Loading…
Loading…
6,380 results • Best match
Construction work of bituminous road in Ch. 0.000 to 4.750 and white topping CC road in CH. 4.750 to 9.000 (inhabited part) of Orai urban part (Orai) of NH-25 in Orai district (Length 9.00 Km.)
Widening of Culvert no. 33/5 in km 33.00, Construction of KC drain on both side of the Culvert and Construction of Retaining wall between culvert no. 33/4 and 33/5 on NH-72A (307).
Development of New A-Site RO at Location BETWEEN KM STONE NO. 284 AND 289 ON NH 30 ON LHS, TOWARDS Village Bilpur Fatehganj East, Tehsil Faridpur, District Bareilly under Bareilly DO, UPSO-II. STATE OFFICE.
Development of New A site RO with all facilities at location Between KM Stone 16 to 32 on NH-39, RHS while going from Jhansi to Chattarpur, District-Jhansi under Kanpur Divisional Office of UPSO-I.
Balance/Left Over work of Construction of ROB No.123 at CH.108640.0 m Over NH- 28 between Sahajanwa-Piprauli in Connection with Sahjanwa-Dhorighat New Railway line Project in Lucknow Division of N. E. Railway.
232-1 In the financial year 2025-26 under special repairs in Moradabad district repair and improvement work of Shaungala Kakarghata link road from Km-167 of NH-24 damaged due to flood and heavy rains
Periodic Renewal and 05 Year Routine Maintenance for Group No UP2801R 1 UP2884 MRL05 Manoli to Puthari MRL02 via Rawali Kalan Bhanera and 2 UP2878 T05 Modinagar Kalchina Road to NH 24 via Abalpur Rajwaha Patri
Supply of stone grit/ballast (13.2/11.2/6.7mm/Stone Dust) at Hot Mix Plant Panwaria and Labour Work for laying of mix from HMP for Renewal of NH-24 Dhaneli Poorvi to Patia Road via Bhopatpur.
Widening and strengthening work from left exit of BMCT road Km-169 -Km-599 of NH-730- to Zero Saraiyan Khurd Bihar Border- ODR- Total length 13-400 km- in Kushinagar district in FY 2023-24
Construction of Maharajganj Nichlaul Thuthibari road to NH-730-S to Prathamik Swashthay Kendra Gadaura link road under Rajya Sadak Nidhi Yojana Year 2025-26 in District Mahrajganj 5 Year Maintenance Lot No 07 of 14
Construction Work Of NH-730 Km. 211 To Right Gaighat Vaivahi Matiha Badhain Kalan Rampur Dhobiya Arnawa In Km. 13 To Bakhtawar Gaon Link Road In District Bahraich (Vidhan Sabha- Balha) Using Dept. Hot Mix Plant
Operation Maintenance of Naini Cable Stayed Bridge across Yamuna River with approaches Km minus 1.117 to Km 4.293 at Allahabad Naini in UP on NH 27 New NH30 in the State of Uttar Pradesh 2nd Call
Selection of Contractor to undertake entire NH-28 Median Horticulture Beautification Work including its Management and Maintenance, starting from Ayodhya Entry Point i.e., Sahadatganj to Exit Point at Lata Chowk, near River Saryu, having total 24Kms
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of Kalwari Bypass- 2 lane with Paved Shoulder for Kalwari town on NH-227A (Ram Janki Marg) KM-36 in the State of Uttar Pradesh.
Consultancy services for Authoritys Engineer for Supervision of Work of Widening to two Lane with paved shoulder from Design Km 0.000 to Km 49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.
Renewal of NH-927 Km.-50 to Dhansari Km.-1 Via Budhanpur, Kodari Newajis Ali, Harchanda Uttari and Harchanda Link Road Km.-1 to 5, 6(80) in Financial Year 2025-26. (With Hot Mix Plant)
Performance Based Maintenance Contract from Km.188.800 to Km 226.260 (except km 201.100 to km 201.600, km 214.439 to km 214.969 and km 215.00 to km 215.600) of NH-730 in the State of Uttar Pradesh.
Improvement and upgradation to two lane with paved shoulder configuration from existing km.55.00tokm.90.000(Design length 34.760)of NH-227A(Near Chhapia Village to near Sikriganj)in the state of UP on (EPC)mode Contract.
Operation and Maintenance of 4 Lane Varanasi Ring Road Phase I total project length 16.55 Km and Operation and Maintenance of 4 Lane NH 31 from Babatpur to Harhua Section in the state of Uttar Pradesh.
WARD NO 1 GALIBPUR KE DALIT BASTI ME SWA DHARMU KE MAKAN SE JANARDAN KE MAKAN HOTE HUWE NH-29 TAK TATHA SUBRAAB BHARTI KE MAKAN TAK INTERLOCKING ROAD WA NALI MARAMMAT TATHA PATIYA KA KARYA.
Consultancy services for Authoritys Engineer for Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh.
Providing Conical Arch Street Light Pole on 80 Mtr. wide road between Sector-03 and Sector K.P. -5 and 60 Mtr. Wide road from Chaar Murti Rotary to Tigri Rotary NH-24 Link Road, Gr Noida.
Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH-2 from Km. 215.000 to Km. 230.000 and from Km 280.000 to 295.000 as per Crash Vulnerability Audit Report on EPC Mode
Routine Maintenance along with Providing Highway lights, fixing additional Road Safety items and Incident Management of NH-709A from Km 00.000 to 14.450 (Karnal- Meerut Section from Devilal Chowk to UP Border) in the Haryana State
Special Repair of NH-927 Km 48 to Kaiserganj Malaunaghat Via Dhansari Karnaideeha Khanehra and Kurmaura Road ODR Km 1 200 and 2 200 in Financial Year 2025-26. Vidhan Sabha Kaiserganj With Hot Mix Plant
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Widening to 2 lane Paved shoulder of Pratapgarh-Amethi -Gauriganj-Musafirkhana of NH-931 in the state of U.P.
Construction Work Of NH-730 Km. 211 To Right Gaighat Vaivahi Matiha Badhain Kalan Rampur Dhobiya Arnawa Road In Km. 7 Left Chiraiti Link Road In District Bahraich (Vidhan Sabha- Balha) Using Dept. Hot Mix Plant
Periodic renewal work from Km. 0.000 to 68.300 of NH-931 (Pratapgarh -Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 and 53)
High Voltage HRC Fuse Din type, 25A, 1000V AC, size: NH 00C, breaking capacity 25KA, confirming to IS: 13703/IEC 269-2. Material shall be supplied as per RCF Specification No- EDTS 355, Rev.1, Amendme
A M I No. 10.81 / 2023-24 BISOPROLOL 5 MG TAB Make/Brand:- Corbis 5 Mg. Tab. Mfg. By:- M/s TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH%u201010, East District, Gangtok, Sikkim%u2010 737135
A M I No. 12.232 / 2024-25 Linagliptin 2.5mg and Metformin 500 mg tablet. Make/Brand :- Linaxa M 2.5/500 Mfg. By:- M/s TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH%u201010, East District, Gangt
Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
E-TendeFor the Work of Utility Shifting Work from Football Chowk to Railway Chopla and Football Chowk to Bhagpat Fly Over NH-58 Meerut in the area of EUDD-11 KV Line-South, Meerut.r No.-50/EUDC/MEERUT/2025-2026
Carrying out work of Survey and Marking Profile of rout for 400KV Unnao Agra Line for Hight raising work for NHAI at Loc 118 119 under ETD I KANPUR
A-Reeth to Mangupura B-T-03 to Jasrathpur C-NH-93 to Meerpur Mafi D-NH-93 to Mudiya Bhikan
Under National Clean Air Programme (NCAP) Construction work of Side Partri on Both Sides from Rampur Road NH-24 Prabhat Market Intersction (Chauraaha) To Lohia Hospital with comprehensive operation and maintenance of 5 years.
Under National Clean Air Programme (NCAP) Road Improvement work using Hotmix and RCC Drain Construction From Gulabwadi Chungi to Hanuman Temple on NH-24 (Rampur Road) with comprehensive operation and maintenance of 5 years.
Renewal work with General Repair on NH-3 to Jarua Katra Hote Hue CATK Road tak in Km-1(522), 2(484), 3(535), 4, 5(924), 6(316), 7(777), 8(845), 9(736), 10(150)
Renewal with General Repair of Paliya Lucknow (NH-731) Km-138 to Todarpur Block Office, Umrauli Tarawaon Kaimi and Antaura village Shahabad Pihani road (ODR) to Dighiya to Parsai road in Km-12(800) to 16(400)
3054 Rajya Sadak Nidhi Renewal work of NH-35 to Sangampur via Bharatkoop Mandir road (ODR) in Km-1(200), 2, 3, 4, 5, 6, 7, 8. 9, and 10(100) in B.C. work at dist Chitrakoot
PROTECTION OF BALLIA-BAIRIA BUND (NH 31) BY CONSTRUCTING SPUR AT KM. 27.200, AND REVETMENT KM, 27.400 To 27.490 AND REPAIARING SPUR AT KM. 26.700 ON LEFT BANK OF RIVER GANGA IN DISTRICT- BALLIA (U.P.) Lot-04
RFP for the work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH-730S (Maharajganj , Nichloul , Thuthibari) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Construction of a new 2 lane parallel bridge,Approach road, and Protection Works near the damaged long bridge at kilometer 38 over the Sot River on Shahabad- Bisauli-kachhla Ganga Ghat (NH-109) route in District Badaun.
Widening And Strengthening of Ajbapur to Jahanikhera H.P.C. road via NH-24 Ch. from 0.000 to 0.530 and Ch. 2.330 to 5.430 (Length 3.630 Km) under Rajya yojana (samanya) scheme in FY-2021-22 in Distt Hardoi
Road Safety work for Rectification of 2 nos. of Black Spots from Km. 305.900 to Km. 306.400 (Katra Bypass) and from Km. 319.750 to Km. 320.150 (SSB Camp) of NH-730 in the state of Uttar Pradesh.
Construction of the remaining length of the connecting road in the Goramachia area, starting from Satyam Motors on the left side of NH-27, passing through Satya Shanti Mineral Stone Crusher, and ending at Bihari Stone Crusher.
Development of New A site RO with facilities like Sales Building, Canopy, Paver block driveway and other allied works at location between KM Stone 98 to 101 on NH-128, District-Amethi, under PDO of UPSO-I
Construction of New A Site RO at Location Within 4 kms from Veegha Khet toll Plaza towards Jhansi on RHS while moving from Lalitpur to Jhansi on NH 44 District Lalitpur under Kanpur Divisional Office of UPSO1
Renewal with General Repair of Satellite Overhead Bridge Road and Service Lane (ODR) located at km 16 of Parsakheda to Rajau Paraspur via Chaupla, Satellite Tiraha (old NH-24 city portion) in District Bareilly FY 25-26
Renewal work of NH 29 to Bhiti Jamin per Puliya ke pass Pokhar ke Purab and Dakhin hote hue Mannilal ke Aata Chakki Link Road in Distt Gorakhpur in FY 2025 26 Lot No 33 of 50