Loading…
Loading…
6,379 results • Best match
Strengthening Cum Repair And Maint of street light of NH 28 From Sahjanwa to Nausar Gida Gorakhpur
NH 19 Dada Ke Chhapra Sampark Marg Ke Abadi Bhag Me CC Sahit Vishesh Marammat Ka Karya
Road sides plantation work from Km 4.000 to 14.000 of NH 730A in the State of UP
Construction of Railway Station to NH -727 H Via (Maal Godam Road) in Block Banki District Barabanki
Renewal work with General Repair of NH-29 to Jungle Dirghan Singh link road Length 0.30 km.
Mastic Flooring Work ( P/L Mastic Flooring Goll Chakar at Road No-6 Near NH-24) Noida
PR Work in KM 1 to KM 11 on NH 730B in the state of Uttar Pradesh
54 - Nagar Palika simantargat NH 9 ke nikat vyavasayik bhawan me marammat avm sondaryakaran karya. Bhaag-2
Construction work of the welcome gate at the exit of the main road old NH Chirgaon Jhansi
Special Repairing with Construction of Hume Pipe Culvert in Km 02 of NH 24 to Bagarpur Road
PR Work in km 13 14 and 15 on NH 730B in the state of Uttar Pradesh
New construction work of the remaining part of Rasulpur road from NH-11 of Achhnera via Sakatpur
Preodic Renewal Work from Km. 66.000 to 70.000 of NH-328 in the State of Uttar Pradesh.
Preodic Renewal Work from Km. 168.00 to 172.230 of NH-28B in the State of Uttar Pradesh.
Renewal work with Genral Repair of NH-3 (Km-10 Itora Mode) to Agra Deori Iradatnagar Road
Improvement work of T-Junction (Ch-80.270) on NH-34 and SH-134 in P.D., PWD Hamirpur
WARD NO 11 MEIN NH 97 SE BHIM YADAV KE MAKAN TAK PIPE LINE VISTAR KA KARYA
NH 19 Se Bhadsar Gram Sampark Marg Ke Abadi Bhag Me CC Sahit Vishesh Marammat Ka Karya
Gram Sabha kapuri mein mauja pahiya mein NH 31 se railway line ki or CC ka karya
Patch Repair work of Block Milkipur in Ayodhya Raibarelie (NH-330A) on Left Side in Village Road
Patch Repair and Maintenance of NH-330A Raebareli Ayodhya from Jagdishpur km 47.930 to Ayodhya km 109.46
Special Repair of NH-2/25 to Korwakhurd Road in Km. 2(100), 3 and 4(500)
Construction work of approach road and drain from NH-27 located in Ayodhya to village Firozpur Upharah
Annual repair and renovation work at Km-1(300) of Kitabundih link road from FNBS (NH-730).
WARD NO 12 ME NH 29 SE PANKAJ TALKIES TAK HUME PIPE DWARA NALI KA NIRMAN KARYA
Signage work on Bhagwan Talkies to Poiya Ghat road and Jugsana Baldev Barauli Kailash NH-2 road.
Gram baheri me chaourasiya janral stor nh 31 se ziyaul ke ghar ki our c.c. ka karya.
Under District Deoria, Pitch work of road leading to Hatimpur crematorium near NH-28., Lot No 1
NEW CONSTRUCTION WORK IN DISTRICT SANT KABIR NAGAR FORM NH-328A BAKHA TO RELIANCE INDUSTRIAL AREA ROAD
Renewal work of Meerut Podi road (NH-34) to Deval Mehmoodnagar Huainpur road in km-5,6,7,8,9(250)
Ward No 9 Tilak Nagr me NH se Prem ke dukan tak RCC Nali ka Nirman Karya
GRAM RAMPUR PATARI ME NH MARG SE RATANPURA BHADWA RAJBHAR BASTI TAK MARG KA NAVNIRMAN LEPAN KARY
Construction of interlocking from NH-28 to Nand Lal Rajbhar house in Ward No. 07, Siddharth Nagar.
Road sides Plantation work from Km 0.000 to 15.089 of NH-334A in the state of UP
Patch repair work on NH 9 road from Gaur Green Avenue to Kanavani culvert in Indirapuram area.
Renewal work on the access road of the old NH 73 Government Girls Polytechnic
Survey and valuation work in respect of Rehabilitation and Upgradation to 2-Lane with Paved Shoulders configuration of Bewar-Allahganj section (52.770 km) of NH-730C and Bewar-Etawah section (57.346 km) of NH-92 in the State of UP.
Interlocking tile work on both sides of carriageway for road safety (Black spot ID No. UP-(04)-49) from Ch. 66.000 to Ch. 69.000 (Urban stretch of Attara) of NH-35 (Old NH-76) in the state of Uttar Pradesh.
Maintenance of NH 727H Barabanki-Dewa-Fatehpur (Ch. 10.00 to 29.990) under the Short Term Maintenance Contract on percentage rate basis for the year 2024-25 under the jurisdiction of NH Circle PWD Lucknow in the State of Uttar Pradesh.
Development of New A RO at Location Between KM Stone No. 147 and 150 on Jhansi to Kanpur Road NH-27 (old NH-25), on LHS While going to Kanpur from Jhansi, District- Jhansi under Kanpur Divisional Office of UPSO-I.
Short Term Maintenance Cost Estimate from Km 239.260 to 252.600,254.800 to 258.100,258.800 to 265.300,266.200 to 268.910 of NH - 76E/35 in the state of Uttar Pradesh. under the jurisdiction of NH Circle PWD Prayagraj in the State of Uttar Pradesh
Limited RFP for providing Manpower Services to Invit-Concessionaire for collection of User Fee at Bhadarabad Fee Plaza of Muzaffarnagar to Haridwar section from Km.130.560 to Km.209.120 of Old NH 58 (New NH-334) in Uttar Pradesh and Uttarakhand
Special Repair work Ch. 88.000 to Ch. 95.000 of NH 330D in District Hardoi State of Uttar Pradesh.
Special repair work from KM 37 of NH 73 (Gagalheri police station) to Mohiuddinpur via Majri road
Under the Critical Gaps Scheme construction of a drain on the old NH-73 (new NH-344) from km 36 at Gagalheri to Saharanpur via Sarasawa road (Ambala Road) from Midda Hospital to the P and T Center
Road Safety Work at Garra Bridge to Puttulal Chauraha Old NH (City Portion) in Distt. Shahjahanpur. (Fin Year 2024-25)
Renewal Work with ordinary repair of NH-44 terai fatak to jignao road in km. 1(550), 2(580)
GRAM PATTI KALAN MAI MAIN ROAD PAR JITENDRA KE GHAR SE NH 74 TAK DAMAR ROAD NIRMAN
Special Repair Work of NH canal road to Parsona link road in Distt Bareilly for FY 2025-26
Under Special Repair Work in Etawah Agra Old NH 2 Sarai Eshar to Kachauraghat Baba Ka Nagla Road