Loading…
Loading…
4,251 results • Best match
Link road from NH 6 to Bhogpur Railway Station,from 0.00 km to 3.50 km, temporary patch repairing work by potholes repairing, 20 mm PC, SC and other allied works in stretches under Tamluk Highway Division in the district of Purba Medinipur during the
Repair and Post 5 Years Maintenance of PMGSY Road from T03 AT PURBA BATABARI TO T06 MURTI VILLAGE JOYONTEE VILLAGE (T07-NH 31 AT PURBA BATABARI TO PUCCA ROAD AT MURTI VILLAGE JAOYANTEE VILLAGE) Package No WB10ADB-17 Length 7.598 Km Block Mal under
One Time Improvement work Bypassed stretch from Km19.205 to 22.440 Km 23.550 to 29.702 Km30.600 to 36.200 and Realignment stretch from Km37.000 to 37.650 Km 38.400 to 38.750 Km43.780 to 45.730 and Km48.00 to 50.00 of NH 31 in WB.Job No.512/WB/23 24..
(i)IMPROVEMENT OF ROAD WITH REPARING FROM SURJA SK HOUSE TO BUDHU SK HOUSE (ii)ROAD REPAIRING WITH BRICKS ,DUST FROM IMMAMNAGAR PRY, SCHOOL TO NH-12 AT IMAMNAGAR VILLAGE (iii)REPAIRING OF ROAD FROM NIKHIL DAS HOUSE TO BALARAM DAS HOUSE AT JALBANDHA
Repairing Potholes with mending depression in stretches from 0.50 Km to 2.0 Km, 4.5 Km to 7.5 Km and 9.0 Km to 11.0 Km of NH 717 (A) at Pedong Bazar to Lingsay (Rhenock at Sikkim Border VIA Kagay) Road, Kalimpong under P.W.D. Kalimpong Division.
Repairing Potholes with mending depression in stretches from 13.0 Km to 15.50 Km, 18 Km to 21 Km, and 23.0 Km to 24.92 Km of NH 717 (A) at Pedong Bazar to Lingsay (Rhenock at Sikkim Border VIA Kagay) Road, Kalimpong under P.W.D. Kalimpong Division.
Preparation of Detailed Project Report DPR for Construction of Twin 3 Lane Gurjan Jhora Bridge at Malbazar with both side approaches in replacement of the old existing Bridge at ch Km 627.846 of NH31 New NH17 under the EE NH DIV IX PWRD SILIGURI
(i) Installation of Electric Street Lights From Motu sk house near NH-34 to Mojibur sk House No Lights-60 (ii) Installation of High Mast Lights at south side of Dighi at Bhurkunda (iii) Installation of High Mast Lights near Fulu sk House at
WBPWD/EEKIT/E-NIT-095/T/24-25
Urgent Improvement of Shoulder by ICBPP between km 31.685 - km 32.545 and km 37.385 - km 37.815 and construction of H.P culvert at km 32.450 and RCC drain from km 32.19 - km 32.45 of NH-117 in connection with ensuing Ganga Sagar Mela 2024 under NHD-I
Construction of Paver Block Road from the H/O Anis Miya (NH 31) house to Dashmi Indwar house of Subhasini TG godam line part no 11/123. under Malangi GP within Kalchini Block in the district of Alipurduar in the year of 2024-25 (length -1100 m).
Felling and disposing of 88 no trees of different species at proposed R.O.B. at Memari with its immediate approach at both end in Gate No-33 of Bardhaman Bandel Section on GT Road (Old-NH-2) SH-13 of Burdwan Highway Sub Division No-II under BSHD
Urgent restoration of damages on Black top surface due to cyclone Yaas btn. 15.200 Km to 22.300 km on the LHS Lane(Barasat Bound Lane) of N.H-34 with Bituminous Potholes, BM, MSS type-B of NH Div-V, P.W. (Rds) Dte during the year 2021-22
Left out HDPE pipe line and pushing of 600mm dia MS pre cast pipe and 100 mm dia GI water carrier pipe by hydraulic jacking method across Purulia Ranchi NH Road for laying distribution line in connection with Jal Jeevan Mission at for Zone-III of
Pushing of 600 mm dia RCC (NP-3) Hume pipe for laying 150 mm dia MS water carrier pipe by Hydraulic jacking method under Bankura-Purulia road at Birgiri More of NH 60A for Rejuvenation of Bongabari W/S Scheme under Purulia Sadar Sub-Division, PHE Dte
Concrete Road starting from Dr. Pranotosh Mondals house to Gulabs house and Maszid to Ismails house and Old NH-6 to Prakiti Maitis house via Sarkar para Dhal and Bera Bazar Durga puja mondap to Amal Beras house at an approx. length of 675 mtr. at Nar
Temporary restoration works of pot holes and laying Close Graded Premix Surfacing Mixed Seal Surfacing over repaired pot-hole areas on NH 60 from Ch. 400 800 Km to 401 000 Km in the district of Birbhum in the State of West Bengal Fin year 2020 21
Providing 04Four Nos Security Guards un-Armed for round the clock guarding arrangement for Office of the Exe Eng N H Division No-IV and Office of the A E Purulia NH Sub-Division PW Roads Dte and attached Stackyard for the period of one year
Construction of RCC covered drain from Km. 85.99 to Km. 87.08 both sides of NH512 under NH Div VII PW Roads Dte in the dist of Dakshin Dinajpur during the year 2021 22 on item rate mode using SBD Job No 512 WB 2021 22 481
NH-34 to Nimtita Station Road Extended to suti P.S Road from Ch. 0.0 Kmp to 2.10 Kmp, Ch. 2.60 Kmp to 4.00 Kmp, 5.00 Kmp to 5.60 Kmp in stretches Reparing of potholes and distress surface under Murshidabad Highway Division No.I. During the year 2024
Widening of Valley side at Km 20.900, Km 35.500 and Km 36.700 and culvert at 13 locations viz. Km 17.600, Km 17.800, Km 18.300, Km 20.200, Km 21.500, Km 21.650, Km 21.850, Km 32.800, Km 33.100, Km 38.300, Km 40.300, Km 43.700, Km 47.300 on NH-10EPC
AMC/CMC of Fire Extinguishers - Institutional; Dry Powder Fire Extinguisher
eNIT No 01/APAS/2025-26 Sl No 05
Urgent special work for up-gradation of shoulder by ICBPP Paved Shoulder of 1.50 m between Km 57.800 and Km 58.200 on Both Sides and between Km 94.335 and Km 94.715 on LHS of NH-117 in connection with Ganga Sagar Mela-2024, under N. H. Division-I
Pre-coating of stone chips with MC-800 and Anti-stripping Agent for emergent repairing of rain damages by patching potholes etc. of service road (both side) of NH-117 from 5.10 Km to 5.90 Km. in patches under Ulu NHSD, P.W.(R) Dte during fy 23-24.
Patch repairing work of NH 2 By-pass to Naity road via Gobra R.S. from 1.2 km to 2.0 km and 2.5 km to 4.0 km (in stretches) of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghly during the year 202
Supply of Materials for Construction of PCC Road From Shashi Mohan Paul to HO Santosh Deb, From the HO Manoj Sarkar to NH-31, From the House of Suresh Barman to Sushil Barman , From Nepal Das House to Lalu Modak House , From the HO Ramkat Sekh to HO
Pre monsoon Cleaning of brick wall RCC cover drain between km 31.670 and km 32.400 and dressing and chilchalling of road flanks between km 32.00 and km 34.00 of NH-117 under N.H. Division No.-I, in the district of South 24 Pgs during the year 23-24
Construction of Drain at Lane by the house of (1) NH to Abujar Hossain Choudhury (2) Badol to Prodip Bittar (3) Mofijul Sk to Furad Sk (4) Manarul to Jalai Sk (5) Kanchan to Bolai Das (6) Anima Chakraborty to Khusina Bibi (7) Sankar Misra to Hatim Sk
Urgent rain damaged repair providing Potholes repairing, 20 mm th. P.C and S.C (Type-B) on road surfaces of NH-117 between km 24.00 and km 25.00 and km 32.00 and 33.00 (In stretches) under NHD-I, in the Dist of 24 PGS (S), during FY 2024-25.
Project for suitable automation tools to monitor the flow of buses and pilgrims at designated locations within the Sagar island and at the Kachuberia Jetty as also to monitor the number of buses in the 3 buffer zones on NH-117 and at the Lot-8 Bus St
Shifting of Clear Water Raising Main of 600 mm dia DI K9 Pipe including newly laid 900 mm Dia MS pipe as casing and 600 mm Dia MS Carrier pipe with allied works in connection with proposed Four Laning of Berhampore Farakka Section of NH 34 at KM
Urgent restoration of damages on Black top surface due to cyclone Amphan btwn. 16.400 km to 23.175 km on the L.H.S Lane(Bst. Bound Lane) of N.H-34 with Bituminous Potholes, Bitun. Macadam, MSS type-B of NH D-V, P.W.(Rds) Dte during the year 20-21
Emergent restoration work of ditches of NH 2 By-pass to Naity road via Gobra R.S. from 1.20 km to 2.0 km and 2.60 km to 3.80 km of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghly during the year
i)CONSTRUCTION OF CC ROAD FROM THE HOUSE OF MOHENDRA ROY TO SUSIL CHANDRA SAHA HOUSE(ii)CONSTRUCTION OF CC ROAD FROM THE HOUSE OF PORIKHIT PAL TO NH 512 (iii)CONSTRUCTION OF CC ROAD FROM THE HOUSE OF NARESH ROY TO THE HOUSE OF NABIN DEBNATH (iv0CONST
Repairing, Cleaning of High drain along with Construction of RCC Slab on NH-34 at different places from 1) Collage more to Rail gate at ward nos- 2 4 5 8 2). Rejuvenation of Mithapur Canel from Dipak Dutta to Saiyub Alam Plot at ward No 4 within D
Custom Bid for Services - Combined Work for outsourcing of subsidized meal for DDJ Running Room and Sweeping/Cleaning including other associated working activities for DDJ Crew Lobby with Running Room, NH Crew Lobby with Rest Room & BT Crew Lobby wit.. Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
eNIT No 12/APAS/2025-26 Sl No 05
As per bid document
eNIT No 12/APAS/2025-26 Sl No 03
Refer to BOQ
Refer to EPC Schedule
i Re-constn of Bow String Girder type Minor Bridge at km 16.567 of NH35 including its approaches ii extn of existing arch culvert by providing a box culvert adjacent to it at km 3.780 of NH35 iii rehab of existing steel bridge over river Ichamati at
Construction of RCC Drain with slab from 1) H/O Anish to Manoj(Railway Nayanjali) 2) H/O Nasim to H/O Moajin via H/O-Parwez to H/O-Kalu at (Uttar Dalkhola Rahmat Nagar)3.Sanjay Mahato Shop to near Kabristan(NH-34 Undepass) at ward no- 15 under HFA
CS FOR AE FOR SUPERVISION OF (i) Cons./up-gradation of existing road to 2-lane with PS from km 40 to km 61.100 of the Kafer to Reshi border PKG-VA 2. Pedong bypass to Reshi border of NH-717A from km 79.700 to km 96.254 on EPC basis in West Bengal.
Construction of RCC Drain with slab from 1)H/O Abdul Salam to H/O Rafique (Near Nayanjali) Via H/O Abdur Rahman to H/O-Jane Alam, 2) H/O Najir Hussan to Bridge of NH -34 at Doulatpur at ward no- 12 under HFA (PY 2020-21) within Dalkhola Municip
Repr and rehab of 5(five) nos. of RCC Br at i)9.400 km. of Panagrah-Illambazar Rd..ii)8.050 km.of Muchipara-Shibpur Rd.,iii)3.220 km. of NH-2 to DGP Bg at ROB,iv)5.650km at CBM rd v).Goligram-Kutruki-Chandipu rd undr AHD,dist. P Bardhaman FY-2019-20
Construction of CC road from the H/O Uttam Das to Kalimandir Code APAS/01/003/151/0001 Repair of CC road from NH-31 to the H/O Buli Dey Code APAS/01/003/151/0004, APAS/01/003/151/0005, APAS/01/003/151/0006, APAS/01/003/151/0007
Construction of PCC Road 1. from H/O. Rajubala Gharami to H/O. Dipankar Sarkar 2. from H/O. Sanjay Pal to H/O. Soumen Dutta 3. H/O Sanjay majumder to H/O. Partha Chatterjee 4. from H/O. Arjun Pramanik to BSF House 5. from NH- 12 to H/O. Sadhan Ghosh