Loading…
Loading…
6,342 results • Best match
General Repair work of NH-58 to NH-24 Kalchhina to Bhojpur Pilkhuwa via Amrala road under Renewal
PR work from Km.61.000 to 66.000 on NH 91A (New NH No 234) Etawah-Bela-Kannauj Road
Renewal of Meerut Mawana Pauri Road NH 119 up to new NH 38 in Km 5 and 6
Road Safety work at Chadrai Chauraha Junction in Old NH-24B/New NH-30 Km-108.100 to 108.900
Work of re-electrification of Type-5 houses from NH-1 to NH-6 at Krishna Puri, Mathura.
Reconstruction of Box Culvert No. 125/1 on NH-35 (Old NH-76) under Special repair under MandR
NH 19 se Bhim Patti se Bhadasar hote hua NH 19 tak marg ke vishes marmmat ka karya
Renewal Of NH 28A Km-31 (Sukhariganj) Udaypur Chaurahar Bewana Tarakhurd Hote Hue LD Road NH-5 ODR
Renewal work with General Repair of NH-2 to NH-3 via Dakshini Byepass Road in Distt Agra
RENEWAL WORK WITH BC IN FIROZABAD CITY NH 2 TO MAKHANPUR TO RAJA KA TAL OLD NH 2
Work of re-electrification of Type-4 houses from NH-1 to NH-7 in Krishna Puri, Mathura.
Construction of Foot Over Bridge at Eleven locations at Six laning of Varanasi -Aurangabad Section of NH -2 from Km. 786.000 to km. 978.400 in the state of UP and Bihar on EPC Mode.
CC road and culvert construction work from NH-2 service road to village Jagmudi the house of Kshetrapal.
Block Chirgaon mai NH 27 mai Thakur Baba mandir hote huye Chirgaon Bypass tak sadak nav nirman karya
NH-28B to Parsauni link road
NH-28 to Piprahi Link Road
NH-28 to Pagra link road
Engagement of user fee agency through E-Tender at Sarai Sundarpur FP in Pillibhit District at Design km 9.840 for the use of two lane with Paved shoulders of Pillibhit Puranpur Section of NH 730 from design Km 0.000 to Km.38.000 in Uttar Pradesh
AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) PKG II (FROM SHAHAPUR (KM 42.500) TO PINDARI (KM 78.150)) AND (II) PKG III FROM PINDARI (KM 78.150) TO RAWALGANJ BYPASS (KM 117.120) IN UP ON EPC
Engagement of user fee collection agency on the basis of CB through e-tender for Andhiyari FP at km 85.195 for the use of 2 lane with paved shoulder of Raebareilly-Allahabad Section from km 108.800 to km 188.600 of NH-24B in Uttar Pradesh
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
Engagement of user fee collection agency on the basis of CB through e-tender for Chapwa Distt. Maharajganj FP at km 11.070 for the section from km. 0.000 to km. 40.706 of 2 laning of Sonauli to Gorakhpur Section of NH-24 in Uttar Pradesh
Engagement of user fee collection agency on the basis of CB through Hitouta FP in Shahjahanpur at Design km 69.700 for the use of two lane with Paved shoulders of Puranpur-Khutar Section of NH-730 from design Km 38.000 to Km.82.000 in UP
IE services during O and M for 4 laning of Meerut-Nazibabad section from Km. 11.500 (11.500 Meerut) to Km. 39.250 (39.240 Behsuma) and from Km. 86.590(79.500 Bijnor) to Km. 112.545 (105.700 Jalalabad) of NH-119 (New NH34) in Uttar Pradesh under HAM.
Consultancy Services for AE for Construction of new 6-Lane Access Control Prayagraj Southern GF Bypass from design Km 34.400 (near Dandupur) to design Km. 43.200 (near Mahuwari) Total length 8.800 Km PKG-1 under Phase-I in UP under NH(O) on EPC mode
Engagement of user fee agency through E-Tender at Chapwa Distt. Maharajganj Fee Plaza at km 11.070 for the section from km.0.000 to km.40.706 (40.706 km.length) of 2 laning of Sonauli to Gorakhpur Section of NH-24 in the State of Uttar Pradesh
Drain construction work in Pilkhani population part on NH-73 (New NH-344) (Ambala Road) in district Saharanpur.
Road safety works on various section of NH31 NH 28 NH 35 and Varanasi ring road in the state of Uttar Pradesh
Repair work of Upper Ganganahar bridge in NH-91 (Old NH) Aabadi Portion Km 5(910) in Distt. Bulandshahr.
C/O NH 56 purani bazar se ahirauli and harijan basti hote huye naye NH 731 tak link road
Road Safety work at the Junction in town Unchahar Old NH-24B/New NH-30 Km-118 to 119
Road Safety work at the Junction in town Jagatpur Old NH-24B/New NH-30 Km-95 to 95.5
Renewal of NH-28A Km-31 Sukhariganj Udaypur Chauraha Bewan Tarakhurd Hote hue LD Road NH-5 by HMP
Road Safety work at the Junction in Kabir Chauraha Old NH-24B/New NH-30 Km-115.100 to 115.400
Short Term Operation and Maintenance of Gorakhpur bypass NH 29E to NH 28 in the state of Uttar Pradesh
Work of installing crash barriers and delineators on the canal patri of NH-24 to NH-87 bypass road.
Reconstruction of Minor Bridge at Km. 244.20 on NH-76 New NH-35 in the State of Uttar Pradesh.
Providing and Fixing of RCC fencing poles and Providing, stretching and fixing of Barbed Wire Fencing on RHS/LHS of NH-87 in Rudrapur to Kathgodam
Providing and Fixing of RCC fencing poles and Providing, stretching and fixing of Barbed Wire Fencing on RHS/LHS of NH-58 in Haridwar to Muzaffarnagar
Engagement of user fee agency on the basis of CB through e-tender at Nagla Plaza at Km 61.500 at 4Laning of Rampur Kathgodam section of NH-87 from km 43.446 to km 93.226 (Package-II) in the State of Uttarakhand under NHDP Phase-III on HAM
CS FOR AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500) (PKG-I) AND (II) BUXAR SPUR OF LENGTH 17.270 KM (PKG-IV) IN THE STATE OF UP ON EPC MODE
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Tarwa Deva Fee Plaza located at Design Km 299.507 for the use of four and more lane of Aligarh-Kanpur section of NH-91 in the State of Uttar Pradesh
Engagement of user fee agency through e-quotation for Jiwana Fee Plaza at Design Km 34.500 of NH-709B for the use of four and more lane section from EPE crossing to the start of Shamli bypass from design kilometer 0.000 to kilometer 61.409 in UP
Chain Link Fencing work at Jhansi Khajuraho section Package I from km 0.00 to km 76.3 of NH 39 in the State of UP MP under NHDP Phase III on Hybrid Annuity Mode Project Pkg I
Periodical Repairs of Jalna, Sindhekhedraja, Sultanpur, Mehkar, Malegaon, Karanja, Pimpalgaon, Talegaon, Pulgaon Road Section of NH-753C from Design Ch.0.000 to Ch.285.450 (Jalna to Pulgaon) in the State of Maharashtra on Item Rate basis
Supervision Consultancy Services for Periodical Repairs of Jalna, Sindhekhedraja, Sultanpur, Mehkar, Malegaon, Karanja, Pimpalgaon, Talegaon, Pulgaon Road Section of NH-753C from Design Ch.0.000 to Ch.285.450 (Jalna to Pulgaon) in the State of Mahara
Design and Construction of Light Vehicular Underpass at Km. 80.800 Design Ch. 81.026 Karara Ganj Junction on Jhansi to Khajuraho section of NH 39 in the State of Madhya Pradesh on Engineering Procurement and Construction Mode
Prayagraj Manigarha NH to Piprav sampark marg
NH-93 Kaser Kalan Abadi Bhag Road
SR of NH-24 to Bijaura road