jhansi district
Construction and Maintenance Works of District Agra, Under Package No UP 5086-A, Name of Bridge Construction of RCC Box Culvert 3X5.0mX5.0m at ch. 7340m, Name of Road NH-2 To Ol Via Chadgaon
Development of New A Site RO at Location Between KM Stone No. 1420 and 1426 on NH-27, LHS while going from Jhansi to Kanpur, Dist. Jhansi under Kanpur Divisional Office of UPSO-I.
Construction and Maintenance Works of District Agra, Under Package No UP 5086C, Name of Bridge Construction of 6X5.0mX5.0m RCC Box Culvert at chainage 11596.m, Name of Road NH-2 To Ol Via Chadgaon